Web Analytics Made Easy - StatCounter

Data Digitizer Tenders

Get complete information related to latest Data Digitizer Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Data Digitizer Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Data Digitizer Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :38555402 Due date: 16 Jan, 202516 Jan, 2025 NA
Tender For supply of mafi system spares - cpu unit_servers , power supply for _48vdc , 125hf amplifier ala172 , 20w hf multi-service receiver trc 3700_3 , antenna tuning unit aea390 , high level handset , 1.2 meter celero flyaway antenna , data base management , time server , gps antenna , lightning arrestor , headset with mic

Central Government/Public Sector

CTN :38569634 Due date: 02 Jan, 202502 Jan, 2025 NA
Tender For supply & testing installation and commissioning of single phase prepaid meter system in poly carbonated box: - 230/240vac,50 hz, 1 phase 2 wire keypad based fully type tested, bis (is: 15884) marked, 10-60 amps. base mounted direct current operate prepaid energy meter having capacitive tou ch keypad, calibration led & load controlling feature & provisions for tod (time of day) tariff and r.t.c. (real time clock). in a suitable tamper proof hinge type box along with keypad with bluetooth features must be enable in meter or in freedom/customer interface unit or in both for manually and remotely to ken transfer and abc reading through mobile app os android / ios / windows. provided mobile app should have a provision of offline & online vending toke n process. sms facility for providing the vending token to consumer mobile number provision should be there. all prepaid meters should be provided with int egrated cloud system for prepaid energy meter. warranty of meter should be 10 years from date of supply. amc/annual charges for vending transaction pric e included per meter basis for 7years. demo of installation, commissioning & data base defining, tariff design, mapping the consumer, training should be pr ovided. model:- liberty make:- secure, landis & gyr & genus make/brand=meters should be compatible with secure vendor management system ,vendor has to get it commissioned successfully [ warranty period: 120 months after the date of delivery ]

Central Government / Public Sector

CTN :38517578 Due date: 24 Dec, 202424 Dec, 2024 NA
Tender For providing of custom bid for services - : real time data base management system

State Government

CTN :38220396 Due date: 25 Dec, 202425 Dec, 2024 NA
Tender For corrigendum : supply,installation and commissioning of latest hardware and software for upgradation of it data center at dc lucknow and dr modipuram,meerut including database migration,application migration,log migration and 5 year onsite support with manpower - hardware, servers for core applications:- specs: s1022 - 2*12c, 24 core activated, 1 tb ram (16*64 gb), 4*800gb nvme, 4*2p 10g sr optics+ adapter, 4*2p 32g fiber adapter, aix standard-24c, pha standard - 24c, pvm, hmc + tft for management (1 dc and 1 dr), san storage :- storage with 12x9.6tb fcm4 or equivalent + 512 gb or better cache, 8* 32gbps fc ports = 80 tb usable space. minimum raid06 to be configured and keep provision for hot spare drives. storage management software should be inbuilt / provided along with the software., san switch :- san switch with 8*16 gbps and 16 x 32gbps fc ports or 24* 32gbps by checking all device compatibility with required loaded sfp+ 24*minimum 5m fc cable, ensure a minimum of 24 ports switch. the assessment of ports should be done meticulously, considering the entire infrastructure and including the migration of the existing setup., backup storage :- ensure a minimum of 28tb (13 or 14 sas drives) of usable space with a 32gb cache and 8*16gbps/32gbps fiber channel (fc) ports. raid06 should be configured and keep hot spare drive. the licensing should be evaluated carefully. note that the backup storage will be separate from the primary server san storage. additionally, there should be provisions to double the storage capacity if required in the future., servers for non-core applications/ workload :- dual intel 5th gen xeon gold/platinum 8562y+ 2.8 ghz 60mb cache, 32 cores or higher processor * 2 sockets = 64cores /1024 gb memory/os boot drive 2 x 1.92tb ssd or higher ssd / network port - quad port 1 gbe base t & six port 10g fiber mm with required optics and cables / dual port 16g/32g fc hba / management port dedicated 1 g base- t. server mgt software license from same oem., storage for logs :- 10 tb usable space for logger backup with raid configured with dual port connectivity on both primary and secondary san switch. (extendable up to 20 tb in future), tape library: - tape library with min 10g fiber connectivity with backup software .2xlto9 hh tape drives +2x 25m om3 lc cables+ 32xlto9 cartridges unlabeled + 8xcleaning cartridges. tape cartridges fireproof safe: - two fireproof safes should be installed at both the dc and dr locations for the purpose of backup tape storage., software license, linux operating system :- supporting enterprise-grade linux operating system with comprehensive premium support services. the chosen os must meet stringent enterprise standards, licensed, oem based sla based premium support with regular security patches., windows os :- windows server 2022 standard edition 64 core for non-critical server vms dc: 64 cores*3 =192 coresdr: 64 cores*2 =128 cores, virtualization software: - hypervisor standard subscription for all non-core application physical server and hypervisor manager standard (one for dc and one at ndr) 6-year subscription and premium support. no. of licenses shall be as per the physical cores for non-core servers mentioned item no.5 (servers for non-core applications/ workload).dc: 64 cores*3 =192 cores.dr: 64 cores*2 =128 corestotal: 320, oracle db :- oracle enterprise editions for production database1. production db (dc and dr) = 62. rac (dc)- 43. active data (dc and dr) = 64. partitioning (dc and dr)- 6oracle database standard edition 2 with 30 nups (for dc and dr for third party amr db and testing db at dc), annual technical support (ats)/product update for all oracle products listed on sl. no. 11 and 13 for 5 years, db license enterprise :- standard license for database of antivirus server/hips, antivirus software :- for all physical and virtual servers, nms (network monitoring system) :- tool for infrastructure monitoring monitoring of both dc and dr infrastructure from single locati
 Loading, Please wait...

Connect us via What's Up