Tender For corrigendum : supply of bellows set consisting of 1 no. of supply air below, 2 nos of fresh bel lows and 2 nos of return air bellow ducts made of meta aramid / para aramid fabric with si licone rubber coating on both sides for lhb eog /hog type ac coaches as per rdso specifica tion no. rdso / pe / spec / ac / 0197 -2020. scope of the supply as per clause no. 2 of the above specification. [ warranty period: 30 months after the date of delivery ]
Tender For supply of bellows set consisting of 1 no. of supply air below, 2 nos of fresh bel lows and 2 nos of return air bellow ducts made of meta aramid / para aramid fabric with si licone rubber coating on both sides for lhb eog /hog type ac coaches as per rdso specifica tion no. rdso / pe / spec / ac / 0197 -2020. scope of the supply as per clause no. 2 of the above specification. [ warranty period: 30 months after the date of delivery ]
Tender For supply of roof mounted ac package unit ( rmpu) type-1 for lhb eog coaches in c oach set, consisting of rmpu with r407-c refrigerant-02 nos. to the rdso specification no:r dso/pe/ spec/ac/0061-2005 (rev-1) and microprocessor controller unit-01 no. as per rdso spe cification no:rdso/pe/ spec/ ac/0139-2009 (rev-1), type-i, complete with accessories as per sco pe of supply as envisagedin the rdso specification with supply of bellows set consisting of 01 no. supply air bellow, 02 nos. fresh air bellows & 02 nos. return air bellows ducts made of meta aramid/ para aramid fabric with silicon rubber coating on both sides for lhb eog/h og type a.c. coaches as per rdso specification no:rdso/pe/ spec/ ac/0197-2020 (rev-0.). scope o f supply as per clause no.2 of the above specification. material must be procured from rds o approved sources only. [ warranty period: 30 months after the date of delivery ]
Tender For supply of memu item:- spare for wbl 22.03 pantograph (i) filter element part no. 909010008700 (qty 01 nos.) (ii) bowl ring part no. 909010008800 (qty 01 nos.) (iii) sealing washer part no. 909010008900 (q ty 01 nos.) (iv) bellow (best nr. 1407 aw) part no. 909010009200 (qty 01 nos.) (v) cable tie ? 6.6 ? 7.5x1 80 part no. 909010004500 (qty 25 nos.) (vi) leaf spring part no. 909010016500 (qty 01 nos.) (vii) air pres sure hose part no. 909010012500 (qty 06 meter.) (viii) spare kit for model g35a041v-22383 part no. 9090 10017300 (qty 01 nos.) (ix) sm bumper part no. 909010008600 (qty 01 nos.) (x) shunt part no. 90901001 3700 (qty 10 nos.) (xi) shunt part no. 909010013600 (qty 02 nos.) (xii) shunt part no. 909010005600 (qt y 04 nos.) (all above is one set) [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of spare air bellow fault indication system consist of 06 items as per rdso? maint enance instruction no.cmi 9802 (rev.02) a) limit switch 10amp, 500v.qty 01no/set b) 3 sq. mm cables 75 0v single core copper elastomeric cable qty 05 mtr./set c) suitable mounting bracket for limit switch fixati on with bellow qty 01 no./set d) 3/4 inch non-metallic flexible conduit qty 2.5 mtr/set e) cheese head scre w m4x25mm qty 04 nos./set f) 3 sq mm insulated copper lug m4 qty 02 nos./set [ warranty period: 30 months after the date of delivery ]
Tender For supply of rubber bellow for tata , full cable assy for tata , assy cable complete for tata , accelator cable assy for tata , hose assy for tata , rep kit machanical for tata , fuel water separator , air filter , isolator switch
Tender For supply of spigot protection cover for air spring rubber bellow as per drawing no. wr cwm/pl sketch- 081 [ warranty period: 30 months after the date of delivery ]
Tender For bid to ras bid to ras corrigendum : supply of repair oblic work is required for flt 3 ton sl no 30153 at ge ep jodhpur , parts of vehicle to be replace , fuel pipe intake and return , accelerator cable , fuel filter set of two , hose pipe set , air filter , engine oil , transmission oil , hydraulic pressure pipe , fan belt , exhaust bellow spring , coolant , grease , oil filter , rubber pad for accelerator , hub packing kit , shaft seal , gasket , master cylinder , roof hood , hydraullic oil , brake fluid , high pressure line for fuel injection , maintenance and labour work required , brake setting and bleeding , levling the hydrualic oil , welding of exhaust spring , greasing of wheel and hub , repair to hydraulic pump , cleaning of lifter chain and forks slide , auto electrical wiring , complete servicing of vehicle , complete denting and painting , fixing of hood fixing arrangement , fuel pump repair , caliberation of injector nozzle