Tender For supply of srphc154080-mri conditional pacing system with accessories for delivery of cardiac resynchronization therapy. system should include a current generation mri conditional crt pulse generator bipolar steroid-eluting atrial and ventricular leads and a quadripolar left ventricular ( coronary sinus ) lead and accessories ( lead introducers sheaths or guiding catheters etc.). should provide independently programmable right and left ventricular pulse outputsand interventricular delay ( with the choices of right ventricular alone left ventricular alone or biventricular pacing as well as the choice of which ventricle is to be paced first with optimization of delay for pacing of other ventricle ). should have features like negative av hysteresis and triggered modes for continuous delivery of crt. should have advanced features for detection and management and prevention of atrial tachycardias and atrial fibrillation as well as detailed data storage of all arrhythmias and therapy as well as trends over time. should have features for management of atrial fibrillation including mode switch ventricular rate management etc. pulse generator should be suitable for use with either an endocardial lv lead or an epimyocardial lead for lv stimulation. lv leads should have optimalfeatures for introduction positioning and fixation and documented low displacement rates. unit:no ]
Tender For “upgradation of electronic water level indicator (ewli) system at btps unit-1” per the technical specifications given in the job order.shifting of material to work place.inspection of material in presence of indenter & stores.power off the existing system, isolation & removing of existing bhel vision -20 m pressure vessel/cable/ ascertor/electronics cabinet/rdu equipments and shifting to designate area.replacing the new ewli system pressure vessel/cable/ ascertor/electronics cabinet/rdu in the existing location, ensuring of all connections and power on the system.checking/testing of healthiness (alarm, trip, analog output contacts and display) of the system and commissioning.any additional items, tools, accessories required for carry out the above work shall be contractor/supplier scope.satisfactory operational performance has to be ensured.shifting of released material to stores.training of plant personnel for operation and maintenance of new ewli system.it is the complete responsibility of the firm to execute the job & to bring back the system in to operation without time delay