Web Analytics Made Easy - StatCounter

Electrostatic Dust Mark Lifting Kit Tenders

Get complete information related to latest Electrostatic Dust Mark Lifting Kit Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Electrostatic Dust Mark Lifting Kit Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Electrostatic Dust Mark Lifting Kit Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :40905620 Due date: 02 Sep, 202502 Sep, 2025 NA
Tender For earthwork, blanketing, bridge works, p.way works & other ancillary civil engineering works (from chainage 1088 to 10196 from centre line of bcj station) ; supply, installation, testing & commissioning of 2x25 trd system; electrical (general) work including removal/modification of various electrical infringements 11 kv/33 kv h.t. & l.t. overhead lines (from chainage 1088 to 10196 from centre line of bcj station) and s&t works involving alteration in existing ei at cpbh & associated utility shifting works for s&t falling in ir portion of proposed alignment in connection with construction of sone nagar bye pass line from chiraila pauthu (ch. 10196 from centre line of bcj station) on gc line to new sone nagar (ch. 1088 from centre line of bcj station) on bd line under ddu division of east central railway on engineering, procurement & construction (epc) mode.

CTN :40875294 Due date: 18 Aug, 202518 Aug, 2025 NA
Tender For design ,development, manufacturing, testing, supply, preservation, installation, alignment, setting to work, commissioning, acceptance and trials of restraining gear and associated system and accessories for aircraft carriers, as per sotrs

State Government

CTN :40878058 Due date: 08 Jul, 202508 Jul, 2025 5.00 Lacs
Tender For procurement of various scientific equipments at gondwana university gadchiroli (third time) - astronomical telescope fl: the celestron nexstar 8se is a popular schmidt-cassegrain telescope known for its blend of advanced features and user-friendly design. here are the key specifications:optical tube assembly aperture: 203.2 mm (8 inches), focal length: 2032 mm (80 inches) focal ratio: f/10, optical coatings: starbright xlt light gathering power: 843x (compared to the human eye) mount type: single fork arm altazimuth, goto system: nexstar+ hand control with a database of over 40,000 celestial objects, tracking rates: sidereal, solar, and lunar alignment procedures: skyalign, auto 2-star align, 1-star align, 2-star align, solar system alignsoftware and database, computerized hand control: included, with over 40,000 objects in the database software: theskyx first light edition astronomy software, finderscope type: starpointer red dot finderscope tripod material: steel, accessory tray: included eyepiece included eyepiece: 25 mm (provides 81x magnification) eyepiece barrel diameter: 1.25 inchesother features, dovetail rail: compatible with vixen-style dovetail, power supply: 8 aa batteries (not included) or an external 12v dc power source weight:, optical tube: 12.5 lbs (5.67 kg), mount and tripod: 24 lbs (10.89 kg)o total weight: 33 lbs (14.96 kg), optical specifications, aperture: 203.2 mm (8 inches) focal length: 2032 mm, focal ratio: f/10, optical design: schmidt-cassegrain magnification: depends on the eyepiece used; the standard 25mm eyepiece provides 81x magnification.mount and electronics, mount type: computerized altazimuth goto technology: nexstar+ hand control with a database of over 40,000 celestial objects tracking rates: sidereal, solar, and lunar alignment procedures: skyalign, auto 2-star align, 1-star align, 2-star align, solar system align power requirements: 8 aa batteries (not included) or optional ac adapter physical specifications weight (optical tube): approximately 12.5 lbs (5.67 kg), weight (tripod): approximately 9 lbs (4.08 kg) total weight: approximately 24 lbs (10.89 kg), tube length: 17 inches (432 mm) accessories eyepiece: 25mm plossl (1.25"), star diagonal: 1.25" erect image diagonal, finder: starpointer red dot finderscopeadditional features, computerized hand control: features a two-line, 16-character lcd display with backlit buttons for easy operation in the dark., built-in database: can locate and automatically track objects in the sky, including stars, planets, galaxies, and more.

