Web Analytics Made Easy - StatCounter

Electric Polisher Tenders

Get complete information related to latest Electric Polisher Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Electric Polisher Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Electric Polisher Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45057581 Due date: 16 May, 202616 May, 2026 9.50 Lacs
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of

corporations/Associations/Others

CTN :45033657 Due date: 20 May, 202620 May, 2026 35.17 Lacs
Tender For providing of m & r of 2x110 mw and 2x210 mw ash dykes at ptpp, parichha. - carriage of cmr/ash by mechanical transport including loading, unloading and stacking upto 5 km distance from power house area to ash ponds at ptpp parichha. payment to be made after deducting voids as per cpwd specfication or as decided by engineer in charge. , earth/ash work in excavation in earth over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m; disposed earth to be levelled and neatly dressed , placing of precast rcc planks in decantation well including its carrige and putting it into slott including all labour t&p etc. required for proper completion of work. , providing and laying empty cement plastic bags filling the same with ash having capacity of 50kg and stiching the same with sutali, laying with ash pond area as per instruction of engineer incharge. , engaging jcb/hydra machine on hire bases including hire fuel driver helper etc. complete. , dry stone pitching 22.5/30 cm thick including supply of stones and preparing surface filling from fly ash with watering & compection complete including carriage from coal handling area.(boulder free of cost from chd area in plant) , spreading of cmr/ash/earth by opening of stack including dressing watering compaction/ramming etc. complete for proper completion of work as per direction of engineer in charge of the work. payment to be made on compacted quantity. , clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared , brick work with fly ash bricks f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:6 (1 cement : 6 coarse sand) , cement plaster (in fine sand) 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) , providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) , formation of dyke/ roads using approved materials including the preparation of borrow area,stripping, watering of borrow area, excavation of approved quality of material from borrow area,using poclains or any other mechanical means,loading, unloading, transporting by dumpers,trucks etc., surface watering / dewatering,lowering of water level to at least 0.5 m belowthe bottom of the working level, includingconstruction of cofferdams wherever required,depositing the fill material on the dyke,spreading by dozers or grader in layers notexceeding 30 cm in compacted thickness forforming the embankment with all leads, lifts,breaking clods, watering, compaction with min. 10tone capacity vibratory rollers or pneumatictyred rollers to achieve a dry density not lessthan 95% of maximum dry density (standardproctor) forming extra width on edges, trimmingof slopes and slope compaction with dozers orslope compactors to obtain the section as perconstruction drawings, with all incidental charges, cost of labour, equipment, materialsetc. complete as per specifications, drawings and as directed by the engineer. with ash available from inside ash dyke area , structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. , same as above item but steel shall be issued by department free of cost ( steel issued by department) , steel reinforcement for r.c.c. work including straightening, cutting, bendin g, placing in position and binding all complete for thermo-mechanically treated bars

Central Government/Public Sector

CTN :45049484 Due date: 18 May, 202618 May, 2026 NA
Tender For supply, installation and commissioning of plate straightening machine for various type of metal ms & ss plate sheet having thickness of 01mm to 08mm and sheet width 2100 mm as per attached technical specification. [ warranty period: 30 months after the date of delivery ]

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f
 Loading, Please wait...

Connect us via What's Up