Get complete information related to latest Disposable Medical Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Disposable Medical Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Disposable Medical Tenders.
Tender For annual plan 2024-25, nilambur municipality, pr.no.573/25 chaliyapurath ida vazhi in ward 27 - surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m., od245020/2024_2025 (derived from dar 51.2.3) filling with quarry muck filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade, od245021/2024_2025 providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) nominal mix (1:2:4) a)materials , od245011/2024_2025 providing and fixing granite of any colour & shade for name board of required size laid over base of cement mortar 1:4(1 cement : 4 coarse sand), including all charges etc, complete at all levels, including lettering & fixing.
Tender For pdlp-rkl-15 of 2024-25 - part-i, clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of grith upto 300mm removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means andstacking of serviceab, road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified materials with in all lifts and lead upto 1000 metres etc.complete., road b - koelsata to bhuyanbasti or-30-414, providing 37.5mm thick built up spray grouting after scrapping, cleaning the road surface applying tack coat using 3.00kg of bitumen for 10sqm and laying of one layer of 37.5mm thick by using 0.45cum of 25mm to 40mm grade bitumin for 10 sqm in each layer with 0.12 cum of 12mm size b.h.g. c.b chips as key stone for 10 sqm.spreading over and laying induding heating pouring, spreading bitumirl metal and chips and compacting with p.r.r including cost ,conveyance royalty taxes of all required metterials,hire and running chsrges of mechinaries t&p etc complete as per direction of the engineer-in-charge, road a - goldaru to ganjutola or-30-209, road c - nuagaon to sahupada or-30-210, painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new plastered /concrete surfaces as per drawing and technical specification under section 1700 of mord., road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, providing rainforced cement concrete of (1:2.5:5) with 20mm to 40mm size stone aggregate in foundations upto a depth of 1.5m below ground level and upto a height of 1.5m above ground level / bed level including cost and conveyance of all materials to site, and all labour charges complete as per direction of e.i.c., road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, providing and fixing of retro reflective cautionary, mandatory and informatory sign board as per irc:67 made of high intensity grade sheeting as per clause no 801.30 fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle iron post 75x, 800x600 mm information board, road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, 600 mm circular cautionary sign, road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, 900 mm triangular cautionary sign, road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, 600x450 mm place identification board, road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, providing & laying good laterite moorum for filling road flanks including cost and conveyance of all materials to site, and all labour charges complete as per direction of e.i.c., road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, providing,& laying following size metal as per most specification for irc. gr-ii/ gr-iii metalling to a uniform thicknes of 100mm and packing the voids with small stones and hnd packing the same to proper camber including conveying and spreading moorum etc complete, road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti or-30-414, road c - nuagaon to sahupada or-30-210, earth work in excavation of foundation in hard soil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed e.i.c., road a - goldaru to ganjutola or-30-209, road b - koelsata to bhuyanbasti o
Tender For tender for supply of carefully removing the veneering wall etc. , after proper documentation bringing them down at a height of 2.50 mtr , stocking for reuse , erecting and removing of supports at down properly etc. , complete. , carefully removal of core filling in between stone masonry veneer wall and stacking the useful materials and conveyance of debris to a far away from the monument premises , etc.complete , excavation/scientific clearance of earth deposit to retrieve fallen architectural stone elements and to expose the buried plinth and original floor & drainage system , including stacking useful stones and disposing of the excavated earth after proper screening outside the temple complex , etc.complete. , carefully resetting the old available veneer stone and new stone in original position in lime mortar 1in2 including necessary pointing the stone joints in same mortar with suitable colour oxides , curing , as per the standard specifications and as directed etc. complete. , construction of brick work for corefilling and in the edges with country bricks specially made as per requirement in lime mortar 1in2 , curing etc. , complete. , providing apron and pathwaty using new stone flooring slabs of size 1.20m to 0.90m in length 0.60m to 0.45m in breadth and 3inch to 4inch thick properly dressing as per the old available clues setting in lime mortar 1in1.5 above the foundation concerete and pointing the stone joints with lime mortar 1in2 curing etc.complete. , supplying and making of new veneer stone with good quality of new stones properly dressing all sides and architectural designs as per the available clues in the place of damaged and missing members etc.complete. , disposal of waste and unserviceable materials outside temple premises , stacking the stone members and leveling the undulated area , etc.complete. 1.disposal of building rubbish or malba or similar unserviceable , dismantled or waste materials 100 cum 2. removal and stacking of store members 75 cum 3. for leveling the area-creation of parking space approximately size of 80m x 6m x 0.50m 240 cum
Tender For surface dressing and disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials from the community centre plots to be developed as hotel on license fee basis in sector 23 b dwarka.
