Tender For corrigendum : supply of back pack water cum foam mist , life safety jacket , multipurpose nozzle for fire fighting system , high capacity portable fire pump , foam making branches fmb 5x , self oscilation monitor , piercing nozzle , portable chlorine gas leak detector , fire fighter helmet with flame resistance 3 watt led , cooling vest , 35 feet alloy aluminium extension ladder as per is 4571 1977 , dry chemical powder , fire hydrant valve washer or gasket , deluge valve 150nb , deluge valve 80nb , rubber washer for female coupling of hydrant valve hydrant landing valve oblique type , air release valve , nrv gun metal verticle type , gm nrv valve for water line valves and jetting nozzles 20nb , 20 mm or 3_4 angle valve in deluge valve for fire spray sprinkler system , angle valve part no 4304 106 600 mw , 50 mm or 2 angle valve moc brass in deluge valve for fire spray sprinkler system , y type strainer 600 mw , strainer y 1_2 bspt 300 psi ) /bid number: gem/2026/b/7300683 * /dated: 02-03-2026 & & / bid document1 / 31
Tender For bid to ras supply of halocarbon agent based fire fighting system c c - pipe line for gas nozzle fitment 35 mm including fitment , 34 ltrs automatic in direct low pressure valve with solenoid fire suppression cylinder , fire finder polymer tube for automatic fire detection and suppression system made by special modified , fet end of line adapter with pressuure gauge for automatic fire suppression tube used for fitting at end of tube for pressurising and re pressurising the tube , fet pressure switch to monitor presure drop in the tube , master control unit for connecting each system with electronic hooters and productivity input to scada , all necessary fittings cabling and clamp to complete the system , installation adn commissioning charges including complete setup of the system installation of cylinders on specially designed brackets
Tender For corrigendum : supply of furniture and kitchen equipment 03 nos emrs d d - dual desk class 6 8 , dual desk class 9 12 , principal table , vice principal table , office table , teachers table , meeting table , library table , computer work station , one side book shelf , steel glass door almirah , steel almirah , 5 seater sofa , 4 seater sofa , metal bed , metal table with integrated storage , 8 seater ss top fixed canteen table , 6 seater ss top fixed canteen table , lab stool , high back chair , medium back chair , visitor chair , chair without arm , personal locker unit , magnetic white board , melamine surface non magnetic chalk board , tea table , physics table , ss one burner stock pot range , ss 2 burner indian cooking range. , ss single sink unit. , ss tilting type bulk cooker , ss tilting type boiling pan. , ss spice trolly . , ss work table with 1 bottom shelf. , chapati hot plate . , semi automatic chapati making machine . , conveyor type toaster . , ss 4 door vertical chiller. , deep freezer. , dry masala grinder . , pulveriser . , dough kneader. , ss 6 vessel hot bain marie with 1per1 gastro norm pan with front tray rail. , platfrom trolly . , kitchen utility trolly . , ss pot rack 4 shelf . , ss storage rack 4 shelf . , hdpe pallet of capacity 2200 to 2500 kg. , potato piller . , ss hood with ss filter , gi ducting for hot air suction . , fan for hot air suction . , 10 cylinder 5 x 2 10 lpg gas. , 1per 2 inchi dia lpg pipe line
Tender For corrigendum : providing of goods transport services - per mt - transportation of rpo thru 23 to 32 mt capacity tank trucks with loading unloading gps tracking and in transit insurance by transporter; oil/gas tanker truck; 23 to 32 mt capacity tank truck in line with all the te..,goods transport service – per mt per km based service - transportation of rpo thru 23 to 32 mt capacity tank trucks with loading unloading gps tracking and in transit insurance by transporter; oil/gas tanker truck; 23 to 32 mt capacity tank truck in ..
Tender For fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , makin
Tender For corrigendum : tender for supply of generator steady bearing metal , ring gasket 3 mm compressed non asbestos gasket for blank plate connection stator cooling water line to funnel cl150 asme 16.5 rf dia 65 , full face gasket 3 mm compressed non asbestos gasket for bird wire mesh installation scw skid vent cl150 asme 16.5 rf dia 40 , full face gasket 3 mm compressed non asbestos gasket emergency seal oil pump discharge nozzle connection cl150 asme 16.5 rf dia 65 , full face gasket 3 mm compressed non-asbestos gasket seal oil pump discharge piping regulating valve 10mkw22aa003 connection cl150 asme 16.5 rf dia 65 , full face gasket 3 mm compressed non asbestos gasket seal oil pump discharge relief valve 10mkw10aa401 connection cl150 asme 16.5 rf dia 65 , full face gasket 3 mm compressed non asbestos gasket seal oil pump discharge relief valve 10mkw20aa001 connection cl150 asme 16.5 rf dia 65 , ring gasket 3 mm compressed non asbestos gasket for flow element connection seal oil pump suction piping cl150 asme 16.5 rf dia 65 , full face gasket 3 mm compressed non asbestos gasket for strainer connection seal oil pump suction piping cl150 asme 16.5 rf dia 80 , full face gasket 3 mm compressed non asbestos gasket pump discharge nozzle connection cl150 asme 16.5 rf dia 80 , full face gasket3 mm compressed non asbestos gasket for seal oil pump suction nozzle connection cl150 asme 16.5 rf dia 100 , full face gasket 3 mm compressed non asbestos gasket for manholes air detraining section cl150 asme 16.5 rf dia 450 , full face gasket 3 mm compressed non asbestos gasket for butterfly valve connection stator cooling water line to funnel cl150 asme 16.5 rf dia 65 , insulating gasket insulating type gasket kit along with fastners for duplex