Web Analytics Made Easy - StatCounter

Cross Bearer Tenders

Get complete information related to latest Cross Bearer Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cross Bearer Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cross Bearer Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40701029 Due date: 18 Jun, 202518 Jun, 2025 NA
Tender For supply of z shape plate (apd) for brake cylinder of bmbs wagon dimension and material as per ann exure a [ warranty period: 30 months after the date of delivery ]

CTN :40699870 Due date: 14 Jul, 202514 Jul, 2025 NA
Tender For supply of yoke support plate for boxn wagon to rdso's drg no. wd-80007-s-14, item no. 6, alt no. 25. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40682925 Due date: 02 Jul, 202502 Jul, 2025 NA
Tender For supply of cross bearer to icf drg. no. t-1-3-600 alt q/40,item-1. matl. & spec. as per drg. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40681746 Due date: 07 Jul, 202507 Jul, 2025 NA
Tender For supply of boxn wagon underframe component as per drg. no. wr-dhd-wn/3-fr-009 item no. 3 bolster plate full for boxn size - 1261x800x10 mm [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40658655 Due date: 24 Jul, 202524 Jul, 2025 NA
Tender For supply of cast steel side frame with liner (duly welded) for blc wagon drawing no. (1) contr-9404- s/3, alt-7 (for cast steel side frame) (2) contr-9404-s/4, alt-13 item no. 6 (for side frame friction liner) (3 ) sk-69597, alt-43, item no. 9 (for brake wear plate) and spec. no. contrlccf-20 (c), rev-2 with amend . no. 2 of sept.2016. [ warranty period: 30 months after the date of delivery ]

State Government

CTN :40227801 Due date: 24 Jun, 202524 Jun, 2025 49.58 Lacs
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu

Central Government/Public Sector

CTN :40640515 Due date: 11 Jun, 202511 Jun, 2025 NA
Tender For procurement of splice plate with fasteners for wagon tippler stage 1 chpbarh

Central Government And Public Sector

CTN :40643092 Due date: 18 Jun, 202518 Jun, 2025 NA
Tender For supply of safety hook plate for bobrn wagon to rdso drawing no. wd-92081- s-56, alt-5, item no.3a. material and specification as per drawing. [ warranty period: 30 months after the date of deli very ]

CTN :40604564 Due date: 19 Jun, 202519 Jun, 2025 NA
Tender For supply of foot step plate for bvzi wagon as per drg. no-wd- 81035-s-19 (sh-2) alt -02 , item no-04, mat. & spec.: is: 2062: 2011(rev.-7), amend. no. 1 of nov. 2012, gr. e 250 a. [ warranty period: 30 mon ths after the date of delivery ]

Central Government/Public Sector

CTN :40586963 Due date: 01 Jul, 202501 Jul, 2025 NA
Tender For supply of hand brake bracket with stiffener plate for boxnhl wagon to rdso drg. no. wd-05086-s-19, alt.-8 or latest, item-16. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up