Tender For work of providing and laying of 300 rcc and 230mm dia gsw inplace of 150/200 mm dia slited up at omkar nagar, brundhavana layout, arakere mico layout and surrounding areas coming under aml service station of aee(s)-1-1 sub division (category -ii(a))
Tender For shifting and erection 3ph 3w 33kv, 11kv, 3ph 4w lt line and substation due to widening and strengthening of samal bamra border road from 0km to 4.700km for the year 2025-26
Tender For shifting and erection 3ph 3w 11kv, 3ph 4w lt line and substation due to widening and strengthening of boinda to ichhapur via padmapur from 0.0km to 5.700km for the year 2025-26
Tender For manning operations and maintenance of 11kv/415 v electricalsubstation along with pumping stations with allied equipments to provide uninterrupted pumping at osman nagar, bollaram and mallampet for a period of 2 years under operation and maintenance dvn xxii (orr phase-ii)
Tender For 1)augmentation of up and down loop line at kiratgarh station (csr 750 meters) on itarsi-narkher sections under aden betul sub-division.2)augmentation of yard lines at barbatpur station on itarsi-narkher sections under aden betul sub-division.3)proposed extension of up loop line and down loop line at teegaon station yard under aden amla sub-division.
Tender For (1) augmentation of down loop line at butibori station (csr 750 meters) station on nagpur-wardha section under aden(s)ngp sub-division.(2) proposed construction of additional loop line (csr 750 meters) at pusla station under aden katol sub-division.
Tender For 1) augmentation of up loop line (csr 750 meters) at chhotipadoli station on wardha-ballarshah section under aden ballarshah sub-division.2) augmentation of up & down loop line at bhugaon station (csr 750 meters) on wardha-ballarshah section under aden warora sub-division.
Tender For bengaluru - salem section : sw i : construction of type - ii quarters (4 units) at hosur (hsra) station, including electrical portion. sw ii : construction of type-iii quarters (4 units) at hosur (hsra) station under aden/dharmapuri sub-division, including electrical portion. maintenance period is 12 months