Tender For proposed consultancy service for widening of sardar patel road slip road to conduct topographical survey geotechnical preparation of drawing detailed design boq preparation consultancy service at zone 13
Tender For proposed consultancy service for 8lane widening of kamarajarsalai promenade block costestimate reach-iv 2101-2800m to conduct topographical survey, geotechnical,preparation of drawing,detailed design, boq preparation and consultancy service at zone 9
Tender For proposed consultancy service for 8 lane widening of kamarajarsalai promenade block cost estimate reach - ii 701-1400m to conduct topographical survey, geotechnical, preparation of drawing, detailed design, boq preparation and consultancy service at z
Tender For proposed consultancy service for widening of gandhi mandapam both side slip road north side west south side east to conduct topographical survey geotechnical preparation of drawing detailed design boq preparation consultancy service at zone 13
Tender For proposed consultancy service forwidening of dr.radhakrishnansalai (slip road) to conduct topographical survey, geotechnical, preparation of drawing, detailed design, boq preparation and consultancy service at zone 9
Tender For proposed consultancy service for 8 lane widening of kamarajarsalai promenade block cost estimate reach - iii 1401 -2100m to conduct topographical survey, geotechnical, preparation of drawing, detailed design, boq preparation and consultancy service a
Tender For proposed consultancy service for 8 lane widening of kamarajar salai promenade block cost estimate reach -i 0-700m to conduct topographical survey geotechnical preparation of drawing detailed design boq preparation consultancy service at zone 09.
Tender For corrigendum : providing projectmanagement consultancy service including supervision, quality assurance, progress monitoring / reporting, measurement, billing and documentation for the work of construction of 64 pc quarters at begur in bangalore under police gruha 2025 (phase-5) scheme package no.61 on lumpsum, no variations (fixed price), contractors own design turnkey basis - conventional method of constructions (framed structure) (stilt plus g plus 7 floors)