Tender For upholstery of old furniture items - sofa set of sorts, removing of old tapestry and refixing of new tapestry excluding cost of tapestry, but including cost of all fixing material viz. tinax, nail, cotton rope/tightening to sofa sets of sorts., i) five seater in 3 pcs (3+1+1) (full set), four seater in 3 pcs (2+1+1) (full set), sofa of different seats, 3 seater (single), 2 seater (single), 1 seater (single), removing of following old/damaged items and fixing of all such corresponding items by new one including cost of new items to sofa set of sorts, a. spring of heavy quality of required size and shape, b. coconut grass, c. lining cloth (khadir), d. providing and fixing of cotton nawar of superior quality, e. providing and fixing of superior type hessian cloth (gunybag) over the spring sets, f.providing and fixing of superior type feather , g.providing/fixing of superior type bottons , providing and fixing of foam 32 density., a. 1/2 , sleep well, nindya., b. 1 , sleep well, nindya., c. 2 , sleep well, nindya., d. 3 , sleep well, nindya., e. 4 , sleep well, nindya., providing of loose cushions, a. 16``x16``, b.18" 18", c 20`` x 20``, d.24`` x24``, pro/fixing of loose cushion cover (sofa), a. 16``x16``, b. 18" 18", b. 20`` x 20``, c.24`` x24``, providing/fixing of 32 density foam of high quality loose cushions/back cushions., a. 3 x 21 x 22 , sleep well, nindya., b. 4 x 21 x 22 , sleep well, nindya., c.providing/fixing. of fancy rope, d. replacement of wooden legs of hard wood duly spirit polished, e.replacement of damaged arm of sofa set by new one of hard wood., providing/fixing of sofa legs (stainless steel), a. 2 , b. 3 , c. 4 , pro/fixing of thepa wooden mdf, replacement of hard wood rails/central supports of required size/shapes (i.e cost of hard wood and all fixing materials duly fixed :, a. 1 x 1 , b. 1 x 2 , c. 1 x 3 , d. 1 x 4 , chairs of sorts., removing of old tapestry and refixing of new tapestry (excluding cost of tapestry), but i/c cost of all fixing material viz. black tintex, nails, cotton rope etc. to chairs of sorts including tightening., a. office chair, b. easy chair, c. banquet chair, d. box chair, e. conference chair, f. queen chair, g. dining chair, h. revolving chair, computer chair, removing of following old/damaged items and fixing of all such corresponding items by new one including cost of all such items duly fixed., a) lining cloth (khadir) to the lower base of chair., b) cotton nawar (underneath) to seat and back chairs of sorts, c) hessian cloth (guny bag) under foam seat back over cotton nawar to seat and back of chairs., d) 6 mm thick plywood to the lower base of chairs, providing /fixing of foam 32 density, a. 1/2 , sleep well, nindya., b. 1 , sleep well, nindya., c. 2 , sleep well, nindya., d. 3 , sleep well, nindya., f. bamboo chair, cushions for bamboo chairs excluding cost of tapestry (complete job), a. 2 , sleep well, nindya., b. 3 , sleep well, nindya., c. 4 , sleep well, nindya., g) beds of sorts/day beds\dressing stool, a.) removing of old tapestry and refixing of new tapestry i/c cost of all fixing material but excluding cost of tapestry, i) single bed, ii) double bed, iii) day bed, iv) dressing stool, providing /fixing of foam 32 density, a. , sleep well, nindya., b. 1 , sleep well, nindya., c. 2 , sleep well, nindya., a). office screen, complete upholstery including cost of all required material but excluding cost of tapestry to:, i) office screen, b. swing (jula), a.) removing of old tapestry and refixing of new tapestry including cost of all fixing material but excluding cost of tapestry, b.removing of old acrylic fabric and re-fixing of new acrylic fabric including cost of all fixing material/ stitching , c). providing/fix of foam 32 density, a. 2 , sleep well, nindya., b. 3 , sleep well, nindya., c.4 , sleep well, nindya., d. peon bench (cushion seat/back)/sofa type bench, a.)removing of old tapestry and refixing of new tapestry i/c cost of all fixing material but excluding cost
