Tender For finalization of rate contract of dental equipment and dental material - dental material, hybrid light-cure kit pack of 5x4 g syringe with 7th gen. bond kit, paper point 15-40 pack of 200 pieces, gutta-percha points gp point 15-40 pack of 120 pieces, suction tips pack of 100 pieces, temporary filling material pack of 40 g, root canal sealer tube of 13 g, edta paste 3g syringe pack, etching gel tube 3ml syringe pack, endo rotory file 21mm pack of 6 file, endo rotory file 25mm pack of 6 file, gp point 4% all size pack of 120 points, gp point 6% all size pack of 120 points, paper point 4% all sizes pack of 120 points, paper point6% all sizes pack of 120 points, formocresol bottle 15 ml, gutta-percha (gp) solvent bottle 15ml, articulating paper packet of 24 slips, polishing paste pack of 45g, polishing cups 1 piece, mta biocermic sealer pack of 2 gm syringe, sodium hypo 3% bottle of 500ml, hand protaper file set of 6 21 mm s1, hand protaper file set of 6 21 mm s2, hand protaper file set of 6 21 mm sx, hand protaper file set of 6 21 mm f1, hand protaper file set of 6 21 mm f2, hand protaper file set of 6 21 mm f3, flow able composite 2gm syringe, glass ionomer cement type ii p-15g, l-8 ml with mixing pad spatula, zirconomer reinforced gic p-12g, l-5 ml with mixing pad spatula, light cure syrings all shade rate of one syringe 1x4 gm composite syringes, light cure bond 7 gen 1x5 ml bond with applicator tips, high level instrument disinfection (liquid) pack of 5 ltr, antiseptic solution pack size 100 ml, sterilizing & disinfection solution pack of 5 ltr, handpiece oil bottle of 550 ml oil spray, clinical instrument trolly 6 drawers and 4 inserts with stainless steel (ss) top, cotton roll pack of 500gm, examination gloves box of 100 pieces, rvg sleeves pack of 500 pieces, face mask 3 ply/3-layer pack pack of 50 pieces, betadine 5 % bottle of 500ml, bioceramic root canal sealer pack of 3 g syringe, rubber base material putty with light body putty base 900 ml with light body 140ml, denture relining material for denture repair soft liner 50g powder +25ml x 2 liquid + dropper +measuring cup one pack, cotton buff for denture polishing size 4 inches, lathe wheel for denture trimming 3 inch wheel, sand paper mandrel for denture trimming, acrylic stone for denture trimming & finishing acrylic white/ black/ green, carbide trimmer for denture trimming carbide carbide trimmer size conical / round / small /medium size, polishing cake for denture polishing for denture polishing polishing cake pack of 100 g cake, denture cleaning kit for denture cleaning denture cleaning paste pack of 80g instant denture cleaning paste, calcium hydroxide paste usfda/ european ce approved catalyst 11 gm base 13 gm, glass ionomer luting cement usfda/ european ce approved powder 35 gm liquid 25 ml type 1, zinc phosphate cement pack powder 35 gm powder zno, mno, powder, liquid 15 ml phosphoric acid, silver reinforced glass ionomer cement usfda/ europan ce approved p 35 gm, l- 10 ml, head cap dispo pack of 100 pieces, dental equipment, led light cure unit led light cure unit cordless one unit, endomotor led cordless endomotor with led one unit, apexlocater 5th gen 5th gen apex locater one unit, root elevator rust free stainless steel (ss) kit set of 10 pieces (root elevator hockey stick (right & lift) 02 straight elevator 2mm 01, 3mm 01, 4.5mm 01 warwick james elevator straight 01 apexo elevator (right & lift) 02 cryer elevator (right & lift) 02, filling instrument teflon coated rust free stainless steel (ss) kit set of 6 pieces, model trimmer 10 inches diameter, indian diamond wheel, heavybaseinletoutflow water system heavy duty equipped with 2 wall bearings motor., hydraulic bench press hydraulic press for flask one unit, dental x- ray portable for rvg portable precision imaging for modern professionals x-rayrvg aerb approved, rvg ergonomically optimized cut corners, bringing high patient occlusal comfort pixel matrix 1200*1650 active area 24*33 size
Tender For corrigendum : providing hydraulic elevator from 5th floor to the 6th floor near staircase at tgpsc (prathibha bhavan) building nampally hyderabad
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For corrigendum : supply of internal and external cleaning work of both boilers , internal cleaning work of both air heaters , both boilers roof to bagasse elevator and boiler no 2 side wall and complete boiler house cleaning work , internal cleaning work of wet scrubber and chimney of both boilers , dismentling of both economizer taking its below on ground and cleaning with hydraulic testing and fitted at site
Tender For corrigendum : supply of internal and external cleaning work of both boilers , internal cleaning work of both air heaters , both boilers roof to bagasse elevator and boiler no 2 side wall and complete boiler house cleaning work , internal cleaning work of wet scrubber and chimney of both boilers , dismentling of both economizer taking its below on ground and cleaning with hydraulic testing and fitted at site
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f