Web Analytics Made Easy - StatCounter

Equalizing Gear Tenders

Get complete information related to latest Equalizing Gear Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Equalizing Gear Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Equalizing Gear Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :41491757 Due date: 02 Sep, 202502 Sep, 2025 1.89 Lacs
Tender For name of work : supply of spare parts for annual repair and maintenance for related bec-n-11 rig machine, rig carrier, compressor unit carrier and truck carrier in district guna (as per bill of quantity). - description, main oil filter kit wire 220 411059, main oil filter kit wire 220 46019, kit air filter 1200 cfm 032400089, kit fuel filter cummins 338204, kit fuel filter cummins 3238493, kit sbp filter cummins 3879488, kit air element 3237962/3233498, hose pipe set cummins, fan belt set 41044472, water pump repair kit, hy hose h.j. 250 1.5 mt. length, hy hose h.j. 210 1 mt. length, plug master coupling b 2 b, 55x80x40 main air seal, h.b. -650 hose pipe r-2, 5.5 mtr. main return, rod carrier 89 mm rod, guide lock, gap plate, input shaft for transmission gear box, output shaft for transmission gear box, jack seal kit 3356, self 24 v. servicing & minor repairing, alternator 24 v. servicing & minor reparing, clutch plate leyland, main leaf spring rear, main leaf spring front, pressure plate complete, widral plate, fan belt, axel, filter body assembly, uj cross, filter set assembly, wheel greasing, self & alternator repairing & servicing, clutch plate leyland, main leaf spring rear, pressure plate complete, main leaf spring front, widral plate, axel, filter body assembly, uj cross, filter set assembly, fan belt, wheel greasing, self & alternator repairing & servicing, main leaf spring front, main leaf spring rear, u.j. cross lata, center bearing, axel tata, oil seal rear, water body, oil seal front, clutch plate, center bolts, kamani pin, kamani bush, wheel stud, wheel bearing front, filter set, self & alternator servicing & repairing, wheel greasing

Central Government/Public Sector

CTN :41304034 Due date: 19 Aug, 202519 Aug, 2025 1.99 Lacs
Tender For corrigendum : providing of custom bid for services - ---- repairing of equalizing gear of belt drive section

CTN :41391849 Due date: 18 Aug, 202518 Aug, 2025 NA
Tender For supply of 2 pole isolator switch , wiper blade front 600 driver , assy fuel filter , fuel pre filter kit , repair kit wheel cylinder , minor rep kit for slave cylinder , repair kit for slave cylinder , grooved lock , wheel cyl kit , repair kit mechanical transmission , parts kit slave cylinder , mounting engine front , switch assy change over , spark plug , spacer gear shift lever , solenoid valve , slave cylinder , oil catcher , sealing ring , locking plate , lock plate for grooved nut , bearing tapered roller , oil seal , bearing , assy pull cable , passangers fan

State Government

CTN :41355801 Due date: 12 Aug, 202512 Aug, 2025 NA
Tender For repairing of all gear box and its accessories at wazirabad barrage. - dismantling of gearbox by removing both end couplings and extracting the complete shaft assembly from the barrage gates. this includes removal of thrust and steel blocks using skilled labour and specialized lifting equipment. the gearbox top cover (top half) shall be removed, followed by detachment of the bottom half from the main gearbox body. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., dismantling of drumbox assembly by removing both end couplings and extracting the complete shaft,bear and gear assembly from the drum box .. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., thorough cleaning of all components to remove debris, contaminants, and residual lubricants using appropriate cleaning agents and methods. detailed inspection of each component to assess condition, identify wear, damage, or corrosion, and document findings for further repair or replacement as required., repair of limit switch assembly of gear box including the complete overhauling /oiling and greasing including replacement of parts as per sample ., replacement of normally open (no) switch and contactor with a relay, along with the complete installation of electrical components for the gear box in the hoisting mechanism of the barrage system, replacement of brake pad as per sample along with complete fitting and integration in the gearbox assembly, replacement of brake coil as per sample along with complete fitting and integration in the gearbox assembly, replacement of bearing no 6315/c4 djb approved makes, replacement of bearing no 6312m/c3 djb approved makes, replacement bearing no 6308 2rs1 djb approved makes, replacement bearing no 6310 2rs1 djb approved makes, complete assembly of the gearbox, including packing, greasing, and installation of both end shafts with cast iron (c.i.) couplings and bolts. ensure proper alignment and secure fastening to maintain efficient power transmission and operational reliability, complete overhauling and lubrication of all moving and critical components of the drum box assembly of the gearbox, using appropriate tools such as grease guns and nipples. the work shall be carried out by skilled labor as per site requirements. ensure proper lubrication with the specified grade and viscosity of grease to maintain optimal performance and prevent wear and tear of mechanical parts including internal parts of painting, the work involves achieving precise/making alignment of the shaft connecting the drum box and gear box in the hoisting mechanism of the barrage. proper alignment is critical to prevent deviation from the guide grooves during operation particularly during lifting and to ensure long-term stability and accuracy of sluice gate movement.the job includes dismantling the existing shaft (which transmits motion between the drum box and gear box), carrying out realignment, and reinstalling the shaft with high precision. to restore the system to optimal operating condition, the work shall also involve the replacement of associated hardware components as required such as bearings, couplings, keys, and fasteners.this intervention is essential for the reliable and efficient functioning of the sluice gate lifting system and to prevent operational issues during gate actuation., after cleaning and overhauling the gear and shaft of the gearbox, refit and them in their original positions with making alignment with all movement parts of gear box and ensure that they are functioning properly., conduct load testing of 3under sluice and 3weir side gates and weir side gates during

CTN :41289786 Due date: 12 Aug, 202512 Aug, 2025 1.44 Lacs
Tender For providing of custom bid for services - custom bid for services - repair of fl; work for repair of fork lift (fl) (ba no. 10h-001266e) is appended in the table, below:-repair/replacement of driver axle, repair/replacement lift cylinder, repair/replacement lift chain, repair/replacement of wear and tear fork, repair/replacement of tilt cylinder, repair of hydraulic transmission, repair/replacement pedals with bracket, repair/replacement leavers, repair/replacement clutch cable, wheel servicing, repair/replacement gear shaft, repair of hydraulic pump.
 Loading, Please wait...

Connect us via What's Up