Get complete information related to latest Field Coil Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Field Coil Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Field Coil Tenders.
Tender For procurement of spares of drum sampling cooler and main steam cooler for unit no 1 to 4 210 mw unit sgtps mppgcl birsinghpur -drum coil , ms coil , fitting
Tender For providing kitchen equipments and its accessories for two mess block of boys hostel and girls hostel cutn thiruvarursubwork/packages:providing kitchen equipments and its accessories for two mess block of boys hostel and girls hostel cutn thiruvarur-supplying, installation, testing, and commissioning of 100 kg/hr gas-operated steam boiler for kitchen application including all accessories etc., as required.a) gas-operated steam boiler.design: coil type, forced circulation typemaximum steam output (@100deg c): 100 kg/hroutlet steam condition: dry, saturatedmax. working pressure: 10 kg/cm2max. operating pressure: 3 kg/cm2safety valve set pressure: 10 kg/cm2thermal efficiency: 90% +/- 2%power supply: ac, 3 ph, 415v, 50 hz, 4-wire systemb) mountings & fittings detailsmain steam stop valve- 25 mm nb-1 no.safety valve - 15 mm nb-2 nos.shell blow down valve 25 mm nb-1 no.air vent valve - 15 mm nb-1 no.isolation valve along with pressure guage - 1 no.c) feed water pump and tank. type: reciprocating, piston typepump capacity: 100 lphhead: 115 mwcoutlet steam condition: dry, saturatedd) burnerfuel: lpgtype: monoblockfuel consumption: 5.5 kg/hre) m.s. straight chimney, with ladder, base plate, nuts & bolts, template for foundation, foundation bolts, including painted with heat resistant aluminium paint and foundation etc., as required.diameter: 150 mmheight - 6 m (vertical) + 3m (horizontal connecting pipe from boiler to chimney)sheet thickness - 5 mmf) feed water tankpvc water tank capacity- 500 litretank having valves, strainer, drain pipe & level indicator, with ms structure (height-2m)tank thickness - 3 mmf) pressure reducing stationnon-ibr prs - steam pressure reducing station for upstream pressure of 10 kg/cm2, downstream pressure of upto 3 kg/cm2, complete with valves, safety valve, pressure gauges, steam trap assembly, prv, inter-connecting pipeline etc.g) softner plant along with interconnecting pipe and its accessories.capacity: 1.5 m3/hroutlet design hardness: < 5 ppmvessel moc: frppiping moc: upvcoperating pressure: 3.5 kg/cm2capacity of brine tank: 80 litremoc of brine tank: lldpeh) softener feed water pump with electrical starterflow rate - 1 m3/hrhead: 35 meteroperating voltage: 3 phase, 415 volts(make: thermax/ thermodye /southern boilers)supplying, laying/ fixing, testing and commissioning of following nominal sizes of seamless c-class heavy duty ms non - ibr steam piping plumbing inside the building (with necessary clamps, vibration isolators and fittings including valves, and flexible steam pipe for connecting to steam vessel etc.) duly insulated with fire retardant quality expanded thermal mineral wool and finally applying 0.63mm aluminium sheet cladding complete, repairing of damage to building etc. as per specifications and as required complete in all respect.40 mm (32 mm thick insulation)25 mm (19 mm thick insulation)20 mm (19 mm thick insulation)supplying, installation, testing and commissioning of tiltable steam operated double jacket rice vessel with lid of 25 kg capacity etc., as required.it is made out of a 14 swg 304-grade ss sheet with a bottom perforation plate and funnel at the bottom drain kanji. the lid is made out of 20 swg sheets. this unit has a drainage valve, ss handle, and ss stand made out of 14 swg 304 grade ss sheet with bottom.supplying, installation, testing and commissioning of tiltable steam operated double jacket dhall steam vessel with lid of 75 litre capacity etc., as required.it is made out of a 14swg 304-grade ss sheet with a bottom perforation plate and funnel at the bottom drain kanji. the lid is made out of 16 swg sheets. this unit has a drainage valve, ss handle, and ss stand made out of 14 swg 304 grade ss sheet with bottom.supplying, installation, testing and commissioning of tiltable steam operated double jacket milk steam vessel with lid - 100 litre capacity etc., as required.it is made out of a 14swg 304-grade ss sheet with a bottom perforation plate and funnel at the
Tender For bid to ras custom bid for services - sludge and insulation removal of tank 120 t 05a-1.1. sludge removal: the approximate sludge / oil inside the tank is to a tune of 2800 cu.m. a) agency needs to assess the quantity of sludge through site visit prior to quoting. b) the quantity provided is the best estimate and may vary. please note that additional payments will not be made for excess sludge removed, and no deductions will occur in the event of lesser sludge quantities with respect to the sludge quantity mentioned above. c) approach path from south main road (i.e., from south of the common dyke of tanks 120-t05a,05b,06,06b) up to south west of tank 120-t-05a shall be provided by hpcl. d) however, approaches / access requirement around the circumference of the tank to facilitate sludge removal and insulation removal, the preparation of the same shall be in within agency scope. e) agency has to collect sludge using sludge bins at outside of clean out door. if required, excavation for placing sludge bins matching the elevation of the clean out door has to be done by agency. sludge bins to be mobilized by the agency. f) disconnecting existing electrical connection, temporary dismantling of platform, ladder or any other structural, fire protection system like cooling water connection, foam connection, removal of existing instruments and any other removable or fixed attachment required for isolating the tank is in agency scope. g) removal of existing instruments, accessories etc. provided in existing tanks and preserve the same in designated area as per instruction of job engineer is in agency scope. h) removal of sludge from tank, transfer of sludge to designated area, unloading / dumping of sludge in designated area (sludge lagoons) inside refinery, complete cleaning of the tank after sludge removal, making the tank hydrocarbon free and suitable for further hot work is in agency s scope. contractor to submit sludge removal procedure to hpcl. i) opening / cutting shell course (coupon cutting) for creating access for entry of excavator / jcb inside the tank for carrying out sludge removal. barricading inside tank in coupon cutting area for hot work preparation for coupon cutting is in agency scope. any other preparatory jobs as per jsa for carrying out hot work for coupon cutting and vehicle entry inside tank is in agency scope. j) existing steam coil: agency shall dismantle existing steam coil including supports from the existing bottom plate. k) sacony & propeller mixers: agency shall dismantle existing sacony mixers & propeller mixers. l) wherever existing internals are removed like sacony mixers / eductors / propeller mixers / jet mixers / heating coils etc., care shall be taken not to damage the bottom plate during removal of supports. m) all necessary work related to isolation of tanks to carry out sludge removal including removal of piping spools including tagging and dumping in the designated yard, blinding of nozzles, proper barricading required shall be in contractor s scope and shall be carried out as per instructions of job engineer. n) transportation and dumping of all scrap materials generated during modification works, after cleaning, in the designated scrap yard as per instruction of the job engineer. o) arranging of all equipment, tools & tackles, machinery, lifting equipment, mobile crane, fork lift, crane, jcb, tipper, trailer, scaffolding etc. is in the scope of the agency.-msme exemption - no | startup exemption - no