Get complete information related to latest Erection Clamp Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Erection Clamp Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Erection Clamp Tenders.
Tender For competitive e-bidding for supply of lifting material for bisalpur kisan sahkari chini mills ., ltd., bisalpur ( pilibhit ) for the season 2025-26 - heading, usha martin make steel wire rope hemp core tested quality having tensile strength of 180kg.n/mm squ. confirming to is-2266/89 ,with test certificate.(6/19 material construction) -size-3/4 , but -size-3/8 , shalimar make manila rope mufd.to is/bs specification with test certificate .size 3/4", shalimar make manila rope mufd.to is/bs specification with test certificate .size 1", heavy duty poly propylene rope 3stand hawser laid, tuff make, tested quality, with test certificate. size 1 / 3/4 , heavy duty nylon rope 3stand hawser laid, tuff make, tested quality, with test certificate. size 1 , usha martin make wire rope sling as per above spec. with both end sealed looped in o shape 12 length for 15 tone load crane hook grip. with test certificate size 3/8 x 4 met., but size 1/2 x 02 met., but size 1/2 x 04 met., but size 5/8 x 03 met., but size 3/4 x 11 met., but size 1.1/2 x 04 met., u clamp forged steel for 1/2 rope., but for 3/4 rope., indef make chain pulley block with 15 met. tested lift chain capacity. with test certificate. capacity --01 tone. heavy duty-p series, but 02 tone with 15 met. tested lift chain heavy duty. p series with test certificate., but 03 tone with 20 met. tested lift chain heavy duty. p series with test certificate., but 05 tone with 20 met. tested lift chain heavy duty. p series with test certificate., indef make extra tested lift chain for above chain pulley block. heavy duty-p series
Tender For supply of drum lifting clamp ( capacity 0 to 300 kgs.), make : vedanta lift, global or similar. [ warran ty period: 30 months after the date of delivery ]
Tender For corrigendum : miscellaneous machinig items - boss to drg.tr24014b rev-01, item-13 & st 600060., lifting lug to drg.tr24049l item 02 & style 600257., sampling attachment to drawing 34991950030 rev-01,var-03 & to st 604147., teel clamp ring to drg no 34993000009 rev-01 item-01 and to st.604929, equalising pad for m type oltc to drg.34998800021 rev-1a var-00 item 01 & 02 to style-604969., clamp 125 dia x 300 lg lg hts bar to drg.24998100016 rev-03 item-01, to style-605401., tightening nut 125 dia x 65 lg hts bar to drg.24998100016 rev-03 item-02 to style-605477., screw 24 dia 190 lg hts bar as per drg.44997050011,rev-02, item-01 to style-626536., steel washer to drg 44997050012 rev-02, item-1 to style-626833., clamping bolt(hts)46a/f m30x250lg to drg.14997050013 rev-11,item-10 to style-628123. note: supplier to ensure: clamping bolts are to be supplied with electro tinning (15 microns)as per notes to supplier mentioned in the drawing., clamping bolt (hts) m 36 x 250 to drg. 34997050094 rev-02 item 07 to style-628126.
Tender For corrigendum : supply of other section , m and l for two coats of synthetic enamel paint over a coat of red oxide primer on new steel surfaces width or girth exc 10 cm including preparation of surfaces all as specified and as directed. , m and l for three coats of white washing on new plaster and unplaster of wall surfaces including preparation of wall surfaces complete all as specified and as directed. , s and f steel stainer for sewage sumps of different pores as specified and directed by engineer in charge , suppy of stand by non clogging pump of 5hp 1520 lpm with all accessories and fittings as specified and directed by engr in charge , heavy duty double tank type chemical dosing system consist of service tank 150 ltrs capacity with dosing system plunger type , s and f gi strip 25x4mm as earthing lead bolts nuts checknuts and washers all as specified and directed , material and labour for earthing complete with galvanized steel plate electrodes of size 600mm x 600mm x 6mm thick , pumping out sewage water from the existing sumps of sewage plant pump house with the help of non clogging of pump any kind capacity of pump set not less than 2160 lpm , lifting the non clogging pump set electrically operated by 15hp 20 hp 3 phase motor incl column pipe line shaft etc , dismantling of non clogging submersible pump of capacity 15hp 20 hp for comprerhensive maintenance and if required taking out burnout old winding from the stator , lowering complete the non clogging pumping set and reflixing the motor carefully including connection and testing , pumping out sewage water from the existing sumps tanks of stps mbbr technology with the help of non clogging , cleaning of 1.2 mld sewage treatment plant after pumping out sewage water from the existing sumps , lifting the non clogging submersible pump set electrically operated by 3.7 hp 3 phase motor incl column pipe line , dismantling of non clogging submersible pump of capacity 3.7 hp and taking out burnout winding from the stator of motor and rewinding with pvc copper wire , dismantling of electric sewage induction motor 3.0 hp ac 3 phase 415 volts from site after disconnecting from pump , dismantling non clogging pump set of centrifugal type 3.0 hp induction motor ac 3 phase 415 volts , dismantling of electric induction blower motor 5.0 hp ac 3 phase 415 volts for comprehensive maintenance from site after disconnecting , dismantling of electric induction blower motor 30.0 hp ac 3 phase 415 volts for comprehensive maintenace from site after disconnecting from blower electric connection , material and labour for pcc 1 3 6 type c2 using 40mm graded stone aggregate for foundation etc , m and l for taking out comprehensive maintenance of existing unserviceable air blower of any make of capacity 125 cubic hr to 188 cubic hr with taking out of electric cable , supply only gear oil ep 90 complete all as specified and as directed by engineer in charge. , supply only air filter suitable for existing one complete all as specified and as directed by engineer in charge. , supply only belt as per existing model complete all as specified and as directed by engineer in charge. , supply only bearing as per existing complete all as specified and as directed by engineer in charge. , supply only set of rotor with hub as per existing model complete all as specified and as directed by engineer in charge. , m and l for finding out defect of stps panel and taking out burnt interconnection wiring including u.s and serviceable component for re use including rewiring of panel , supply and fix in repairs flexible flat pvc copper couductor stranded submersible cable cores 1100 volt grade 4 sqmm 3 bid details/ 2 / 41 core , supply and fix in repairs flexible flat pvc insulated pvc couductor stranded submersible cable cores 1100 volt grade 10 sqmm 3 core , s and f round strand steel wire rope dia 12 mm and connected clamp nut bolts fixed complete all as specified and as directed by engineer in charge. , s and f submer
Tender For supply of insulated rail dolly with chain sling arrangement for transportation of sleeper & rail of all size and shape with one or more dolly, scissor clamp pf inside dia 22mm which can insert in the attachment of sleeper, lifting capacity should not less than 0.5 tons for 60 kg rail. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu
Tender For supply of vertical lifting clamp (merrill hook), 0.5 ton capacity, jaw opening: 0-15mm, make: ferroter ro/safelift/indef/able [ warranty period: 30 months after the date of delivery ]