oil strainer outlet connection seal oil pump discharge piping cl150 asme 16.5 rf dia 65 , ring gasket 3 mm compressed non asbestos gasket for stator cooling water line to generator and from generator cl150 asme 16.5 rf dia 150 , ring gasket 3 mm compressed non asbestos gasket for h2 gas pressure regulator valve connection cl150 asme 16.5 rf dia 15 , ring gasket 3 mm compressed non asbestos gasket for stator cooling water line from generator cl150 asme 16.5 rf dia 200 , ring gasket 3 mm compressed non asbestos gaske for drain line air detraining section cl150 asme 16.5 rf dia 25 , ring gasket 3 mm compressed non asbestos gasket for vent line scw skid storage tank cl150 asme 16.5 rf dia 25 , ring gasket 3 mm compressed non asbestos gasket for blank plate connection stator cooling water line to funnel cl150 asme 16.5 rf dia 65 , ring gasket 3 mm compressed non asbestos gasket for break up flange connection seal oil pump suction piping upstream of strainer cl150 asme 16.5 rf dia 80 , ring gasket 3 mm compressed non asbestos gasket for break up flange connection seal oil pump discharge piping downstream of regulating valve cl150 asme 16.5 rf dia 80 , ring gasket 3 mm compressed non asbestos gasket for break up flange connection seal oil make up air detraining section cl150 asme 16.5 rf dia 80 , nitrile rubber o ring for duplex oil strainer basket covers refer note 2 special grooved flange dia 65 , rectangular o ring gasket nitrile rubber ring gasket square cross section for break up flange connection duplex oil strainer outlet to generator piping dia 65 , rectangular o ring gasket nitrile rubber ring gasket square crosssection for seal drain nozzle connection air detraining section dia 80 , rectangular o ring gasket nitrile rubber ring gasket square crosssection for break up flange connection from generator to h2 detraining section exciter side dia 125 , rectangular o ring gasket nitrile rubber ring gasket square crosssection for break up flange connection from generator to h2 detraining section turbine side dia 125 , rectangular o ring gasket nitrile rubber ring gasket square crosssection for h2 detraining section connection from generator to h2 detraining section exciter side dia 125 , rectangular o ring gasket
Tender For providing of custom bid for services - various repair jobs of emd - overhauling/dismantling of the existing w ater drainer by isolating the drainer by putting blank plate after isolation valve. purging/removal of trapped gas from the seal pot/pipe line by injecting st eam/nit rogen. revisioning of all parts & cleaning of pot. if required, the complete seal pot w ith pipe line has to be new ly fabricated & erected as per the instruction of o.a. or as per draw ing. after erection, testing of pot by injecting st eam/nit rogen and de-isolation/commissioning. the condensate pipe from w ater drainers has to be laid to the nearest storm w ater manhole or as directed by o.a.s representative. painting of w ater drainer and pipes to be done after the erection job , "technical cleaning of gas pipelinewater drainers. the w ork involves closing/blanking of valves, st eam purging of pipe/drain pot and opening of f langes of seal pot and removal of muck/deposit from pots, revisioning of gas inspection valve,w ater filling valves,condensate valves. fixing of new packing and tightening of f langes. filling of w ater in the seal pot and de-blanking of w ater drainer/opening of valves. checking for any leakages and rectification of the same " , the job involves cutting/dismantling of corroded structures like column, platforms, w alkw ays, staircases etc. at height. before cutting of any structure, the nearby pipe lines or any other equipment to be supported f irst. the dismantled structures should not be throw n from height. all the dismantled structure to be kept at one place as directed by o.a.s representative for disposal by bsp , the job involves fabrication of st eel structures like column, platforms, w alkw ays, staircases etc. by type 1 electrode, as per approved draw ing / specification or as directed by oa/oa¿s representative complete in all respect including painting. fabricated structures w ill have to be erected by the contractor at height as per the direction of operating authority , the job involves w elding of tack w elded pipes, gland compensators, disc compensators, flanges, st eel structures, gas pipeline equipment, plates, pipes, structures w ith type 1 w elding electrodes , dismantling of gas pipe line or any other pipe line by cutting, including handling and stacking, cutting into pieces and sections as directed by oa/oa¿s representative & stacking at designated location. before cutting the nearby pipe lines/platforms/equipment to be supported. all dismantled structural items to be kept at a particular place, as show n by o.a.s representative for disposal by bsp , job involves erection of fabricated/available pipes at locations show n by o.a./o. a' s representative, including dia. 100mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves,compensators, saddle supports etc. also to be erected, as directed by o.a , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 100mm and up to dia. 200mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. , fabricated/available pipes at locations show n by o.a./o.a. s representative, above dia. 200mm and up to dia. 500mm at heights. erection job involves, lifting of standard length of pipes supplied by bsp free of cost, w elding w ith the existing pipes/valve f langes and testing of pipe w ith st eam/nit rogen and defect rectification w ith type i electrode. any accessories like bleeder pipe, drainer pipe, purging nipples, valves, compensators, saddle supports etc.also to be erected, as directed