Tender For corrigendum : repair and maint of ht over head line ht cable god power transformer distribution transformer ht vcb ht ocb panel and other connected works at 11 brd af stn ojhar
Tender For supply, erection, electrification and commissioning of 25 hp/ suitable hp submersible pumpset for reuse of treated used water from stp to agriculture land at chinnadagudi hundi village, supply, installation and commissioning of 115kw/150 hp digital soft starter and repair of existing panel boards at existing wetwell near gudlu river and installation of 60.5 kw solar power to existing 8mld stp near goluru village, nanjangud cmc under jal hi amrit under amrut 2.0.
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pump repair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pump repair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; sl no 1 supply and installation of 37kw braking unit and dbr resistor suitable for 37kw vfd drive in the eot crane main hoist panel as per specifications ..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; sl no 2 installation of 37kw vfd drive for main hoist in eot crane and necessary interface power cabling and control cabling between vfd and braking unit ..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; sl no 3 supply of 5point5kw normal duty vfd for long travel operation of eot crane; as per tender document,repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; sl no 4 installation of 5point5kw normal duty vfd for long travel operation of eot crane; as per tender document,repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; sl no 5 se
Tender For supply of rrc for repairs routines of cranes onboard in ships and yard crafts at nsry karwar-- repair of existing main control panel , repair replacement and calibartion , repair calibration of main load cell , setting alignment , new vfd drive installation , software re configuration , trouble shooting and defect rectification , encoder module hardware defect , power supply module hardware , trouble shooting and defect rectification , software reprogramming