Tender For corrigendum : purchase of sports exercise physiology lab equipments - cardiopulmonary exercise testing system (including treadmill & cycle ergometer) (2 years warranty)(pac), portable telemetric metabolic analyzer for field and laboratory use.metabolic analyzer portable telemetric system for metabolic analysis should have the following specifications:designlatest generation, single body - weather and dust proof to suit our requirement of tough testing conditions. it should operate in standalone, holter and direct connection to pc modes.weight on subjectless than 1 kg including battery and ergonomically designed multi-size adjustable harnesstesting capabilitypulmonary gas exchange (vo2, vco2), vo2 max, sub-max vo2, thresholds (at, rcp), heartrate with hr belt, resting energy expenditure (ree, rmr), indirect calorimetry w/ face mask, substrates analysis (rq, %fat, %pro, %cho)analysis method breath by breathmotion sensorsinbuilt gps, altimeter, accelerometer (3d + 8g range), gyroscope (3d + 2000 o/s range) andmagnetometer/compass (3d + 1000 t range)wireless connectivitywireless data transmission: bluetooth 2.1 + edr class ii (range >900 meters line-of-sight)connectivityusb, audio, heart rate (aux), wireless device interface (bluetooth for integration with compatible optional peripherals like spo2, ecg etc.)data storagestorage: 512 mb flash > 2,000,000 breathsadditional: sd-hc card 32gb/fat32 - internal slot user accessibledisplay lcd: 3.5 lcd transflective colour - high visibility with led-backlit tfttouch-screen: resistive technology, that allows gloves and wet fingersanalysersoxygen: gfc 0-25% range, lifespan approximately 12 months (very easily user replaceable) response time 120 mscarbon-dioxide: digital ndir 0-10% range, response time 100 msbarometer: range -600 to +5500mflowmeter: bi-directional digital turbine ventilation range 0 to 300 l/min powerbattery: rechargeable li-ion smart battery w/ lcd charge status indicator. 2 packs backup battery: embedded to allow main battery replacement during testing without loss of datamain: 100-240v ac/dc adapter, for direct/main power supply and battery charging. essential accessories / consumablesthe system should be supplied with a compatible treadmill and ergo cycle as per specs below. list of standard items supplied and details of consumables including o2 sensor with their life span should be provided. a compatible laptop pc, colour deskjet printer, 3 litre calibration syringe & calibration gas mixture cylinder with regulator should be supplied with the systemquality assurancemust have european ce, us fda and iso certifications. treadmill running machine with user terminal (display & keyboard) stand- alone and remote control with cpet via rs232 running surface: l:170 cm (minimum), w: 65 cm (minimum) maximum possible load: 300 kg (660 lbs) speed range: 0-25 km/h elevation: 0 to 28% reverse belt rotation motor system 3.3 kw, single phase ac motor, maintenance free and brushless power transmission: frequency inverter, poly v - belt, very quiet operation safety arch should be provided with harness of 5(five) different sizes (small to large) safety system: emergency-off safety stop switch (safety lanyard with actuator, pull cord and clip); potential equalization bolt; transformer for potential-isolation from the mains ambient condition: temperature: +10 to +40 degrees c, humidity 30 to 70% display: touch screen display heartrate monitoring: wireless transmitter; the treadmill should be able to interface with well-known compatible metabolic gas analyzer as per standard and custom exercise protocols different programs para control software for pc must have ce certificationergo cycle functional design and excellent stability, load up to 160kg. easy to use saddle, handle bar and pedals speed independent and dependent power control handle bars are easy to change to suit different tests, rotatable by 360 degrees. mechanical/motor-assisted seat adjustment easy to control and calibr
