Web Analytics Made Easy - StatCounter

Drawwork Spares Tenders

Get complete information related to latest Drawwork Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Drawwork Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Drawwork Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40893169 Due date: 02 Jul, 202502 Jul, 2025 NA
Tender For 1) operation & maintenance work contract for hydraulically operated pedestal mounted stone grapple machine on as and when required basis installed in c.h.p.-ii (1x500 mw), t.p.s., khaperkheda, 2) work of complete repairing, reconditioning and refurbishment along with all required spares & accessories for the travel system of shuttle conv. 1 to 4 installed at chp-i, tps khaperkheda, 3) work of providing, fixing and testing of coal flow establishment system for conveyor chutes of apron feeder no. 1 to conv. 2c, apron feeder no. 2 to conv. 2d and conv. 3a to conv. 4a installed at chp-i (4 x 210 mw), tps khaperkheda, 4) work of annual overhaul maintenance of air preheater for unit no. 4, 5) work of repairing flue gas duct from eco outlet to esp inlet during unit no.4 coh., 6) work contract for conveyor belt jointing by cold / hot vulcanizing process at c.h.p.-ii,t.p.s. khaperkheda, 7) servicing of various doors, manholes of boiler during unit no. 4 aoh, 8) biennial work contract for housekeeping/cleaning to be carried out in service building acw/ccw p/h, time office etc at unit-5, 500mw, khaperkheda tps., 9) supply & application of chemical bonded plastic refractory for boiler during unit no. 4 aoh., 10) procurement of 22" victaulic coupling and sampling plug assy for coal pipes for unit 3 & 4, 11) work of radiography and interpretation of hp weld joints in boiler unit 4 during coh, 12) work of repair of boiler first & second pass buck stay in unit no. 4 coh., 13) supply of pa fan shaft for ndv 18 tiefstack in unit no. 1 & 2., 14) procurement of dresser coupling & coupling collars for coal pipe in unit no. 1 aoh, 15) procurement of guillotine gates chain links for u#4 coh for ahp-i, 16) supply & application of chemical bonded and firecrete refractory in boiler second pass and flue gas duct during unit no. 4 coh., 17) procurement of glands packing & spiral gaskets for coh u#1&4., 18) supply & application of fire crete refractory and allied works of bah for unit no. 4 coh, 19) procurement of fabricated burner tilt pins, levers & spares for 210 mw unit aoh, 20) procurement of spares for bfp recirculation valves.(u # 4 coh)., 21) servicing of gates & dampers of air & flue gas path in unit no. 4 aoh., 22) procurement of rcw headers and scalloped bars for unit 1 aoh of bah., 23) replacement of damaged g.i. roof sheets above at wagon tippler, bobr hopper area and various conveyor belts galleries at chp-i, khaperkheda tps., 24) procurement of various low pressure and low temperature steel consumable for u#1 coh., 25) supply of liner assembly (in 2 halves) for upper housing of coal mill xrp-803 hp at unit no. 1 & 2., 26) work of fabrication and replacement of reheater coil stub bend assemblies during unit no. 4 coh, 27) overhauling/servicing of low pressure valve during unit no. 1 & 4 capital overhaul, 28) procurement of various gromet slings for capital overhauling of unit 1 and 4, 29) removal and shifting of ndct drift eliminator during coh at unit no. 05, 1x500 mw, tps, khaperkheda., 30) work of providing and fixing of conveyor spillage control equipment at chp-i, tps, khaperkheda.

State Government

CTN :40227801 Due date: 08 Jul, 202508 Jul, 2025 49.58 Lacs
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu
 Loading, Please wait...

Connect us via What's Up