Web Analytics Made Easy - StatCounter

Drain Valve Repair Tenders

Get complete information related to latest Drain Valve Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Drain Valve Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Drain Valve Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :36272243 Due date: 19 Jun, 202419 Jun, 2024 NA
Tender For supply of wooden block, (deleted) jack screw lifting 4 tons, jack hyd lifting 5 ton trolley type clos, secondary fuel filter 1 liter(star type), lever tyre car or truck, horn electrical 12 volt, lamp filament 12v 35/35w bosch dc clear, bearing, switch assy change over, mounting rh front/lh, mounting rh rear, hose rubber, s/a of fuel pipe feed pump to filter, black out change over switch, lamp assortment/helogen bulb 24v/60/65w, parking light bulb 5w, bag tools and spare parts(tool kit bag), tommy bar complete, assy rear view mirror lh/rh, exhuast brake switch, parts kit hydraulic ram/ram service kit, parts kit pressure regulating valve, delivery hose canvas 38mm x 30m with mal, grease gun, insp lamp with 10m cable comp w/single, head lamp bulb a 12v 45/40wdin 72601,

Central Government/Public Sector

CTN :36266697 Due date: 05 Jun, 202405 Jun, 2024 NA
Tender For supply of control valves and valve bank-pressure regulating against h6a1x37381

CTN :36267051 Due date: 19 Jun, 202419 Jun, 2024 NA
Tender For supply of push button black, nut, lamp assembly, space heater 60w 230v ac, power contactor 12a, timer, high pressure, low pressure and oil pressure cutouts, hex. head bolts & nuts (for srl no. 6), dowty rings for compressor, cylinder liner, v contact element for p.b.s, h.p.cut out, high pressure-low pressure and oil pressure gauges, gasket, neoprene inchoinch ring, ammeter 0-125 amp, suction/oil pressure gauges (r-22), refrigerant pressure gauges, v-belt for seawater pump, cylinder liner with suction valve, bushing for piston pin, three way solenoid valve-230v, hrc fuse 32 amps, oil charging hose, charging manifold (modofied), valve spring, oil pressure failure, oil pressure regulating valve

CTN :36260374 Due date: 17 Jun, 202417 Jun, 2024 NA
Tender For supply of set of spares required to maintain sil make air dryer as follows:- (i) drain valve assembly, sil dr awing. no: 09890101 = 02 nos. (ii) purge valve right, sil drawing. no: 09890201 = 02 nos. (iii) purge valve lef t, sil drawing. no: 09890202 = 02 nos. (iv) drain valve repair kit, sil drawing. no: 09891101 = 10 sets. (v) pur ge valve repair kit, sil drawing. no: 09891201 = 14 sets [ warranty period: 30 months after the date of deliver y ]

CTN :36239497 Due date: 13 Jun, 202413 Jun, 2024 NA
Tender For supply of bid of quantity - piston , ignition switch , pressure protection valve , nozzle , parts kit pressure regulating valve , gear helical ,armature motor , repair kit for piston , lamp assy

Central Government/Public Sector

CTN :36113501 Due date: 28 May, 202428 May, 2024 NA
Tender For corrigendum : supply of control valves - oe9751006007-double pilot air valve 2ha-2 , oe9751007003-single pilot air valve 2ha-1 , oe9751008000-srelay valve wabco pno-p55162 , oe9751011000-inter lock valve - 06-000-811 , oe9751012015-transmission control valve wabco p59340 , oe9751020034-over ride valve-2411-twin stop assy , oe9751078024-seal rotor-type c2 , oe9751079012-chock valve 1 by 2 inch-14nptf , oe9751081017-control valve hc-2-sx-with handle , oe9751082013-control air valve oil well no 06-000- 085 , oe9751083273-check valve wabco no p55026-17 , oe9751084016-pressure regulating valve , oe9751084113-pressure gauge 0-200 psi , oe9751472016-valve bank-pressure regulating-fsbs

Central Government/Public Sector

CTN :36234588 Due date: 12 Jun, 202412 Jun, 2024 NA
Tender For supply of pressure regulating valve

