Web Analytics Made Easy - StatCounter

Disconnecting Switch Tenders

Get complete information related to latest Disconnecting Switch Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Disconnecting Switch Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Disconnecting Switch Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :38571965 Due date: 13 Jan, 202513 Jan, 2025 NA
Tender For strengthening of safety system of power cables in trenches and associated work with digital liner heat detection cable system lhdc in 220 kv switch yard at 400 kv substation, rishikesh

CTN :38582736 Due date: 09 Jan, 202509 Jan, 2025 NA
Tender For construction of store building (size 18mx7m), cement concrete flooring(100mx12m),complete renewal of turn out with new 60kg (1 in 8.5) curve switch with cmsc on psc layout and linking of track in connection with development of sick line facilities at r-yard at jharsuguda.

Central Government/Public Sector

CTN :38421418 Due date: 18 Dec, 202418 Dec, 2024 44.31 Lacs
Tender For corrigendum : civil work for switch yard extension for 132kv transformer in cffp,bhel, haridwar.

State Government

CTN :38583660 Due date: 19 Dec, 202419 Dec, 2024 6.71 Crore
Tender For various civil maintenance works to the control room, dc office and chainlink fencing of the switch yard at 33 kv s/s umari, tq saoner dist nagpur

CTN :38419604 Due date: 28 Feb, 202528 Feb, 2025 NA
Tender For construction of underground power house building, tail race tunnel, switch yard and other associated work of power house site, adits , mat, vertical pressure shaft & steel liner including branch tunnel & associated project roads

CTN :38034531 Due date: 26 Dec, 202426 Dec, 2024 42.67 Lacs
Tender For corrigendum : pcc with remetaling of 132kv and 33kv switch yard at 132/33kv grid sub-station, patnagarh under eht operation and maintenance division, balangir

State Government

CTN :38558028 Due date: 27 Dec, 202427 Dec, 2024 38.06 Lacs
Tender For renovation of earth mat in the 220/33 kv switch yard at 220 kv sub-station kodur under rmi scheme 2023-24.

corporations/Associations/Others

CTN :38513929 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jari distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jari distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513944 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect

corporations/Associations/Others

CTN :38513945 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with c
 Loading, Please wait...

Connect us via What's Up