Get complete information related to latest Distribution Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Distribution Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Distribution Valve Tenders.
Tender For camc including consumables, repairs and replacement of defective parts of 1000 lpm ogp along with allied electro mechanical equipments along with operational charges for 01 year at gmc ah rajouri - comprehensive annual maintenance (camc) camc of oxygen generation plant ( airsep make 1000 lpm complete unit) which includes periodic servicing/maintenance and repairs of complete ogp unit (consisting of oxygen modules, air compressors (110 kw ingersoll rand make, air dryers (trident make), filtration assemblies, air tanks, oxygen tanks, interconnecting pipeline, control valves, indicators, sensors, pressure & purity meters, ups, electric panel, valve panel, and other allied accessories, etc.), (including topping/replacement of molecular sieve (zeolite/alumina/any other chemical as per requirement), copper pipeline from plant room upto patient beds, allied equipments such as main 630 amp. electric distribution cum changeover panel, mccbs/acbs, 400 kva avr (ae make), 250 kva avr (jaima make), 400 kva dg set sudhir power make (including replacement of batteries), amf panel, cabling, lightening arrestor, earthing, etc., other miscellaneous items of the plant room such as lighting, exhaust fans, ceiling fans, cctvs with inverter battery set, electric wiring and fittings, refilling of abc type fire extinguishers, other minor civil items, etc. the job also includes repair/replacement of defective pipeline from air compressors to air tanks/air dryers to psa tower in order to make it leak proof.the technicians for operation will be responsible for preventive maintenance, minor repairs/settings on a routine basis. major breakdowns of the plant equipment to be repaired by the firm through oems/open market workshops, etc. for maintaining the plant in working condition the firm will bear all charges of material including consumables, labour, transportation and all taxes as applicable.any other item of the oxygen plant not mentioned in the above description, but found necessary for the functioning of the plant, is deemed to be covered under the oc/camc contractfirst year, second year, third year, fourth year, fifth year, sixth year, seventh year, operational contract (oc)24x7 operation of 1000 lpm psa oxygen generation plant ( airsep make complete unit) and it s all allied equipments including power backup. the technicians for operation will also be responsible for preventive maintenance, minor repairs/settings on a routine basis. wages of the operators/technicians (3 nos + 1 no) for 01 year (12 months) having experience of similar work.first year, second year, third year, fourth year, fifth year, sixth year, seventh year
Tender For ttps es circle mrt i unit iii annual overhauling of turbine side valve actuator electrical portion limit switch torque switch assemblies for the year 2025 26
Tender For addition and alteration including augmentation of water supply storage and distributionvalves system with connected items at arga naval base area under ge(sb) karwar.
Tender For 1) operation & maintenance work contract for hydraulically operated pedestal mounted stone grapple machine on as and when required basis installed in c.h.p.-ii (1x500 mw), t.p.s., khaperkheda, 2) work of complete repairing, reconditioning and refurbishment along with all required spares & accessories for the travel system of shuttle conv. 1 to 4 installed at chp-i, tps khaperkheda, 3) work of providing, fixing and testing of coal flow establishment system for conveyor chutes of apron feeder no. 1 to conv. 2c, apron feeder no. 2 to conv. 2d and conv. 3a to conv. 4a installed at chp-i (4 x 210 mw), tps khaperkheda, 4) work of annual overhaul maintenance of air preheater for unit no. 4, 5) work of repairing flue gas duct from eco outlet to esp inlet during unit no.4 coh., 6) work contract for conveyor belt jointing by cold / hot vulcanizing process at c.h.p.-ii,t.p.s. khaperkheda, 7) servicing of various doors, manholes of boiler during unit no. 4 aoh, 8) biennial work contract for housekeeping/cleaning to be carried out in service building acw/ccw p/h, time office etc at unit-5, 500mw, khaperkheda tps., 9) supply & application of chemical bonded plastic refractory for boiler during unit no. 4 aoh., 10) procurement of 22" victaulic coupling and sampling plug assy for coal pipes for unit 3 & 4, 11) work of radiography and interpretation of hp weld joints in boiler unit 4 during coh, 12) work of repair of boiler first & second pass buck stay in unit no. 4 coh., 13) supply of pa fan shaft for ndv 18 tiefstack in unit no. 1 & 2., 14) procurement of dresser coupling & coupling collars for coal pipe in unit no. 1 aoh, 15) procurement of guillotine gates chain links for u#4 coh for ahp-i, 16) supply & application of chemical bonded and firecrete refractory in boiler second pass and flue gas duct during unit no. 4 coh., 17) procurement of glands packing & spiral gaskets for coh u#1&4., 18) supply & application of fire crete refractory and allied works of bah for unit no. 4 coh, 19) procurement of fabricated burner tilt pins, levers & spares for 210 mw unit aoh, 20) procurement of spares for bfp recirculation valves.(u # 4 coh)., 21) servicing of gates & dampers of air & flue gas path in unit no. 4 aoh., 22) procurement of rcw headers and scalloped bars for unit 1 aoh of bah., 23) replacement of damaged g.i. roof sheets above at wagon tippler, bobr hopper area and various conveyor belts galleries at chp-i, khaperkheda tps., 24) procurement of various low pressure and low temperature steel consumable for u#1 coh., 25) supply of liner assembly (in 2 halves) for upper housing of coal mill xrp-803 hp at unit no. 1 & 2., 26) work of fabrication and replacement of reheater coil stub bend assemblies during unit no. 4 coh, 27) overhauling/servicing of low pressure valve during unit no. 1 & 4 capital overhaul, 28) procurement of various gromet slings for capital overhauling of unit 1 and 4, 29) removal and shifting of ndct drift eliminator during coh at unit no. 05, 1x500 mw, tps, khaperkheda., 30) work of providing and fixing of conveyor spillage control equipment at chp-i, tps, khaperkheda.