Get complete information related to latest Deaerator Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Deaerator Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Deaerator Tenders.
Tender For corrigendum : up-keeping at various locations such as boiler and turbine areas such as all lies jbs transmitters rtds thermocouples positioners switches pneumatic control block valves movs burner tilts and feeder floor area local control panels and lies cold air dampers and hot air dampers all heei igniters system hfo lfo nozzle valves sh and rh spray station mill rejects area and zero meters, lp heaters floor, hp heaters floor, turbine floor, cw pump house area battery room deaerator floor instruments and any other area in the scope of boiler and turbine sub division as directed by engineer-in-charge in i and c-stage-1-btps for the period of 01-04-2025 to 31-03-2026
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit; inspection and dynamic balancing of syn gas compressor turbine rotor assembly as per sow and quantum of job; service provider
Tender For providing of custom bid for services - contract for miscellaneous gas turbine exhaust repair works for ge 9fa gas turbine gt 3b at rgppl site
Tender For providing of repair and overhauling service - repairs of gas turbine and gas turbine generator starters; as per scope of work; no; buyer premises
Tender For corrigendum : tender for supply of pressure control valve in bfp discharge , hph-2 to hph-1 lcv , hph-2 to flash tank lcv , hph-1 to deaerator lcv , hph-1 to flash tank lcv , dm water heater level control valve
Tender For mtps - i - tm ?? unit ?? iii - renewal of gasket at water box side, tube nest side, condensate inlet and outlet flange, inspection and cleaning of tube nest and hydraulic testing of lph- 3 & 4, gc-1, changing the defective valves es ??3, replacement of defective flash tank-i end metallic expansion bellow (e-5), hd-14 & 15, deaerator pressure control valve, vdas-122, 10-a & 10-b inlet & outlet isolation valves by cutting & welding during the year 2025-26.