Tender For repair of furniture items. - chairs of sorts, i) replacement of wooden items of hard wood of require size /shape to chairs of sorts duly polished, a) wooden legs, b) wooden arms, c) wooden back frame, d) wooden seat frame, ii) replacement of plywood of required size /shape to bottoms of chairs of sorts. , a.) 4mm, b.) 6mm, c.) 12 mm, iii ) routine carpentry repairs of chairs by way of fixing of nails, fevicol and easement of chairs, beds of sort/day beds, a) pro/fix of 19mm thick block board to the seats of beds fitted with required material, b) replacement of hard wood rails/centre supports of required size/shape i/e cost of hard wood and all fixing materials duly fixed/spirit polishing., i) 1 x1 , ii) 1 x2 , iii) 1 x3 , iv) 1 x4 , c) pro/fixing of sunmaica of required thickness to beds i/e cost of all fixing materials and fixing charges duly fixed., d) pro/fixing of new plywood of superior quality to the beds under sunmaica i/c cost of plywood all fixing materials and fixing charges , a.) 4mm, b.) 6mm, e) pro/fixing of teak wood to beds of sorts i/c cost of teak wood and other fixing material etc., f) pro/fix of first class plain beeding to outer edges of beds i/c cost of fixing material /fixing charges, i) , ii) , iii) 1 , iv) 1 , v) 2 , g) pro/fix of bed joints, h) routine carpentry repairs of beds by way of fixing of nails, nuts, bolts, fevicol and easement of beds, centre tables/teapoys/peg tables/bed side tables:, a) replacement of damaged sunmaica top with sunmaica of required thickness duly fixed with fevicol and other required materials i.e.cost of sunmaica and other material., b) replacement of plywood under sunmaica of required thickness duly fitted with required material i.e. cost of all material/plywood, i) 4mm, ii) 6mm, iii) 12mm, iv) 19mm, c) replacement of following & fixing of new items duly spirit polished and i/c cost of al lmaterial, i) wooden legs, ii) wooden rails, iii) wooden support under top, d) pro/fixing of glass panes i/c cost of all material and fixing charges with moulding, i) 5mm black glass top, ii) 8mm tinted glass top, iii) 8mm plain glass top, iv) 10 mm tinted glass top, v) 10mm plain glass top, vi) 12mm tinted glass top, vii) 12mm plain glass top, e) pro/fix of first class plain beading to outer edges of tables of sorts i/c cost of fixing material /fixing charges., i. , ii. , iii. 1 , iv. 1 , v. 2 , routine carpentry repairs of centre tables, teapoy, pegtable/bedsides tables by way of fixing of nails, fevicol and easement of tables., dressing tables of sorts, a) replacement of damaged sunmaica top with sunmaica of required thickness duly fixed with fevicol and other required materials i.e cost of sunmaica and other material, b.)replacement of plywood under sunmaica of required thickness duly fitted with required material i.e cost of all material/plywood, i). 4mm, ii) 6mm, iii) 12mm, c) providing/fixing of wooden legs, d) providing/fixing of wooden frame under mirror, e) providing/fixing of plywood to back mirror frame, f) providing/fixing of mirror fitted with clips of required size, g) providing/fixing of knobs, h) providing/fixing of hinges, office tables of sorts/computer tables, a) replacement of damaged sunmaica top with sunmaica of required thickness duly fixed with fevicol and other required materials i/c cost of sunmaica and other material, b) replacement of plywood under sunmaica of required thickness duly fitted with required material i.e cost of all material/plywood., i.) 4mm, ii.) 6mm, iii.) 12mm, iv.) 19mm, c) providing/fixing of knobs, d) providing/fixing of hinges, e) providing/fixing of link locks, f) providing/fixing of computer channels, g) providing/fixing of handles for tables complete job, i) 2 , ii) 3 , iii) 4 , iv) 5 , routine carpentry repairs of office tables/computer tablesby way of fixing of nails, fevicol and easement of office tables, computer tables, 6. replacement of door/window canopies, a. re-fixing of new (window/door)canopies including all fixing mater