CTN :36123505 Due date: 24 May, 202424 May, 2024 NA
Tender For bid to ras supply of lv7/maruti 09280m19001 o ring speedometer driven , lv7/maruti 89031m80000 tank assy fuel , lv7/tata 2786-1599-9901 tensioner belt , lv7/stln 4810-007948 parts kit pressure regulating valve , lv7/stln 6240-72-0468908 head light bulb 55/60w

CTN :36040613 Due date: 28 Jun, 202428 Jun, 2024 NA
Tender For corrigendum : procurement of spares for mirage aircraft - coil, ignition, efcs box iiii, shaft,drive *, pump,self-regulating, back up box, lablebox, lh main door jack, separator,water,aircraft air condit, circuit card assy, chassis,electrical-electronic equip, circuit card assembly, circuit card assembly, valve,vacuum/pressure relief

Central Government/Public Sector

CTN :36177849 Due date: 23 May, 202423 May, 2024 23.72 Lacs
Tender For providing of custom bid for services - 200134226 maintenance contract of ci systems and equipments for fgd area at ntpcunchahar stage4 for one year- 10) maintenance contract of c&i systems and equipments for fgd area at ntpc-unchahar stage-4. 10.10 item service code no.: cipna00gn400 desc:- removal & remounting of pneumatic actuator(diaphragm type or power cylinder type) will consists of any combination of following activities: 1. removal of pneumatic connections and required instruments like solenoid valve, limit switch, afr, positioner, pft etc from actuator and decoupling from valve after ensuring proper isolation from process side. 2. removal of actuator from its position. 3. transportation of actuator from its location to a safe place. 4. remounting the actuator after clearance from mechanical maintenance. 5. re-fixing /replacing the related accessories removed earlier as per point no-1 above and restoring pneumatic connections including cable dressing, copper tubing, tagging etc. 6. final operation checking from local & control room (fgd ddcmis system) after calibration and feedback adjustment. defect liability period: 01 week 10.20 item service code: - cipna00gn106 des:- checking/pm of pneumatic control system pneumatic actuator (diaphragm type or power cylinder type) and its mounted accessories, will consists of any combination of following activities: a) checking/pm of solenoid valves mounted on pneu. act. i. check solenoid coil physical and electrical healthiness and tightness of terminals if required ii. clean its external parts. iii. check & adjust air supply pressure as per requirement iv. check tightness checking of all parts. v. energize with correct voltage and see solenoid valve operation if required as per instruction of area in charge. vi. if solenoid valve is not working or coil resistance is not adequate replace solenoid valve or coil and check operation. vii. tighten checking of wires at terminals & at junction boxes. b) checking/pm of positioner and position feedback transmitter mounted on pneu. act. i. check & adjust supply pressure as per requirement. ii. clean its external parts of positioner and check its operation, if necessary, as per instruction of area in charge. iii. if required, connect pneumatic test signal at i/p, 0.2 kg/cm2. adjust positioner zero adjustment spring, till actuator comes to zero position. adjust 4ma o/p of pft with zero pot. iv. raise pneumatic test signal to 1.0 kg/cm2 and adjust span of positioner, till actuator reaches 100% position. adjust 20ma o/p of pft with span pot. v. repeat steps ii to iv till the required repeatability is achieved. vi. tighten terminals at junction boxes. c) removal and restoration of c&i connections as per requirement during unit shutdown or as per requirement. i. removal of accessories like solenoid valves, positioner, i/p converter, air lock relay, air filter, air filter regulator, limit switch, position feedback transmitter, volume booster, pneumatic lines, etc. ii. keeping all accessories safely at suitable location. iii. restoration of all accessories removed and connection of air lines as per original scheme. iv. checking of functioning of actuator after restoration of connection. v. calibration / adjustment of complete system if required. d) checking/pm of i/p converter/smart positioners if any i. adjust supply pressure as per requirement. ii. check ma input to i/p converter/smart positioner. iii. check i/p converter/smart positioner o/p with portable gauge. it should correspond to its characteristic, if not, remove it and send to c&i lab for calibration/repair. iv. bring i/p converter/smart positioner from c&i lab and fit it in line. v. connect ma signal and normalize the system. vi. tighten terminals at junction box. e) checking/pm of regulating type actuator operation. i. check and adjust supply air pressure as per requirement of respective actuator. ii. set demand to 0% from control room after taking p
 Loading, Please wait...

Connect us via What's Up