Tender For bid to ras corrigendum : providing of electric cabling service - electrical cabling, network cabling, optical fiber cable cabling, termination, distribution and installation services; copper; 250 sq. mm to 500 sq. mm, 0.5 sq. mm to 10 sq. mm, 10 sq. mm to 100 sq. mm, 100 sq. mm to 250 sq. mm
Tender For upgradation of entire electricaldistributionnetwork including replacement of old damaged type wirings at bed rooms, bathrooms, passage including re-arrangement of security lights at purneswari girls hostel within nbu main campus
Tender For corrigendum : providing power supply infrastructure distributionnetwork of 11/0.4kv substations, allied equipment and allied electrical works at sector 1 to 45 kharghar node, navi mumbai (phase-vi).
Tender For providing, supplying, lowering, laying, repairing and jointing of hdpe/d.i./pvc pipeline for rising main and distributionnetwork, designing and construction of rcc esr, renovation of existing 4.5 mld wtp and other civil structure, designing and construction of compound wall at different head work, supply, installation, testing and commissioning of pumping machinery with all allied electrical and mechanical work at charanka hw and soneth hw, under augmentation of charanka solar park (gpcl) water supply system with trial run of one month and 5 years of comprehensive o & m of entire scope of work including existing 4.5 mld wtp and existing & proposed components for supplying water to all beneficiary developers of charanka solar park. ta. - santalpur, dist. - patan
Tender For survey, investigation, design, supply, erection, testing and commissioning of kiravatti tank filling scheme for filling up of 50 mi/zp tanks in kiravatti and madanuru gram panchayats in yallapura taluka and tanks located on left bank of bedti river in gunjavati and mainalli gram panchayats in mundgod taluka by lifting water from bedti river on turn-key basis - consisting of following components- installation of vertical turbine pumps coupled to ht motors electrical panel, soft starter, capacitor, rising main, pressure distributionnetwork through ms/hdpe pipes with installation of surge protection system, supply of spares and tools including operation and maintenance for five years after successful commissioning of the entire system on turnkey basis for kiravatti tank filling scheme phase-2