Tender For supply, installation and commissioning of control office equipments (coe) for data retrieval and analytics system for 3 phase electric locomotives as per part 3 of clw spec.no. clw/c- d&d/es/3/0554issued in april 2024 or latest , scope of supply, specification and scope of work as per annexure-1. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply, installation, and commissioning of a smart pre- engineered building (peb) ward (size 100 feet x 100 feet = 10000 sq feet) intended to housing an automated storage and retrieval system (asrs), including all associated civil, structural, electrical, and foundational works as per attached specifications, drawing and scope of work. [ warranty period: 24 months after the date of delivery ]
Tender For corrigendum : supply, installation and commissioning of control office equipments (coe) for data retrieval and analytics system for 3 phase electric locomotives as per part 3 of clw spec.no. clw/c- d&d/es/3/0554issued in april 2024 or latest , scope of supply, specification and scope of work as per annexure-1. [ warranty period: 30 months after the date of delivery ]
Tender For bid to ras providing of repair and overhauling service - repair and refurbishment of automatic cable storage and retrieval system (asrs) of eps department; m/s vijay machine tools; no; buyer premises
Tender For supply, installation and commissioning of control office equipments (coe) for data retrieval and analytics system for 3 phase electric locomotives as per part 3 of clw spec. no. clw/cd&d/es/3/0554 issued in april 2024 or latest, scope of supply, specification and scope of work as per annexure-1 [ warranty period: 30 months after the date of delivery ]
Tender For supply, installation, testing and commissioning of control office equipment for provision of data retrieval and analytics system for three- phase electric passenger locomotives in electric loco shed bhilai.
Tender For supply, installation and commissioning of control office equipments (coe) for data retrieval and analytics system for 3 phase electric locomotives as per part 0 & part 3 of clw spec.no. clw/c-d&d/es/3/0554 issued in april 2024 or latest , scope of supply, specification and scope of work as per annexure-i. [warranty period: 72 months after the date of delivery ]