Tender For supply of maintenance of turbine and its auxiliaries of btps obra d d - 51 to 100 , attend flange or bonnet lkg of hp valve or hp pipe101 to 150 , attend flange or bonnet lkg of hp valve or hp pipe151 to 200 , oh of by pass valve of temp control line or patch welding work in the condenser or hot tightening of ejector , clean of filter of tur oil or h2 cooler str , oh of main steam line valve i. e. v2 6 , oh of feed line valve with by pass valve , oh of nrv of extraction line, es-1 or es-2 or ipt transfer pipe line drain valve , oh of nrv of extraction line,es-8 or es-11 or oh of nrv of hp drip or cep disch line , oh of valve cont. to cond dw-4 or 38- 41 or ca-5 or as-47 or as-48 valve , oh of stm throw valve to cond or iso lph-2 , oh of steam by pass valve v2-27 or 15 or v2-7 , oh of extrac valve i. e. es-3 or 4 or 5 or 6 or 7 or oh of drip line gate valve hd-21or 29 or 30 or 31 , oh of fcnrv or isolating valveof lph-3 or 4. , oh of condensate throw off valve to cond , rep of es-9 by h. p welding tech, , rep of v227 or 15 by h. p welding tech, , rep of v2-38 or 81-84 by h. p welding tech, , oh of actuators of msv-l or r , oh of actuators of dw-4 or 38- 41 or ca-5 or cst makeup valve or es-3 to7 or hd-21 or hd-29 to 31 or as 47 or 48 , oh of actrs of v2-38 or 81-84 or 27 or 15 or v2-7 or steam iso valve lph-3 or 4 , oh of actrs of butterfly valve , oh and revisioning of lph-2 to lph-4 or gc-i or gc-ii or lph-1a or lph-1b , oh of gauge glass of lph or gc or ejc or dea o rcon , tight. of flange of crh or gc-i or ii or lph , overhauling of dss of aux. , prds-ii , overhauling of main flash tank , overhauling of aux flash tank , repair or replacement of broken hanger. , tightening of loose hangers. , attend the flange leakage of crh line. , serv of hydr. brake of chit or gar crane , chk and grs. of brg,cplg,chang bush of bolt or serv of greep brake of chit or garlic crane or sevicing servicing of all the wheel of garlic or chitram crane and plate , oh of small hook of chit or garlic crane or oh main hook , serv. of all gear boxes of chit or gar crane , check and clean of wire rope drum or bearing , oh of dss of aux. prds , cut and weld and repl of lp valve up to 50 mm , cut and weld and rep of l. p. valve51 to 100mm , cut and weld and rep of l. p. valve101 to 150mm , oh of isolating or bypass valve of pcv 5 or 14 or 17 , oh of valve contd to dea at 13 mtr v2-21 or cst makup valve , oh of suc valve of bfp or disch valve of cep , oh of suction valve of cep or mc-18-25 or 33 or 37 or oh of u bend valve , fab of reducer for hp drip 218-80 or 168-80 , rep of reducer of h. p drip line , lph drain line valve hd-8 or 9 or 14-19 or 20 , check and rect of internal fault of dea , blanking of crh line for reheater ht , rem chocking oil drain of brg1 or 2 of tur. , rem chocking of drain of cntg. machine. , repl of damaged nrv of pcv-14 or 17 size200 , repl of damaged nrvof feed line size-250 , oh of butterfly valve of condenser , hot tightening of cross over pipe , oh of hp heater and attend of flange lkg. , attending the shell joint of hph , attend the spot lkg of hph shell joint. , oh of safety valve of flange or stud heatng or lp heater or hp heater or cbd tank , oh of safety valve of warm up line , oh of safety valve of aux prds or deaerator or oh of nrv of aux rpds heat line to fst , oh of nrv v2-52 or v2-53 or v280 , oh of nrv of re-circulation line of bfp or spindle leak off line , oh of h. p. valve and nrv. , oh of h. p. steam drain line valve. , rep of nrv of hph drip to deaerator , welding of crack in hph or crh pipe line , fab of bend for recirculation line or oh of group protection valve i. e. fw-1 , fab of bend for hph drip line con to dea , fab of bend of lph drip to drip pump or condenser , rep of bend of hph drip line con to dea , rep of bend of rc line con to dea or oh of //bid details2 / 106feed pump energy absorber. , rep of bend of lph drip to drip pump or condenser , cutting and welding of h. p. valve 15 to 50mm , cutting an