CTN :40842828 Due date: 21 Jul, 202521 Jul, 2025 NA
Tender For supply of invitation of bids for 05 equipment for augmentation of gearing and shafting facility c c - monitor type image borescope , ultrasonic flaw detector and thickness gauge , led source , laser shaft and bore alignment system , mtu computer accessories for dialog software

State Government

CTN :40227801 Due date: 08 Jul, 202508 Jul, 2025 49.58 Lacs
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu

CTN :40441338 Due date: 24 Jun, 202524 Jun, 2025 NA
Tender For corrigendum : tender for supply of wheel flange lubrication system - wheel flange lubrication equipment , design and submission of design documents of all items listed , fai reports and type test and report of items listed , adjusting the nozzle alignment , spares as per annexure a for wfl system , tools for wfl system , training on o and m to the cmrl beml on wfl system , training manual system technical manuals

corporations/Associations/Others

CTN :40816117 Due date: 25 Jul, 202525 Jul, 2025 22.04 Lacs
Tender For development of the approach connectivity towards the filter media stack yard and the drainage system along the bisa-lakshmitala area at southern alignment within igwtp

State Government

CTN :40790114 Due date: 20 Jul, 202520 Jul, 2025 3.40 Crore
Tender For providing and laying 1016mm dia ms raw water rising main pipeline of mandya water supply system in new alignment near m shettihally from ch.121.862 to ch.121.615 of nh-275 under dc works of nhai, ramanagara (including 1 year dlp) (lumpsum-no variation)

State Government

CTN :40799743 Due date: 28 Jun, 202528 Jun, 2025 55.19 Lacs
Tender For name of the work major overhauling of 02 nos kt1150 engines and 01 novt28 l engine cummin s make of san locomotives assisting for dismantling of kt1150 and vt28 l engines from the locomotives joint inspection of testing of overhauled engines shall be conducted between kpcl representative and firms representative joint inspection report of testing jirt after completion of re assembly shall be furnished to this office joint inspection of testing may be waived off at the discretion of the undersigned but the test report shall be furnished.removal and re installation of engine. this includes the complete procedure of safely removing the engine from the locomotive and, after completion of the necessary repair or overhaul work, re-mounting the engine back into the locomotive. all required tools, fixtures, lifting mechanisms, and safety measures shall be managed by the vendor.engine alignment process the alignment process involves precise positioning and securing of the engine to ensure correct interfacing with the locomotives drivetrain coupling systems, and support structures this includes, but is not limited to mounting of the engine onto the engine bed frame using proper alignment tools and calibrated instruments ensuring parallelism and angular alignment of the engine relative to the transmission or traction system verifying coupling concentricity and ensuring there is no misalignment that may lead to premature wear vibration or operational issues tightening of mounting bolts to specified torque values and rechecking alignment post tightening conducting necessary trial runs and adjustments if any to confirm proper functionality before final handover all the released items shall be returned in separate packing along with overhauled engines to kpcl

CTN :40770282 Due date: 10 Jul, 202510 Jul, 2025 NA
Tender For supply of dismantling repairing , replacement of fuel system and servicing , repair to water body system dismantling overhauling servicing and reassembling the same after repair and replacement of the old unservicable parts , dismantling of old worn out cross of central axle shaft and replacement of central axle shaft cross including defferencial oil topup, seal and rubber ring with bearing for veh. , repair replacement of suspension work , alignment and balancing , replacement of hub of brake disc , replacement of assy lower joint , replacement of tapper roller bearing inner make nbc abc , replacement of tapper roller bearing outer make nbc abc , replacement of oil seal make universal , replacement of brake disc ventilated , replacement of thrust washer , replacement of gasket , replacement of master cylinder kit make tvs , replacement of wheel cylinder kit make tvs , replacement of clutch kit small make luk , replacement of clutch kit big make luk , replacement of release bearing make nbc abc , replacement of fuel filter make mico purolator , replacement of oil filter make mico purolator , replacement of air filter make purolator bosch , replacement of engine oil 20w 50 make gtx castrol max , replacement of accelerator wire complete set , replacement of door lock of right and left side window make oae 02 nos , replacement of wiper blade complete set , replacement of footmat as per sample 01 set , raditor pipe with thermostate body
 Loading, Please wait...

Connect us via What's Up