Tender For repairing of gear box on mercury verado 275 hp engines fitted on mumbai police boats suppliers of mumbai city and suburban area. i.e. within the municipal limit of greater mumbai.
Tender For providing of repair and overhauling service - w5 7500 hrly routines on 03 main engines of icgs amrit kaur; w5 7500 hrly routines on 03 main engines of icgs amrit kaur; yes; buyer premises
Tender For annual maintenance contract for maintenance of deutz & sun make diesel engines powered to track machines for two years 2025-26 & 2026-27 at a total cost of rs. 6,55,48,937.00 in which rs. 3,00,02,928.00 for the year 2025 -26 and rs. 3,55,46,009.00 for the year 2026-27 working over south central railway for dy.ce/tm/lines/bza only.
Tender For corrigendum : supply of selection of lso vendor for construction of 60t bp tug at hindustan shipyard limited - main engines and its auxillaries , srp shafting and its auxillaries , clutch and its auxillaries , external fire fighting system and its auxillaries , hull outfit group , accommodation , engineering , piping , onboard spares , installation and commissioning spares if an , standard special tools and test equipment instruments if any for maintenance and defect rectification of equipment , project management cost , production fabrication installation fitment connectorization services , electrical , conduct of equipment sys commissioning and trials hats , services at sats , training , documentation including delivery docs 4 sets each
Tender For supply of both side engines swivel brackets need to be checked if require the same to be repaired or replaced , both gear boxes overhauling to be carried out , engine gasket kit need to replaced and water line need to cleaned , fly wheel damaged need to be repaired or replaced , starter motor servicing nee to carried out
Tender For supply of controle cables need to be replaced , batteries are not holding charge and same need to be replaced , battery are not holding charge due to the battery cables need to be check if require the same to be rectified or replaced , battery switch is not working to be repaired or replaced , fuel hoses from main tanks to ru tank need to be check if require the same to be rectified or replaced , water separator are not working to be repaired or replaced , prime bulb is not working to be replaced , navigation lights need to be checked , if require the same to be repaired or replaced , cabin light need to be checked , if require the same to be repaired or replaced , bilge pump is not working to be repaired or replaced , toggle switch is not working to be rectified or replaced , electric wires are damaged and need to be replaced , battery leg and terminals are damaged and need to be replaced , controle box set is not working to be repaired or replaced , antifouling paint work need be carried out to enhance a vessels performance and durability , both engines overhauling to be carried out , both gear boxes overhauling to be carried out , both side engines swivel brackets need to be checked , if require the same to be repaired or replaced , fuel tanks need to be cleaned
Tender For supply of star board engine overhauling to be carried out , star board trim overhauling to be carried out , 300 hourly service of port engine to be carried out , oil pump service for the both side engine to be carried out , both side engines swivel brackets need to be checked , if require the same to be repaired or replaced , fuel tank or reserve tank need to be cleaned
Tender For deequipping and destoring ofinfac t82 - 1 removal of fwd gun mount, qty-01. 1 no 2 removal of aft gun mount, qty-01. 1 no 3 blanking of fwd gun mount post, qty-01. 1 no 4 blanking of aft gun mount post, qty-01. 1 no 5 removal of small arms post- qty-02. 2 no 6 ra for removal of capstan. 1 no 7 blanking for weather proofing post removal of capstan. 1 no 8 removal of soft patches for both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 9 fitment of soft patches post removal of both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 10 removal/ degutting of both main engine and asd pump. 2 no 11 manufacturing of cradle (mat iron) and box (matwooden) for transportation of main engine.qty - 02. 2 no 12 manufacturing and fitment of dead weight and bilge plates. 1 no 13 removal of both main engine compensator bellow, qty 04. 4 no 14 removal of both main engine fuel water separator, qty 02. 2 no 15 removal/ degutting of both gearbox. 2 no 16 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of both gearbox. qty - 02. 2 no 17 manufacturing and fitment of dead weight and bilge plates for both gear box. 18 manufacturing and fitment of dead weight for both asd - 14 2 no 19 manufacturing and fitment of dead weight for both propellers. 2 no 20 removal/ degutting of ac plant and its auxiliary. list of auxiliaries:- (a) tev (thermostat expansion valve. (b) heat exchanger (condenser). (c) heat exchanger (chiller). 1 job 21 manufacturing and fitment of dead weight for ac plant. 1 no 22 decouple and removal/ degutting of fwd da 1 no 23 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of fwd da. 1 no 24 manufacturing and fitment of dead weight and bilge plates for fwd da. 1 no 25 decouple and removal/ degutting of aft da. 1 no 26 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of aft da. 1 no 27 manufacturing and fitment of dead weight and bilge plates of aft da 1 no 28 removal of hp pump of ro plant. 1 no 29 removal/ de-gutting of ro plant. 1 no 30 manufacturing and fitment of dead weight and bilge plates for ro plant 1 no 31 removal of soft patches for aft da and ro plant. 1 job 32 fitment of soft patches for aft da and ro plant. 1 job 33 removal/ de-gutting of mcs 5 control system with it s auxiliary. list of auxiliaries:- (a) lop 02 (b) junction box 02 (c) rcs 04 (d) ecs -02 (e) throttle lever 04 1 job 34 blanking of patches post removal of mcs 5 control system to maintain weather proofing. 1 no 35 removal/ de-gutting of asd steering control box with accessories and it s auxiliary. list of auxiliaries are as follows:- (a) steering trim indicator 02 (b) main control 1 job page 3 / 13 panel 01 (c) asd controller 01 (d) trim controller lever 02 36 blanking of patches to maintain weather proofing for asd control box system. 1 no 37 removal of halon bottle 2 no 38 removal/ de-gutting of both shaft & support bearing 2 no 39 manufacturing of cradle (mat iron) and box (wooden) for transportation shaft & support bearing. qty 02. 2 no 40 requirement of tractor & trailer for shifting of items from ship to center for 20 days. 20 days 41 transport requirement (01 tonner) for shifting of items from ship to center for serviceability checks, 40 days. 40 days 42 requirement crane with sling (15,10,05,02 and 01 ton) for 40 days 40 days 43 removal of radar vm display, atu and antenna. 3 no 44 removal of existing cables of radar vm. 3 no 45 blanking and fitment of patches to maintain weather proofing 1 no 46 ra for degutting and de-equipping of ecdis display, ups, processor unit and interface unit with removal of cables. 4 no 47 removal of wind speed sensor and its dispaly unit and cables 1 no 48 blanking and fitment of patches to maintain weather proofing 1 no 49 removal of mss mk ii system, antenna and cables. 2 no 50 mk ii blanking of patches to maintain weather proofing. 1 no 51 removal of 07 in number navigation and emergency light. 7 no 52 manufactu