Web Analytics Made Easy - StatCounter

Dozer Engine Scrap Tenders

Get complete information related to latest Dozer Engine Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Dozer Engine Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Dozer Engine Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40315966 Due date: 23 May, 202523 May, 2025 5.14 Lacs
Tender For repair and overhauling service - repair and overhauling services dsl l-50 to l-55 , e-41 to e-44 and h-69 for icgs c-411; dsl l-50 to l-55 , e-41 to e-44 and h-69 for icgs c411; no; buyer premises-icgs c-411 l-50: ship s boat davit not working due to defective rotary switch (25 amp, qty-02 nos.) and 10 pin male & female connector (20 amp) of remote assembly is broken/defective. defect to be rectified and proved for satisfactory operation. in-way job includes renewal and fitment of rotary switch and connector as per sample l-51: 01 no. ecdis ups (make-apc, cap-1500 va, 865 w) not working due to defective charging circuit and defective converter. defect to be rectified and proved for satisfactory operation. l-52: ship is fitted with 08 nos. flood lights (mercury/halogen type) onboard. all flood lights to be repaired/replace with flood lights as per policy in vogue. in way job includes removal and fitment of lights, clamps and wiring as per standards and proved for satisfactory operation. l-53: 01 no. hand set ptt of mf/hf communication unit (make: samyung, model: srg-2250) and 01 no mic of hf marine (make: icom, model: ic m802) is malfunctioning due to defective mic/cable and multi pin connector. defect to be rectified and proved for satisfactory operation. l-54: 02 in nos. splash proof microphone of main broadcast is malfunctioning due to defective mic and multi pin connector. defect to be rectified and proved for satisfactory operation. l-55: 02 in nos. of exhaust/supply fan in waterjet compartment not working due to defective bearing and showing low insulation. defect to be rectified and proved for satisfactory operation. in-way job includes repairing/renewal of motor trunking and welding of supporting clamps as per sample (mat: ss clamps and gi sheet) e-41: leakage observed in 02 nos. fuel ball valve in engine room. ball valve to be overhauled and pressure test to be done up to 1.5 times of working pressure. (dia: 50 nb, working pressure: 1.5 kg/cm2) e-42: performance of ac plant observed to be low view scaling found in ac condenser.ac condenser to be chemically cleaned and gasket (both ends) along with nut & bolt to be renewed as per sample. (gasket mat: rubber, nut & bolts mat: ss 316) e-43: 02 nos shaft seal cooling hose of waterjet along with adapter deteriorated due to aging/long usage. hose/adapter to be repaired/renewed as per sample. (mat: rubberized pressure hose, length:1.5 mtrs. e-44: domestic sea water pump is not developing sufficient discharge pressure. sea water pump to be overhauled and proved for satisfactory operations. inway job includes removal and fitment of pump to done. h-69: wooden locker at dining hall deteriorated and cracked. door of the locker perished. locker to be repaired/renewed. mat: wood..

Central Government/Public Sector

CTN :40230140 Due date: 17 May, 202517 May, 2025 NA
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - ship; main engine truncking; service provider

CTN :40289556 Due date: 30 May, 202530 May, 2025 NA
Tender For custom bid for services - preparation of ietm document for ship system and integration of equipment ietm onboard ship-supply of equipment ietm-+-1. engg main engine, 2. engg. gear box, 3. engg. shafting, 4. engg diesel alternator with accessories, 5. engg steering gear, 6. engg. fin stabilizer, 7. engg. hvac, 8. engg. ac plant, 9. engg stp, 10. engg lo centrifuge, 11. engg fo centrifuge, 12. engg salvage, 13. engg fire pump, 14. engg afac, 15. engg bilge pump, 16. engg ro plant, 17. engg fresh water pump and hydrophore tank, 18. engg ows, 19. engg hp air cylinder, 20. engg ref plant, 21. engg hpac(dd), 22. engg hpac(md), 23. engg fo transfer pump (gear pumps), 24. engg lo transfer pump (gear pumps), 25. engg magazine fire fighting system, 26. engg fm 200 fire fighting system, 27. engg nbcd pumps, 28. engg dirty oil pump, 29. engg ba charging compressor with accessories, 30. engg avcat pump, 31. engg avcat filter water seperator & absorber, 32. engg fuel oil stripping pump, 33. engg diesel driven fire pump, 34. engg emergency da, 35. engg iccp & asg, 36. l&w advanced composite communication system (accs), 37. l&w atds, 38. l&w auto telephone, 39. l&w degaussing, 40. l&w cms, 41. l&w cctv, 42. l&w cable tv , 43. l&w em log, 44. l&w echo sounder, 45. l&w ew esm varuna, 46. l&w eon 51, 47. l&w ibs & gyro, 48. l&w kavach, 49. l&w link ii mod iii, 50. l&w lan system, 51. l&w mbsre & intercom, 52. l&w msb, 53. l&w apms, 54. l&w ak630, 55. l&w nlcp, 56. l&w radiac, 57. l&w sp telephone, 58. l&w sdn, 59. l&w srgm, 60. l&w srcg, 61. l&w sicad, 62. l&w tacan, 63. l&w trigun, 64. l&w uwt, 65. l&w v/uhf comint df search receiver (nayan), 66. l&w xbt, 67. l&w lynx u2, 68. l&w ipms, 69. l&w window wiper, 70. l&w hvlas, 71. l&w hdcs, 72. hof hangar door, 73. hof asist, 74. hof instruction, operation and maintenance manuals, cpl & pil of, store lift, 75. hof instruction, operation and maintenance manuals, cpl & pil of, 3t boat davit , enclosure: 2-list of engineering system -1. fuel oil service system, 2. sea water cooling system, 3. hp compressed air system, 4. bilge system, 5. ballast system, 6. air vent system, 7. sounding system, 8. fw system, 9. scupper system, 10. cpp hydraulic oil system, 11. fo filling & transfer system, 12. lo system, 13. lp compressed air system, 14. firemain and sprinkling system, 15. salvage system, 16. incinerator piping system, 17. afff system, 18. stp & vacuum toilet system, 19. avcat system, 20. shafting arrangement, 21. intake & exhaust arramgement, 22. bhd & ladder cooling system, 23. chilled water system, 24. fo stripping system, 25. hot water system, 26. fm 200 fire fighting system, 27. ows system, 28. pre-wetting system, 29. hvac ducting layout, 30. smoke diagram, 31. refrigerant system for ref plant.

Central Government/Public Sector

CTN :40228459 Due date: 26 May, 202526 May, 2025 39.9 Thousand
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - ship; l089 ships main broadcast system not working e108 sea chest purging valve of three main engine not operating properly e109 air leakage observed from solenoid val..
 Loading, Please wait...

Connect us via What's Up