Get complete information related to latest Final Drive Gear Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Final Drive Gear Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Final Drive Gear Tenders.
Tender For supply of spare parts of bottle sealing/filling machine - for semi automatic sealing machine sealing roller, threading roller, pressure head size 28mm, 25mm, arm set, camel of semi automatic sealing machine, lock washer, head returning spring, side came arm spring, skirt roller spring, thread roller spring, bottle guide spring, big bevel gear 90 teeth, small bevel gear 30 teeth, clamping spring, came, pressure plate, side came arm, side came arm roller pin, main head bush, spining head, centre shaft, clutch plate, main shaft, base guide aluminum, thrust bearing with racer plate, head set complete, bottle rest rubber, gear box of semi automatic sealing mach., electrical motor of semi automatic sealing mach., worm gear of semi automatic sealing mach., pressure piston, sleeve with bush, label printing machine, system driven unit, syntactic rubber disc od-100mm.thick-12.5mm., spining head spring, pressure piston spring, sealing machine side bar spring, pump for bottle sealing machine, for semi automatic filling machine filling compressor, vacuum pump with motor (complete set), rubber foam washer, fiber nozzle, pvc transparent flexible pipe (netting) 3/8" and 1/2", pvc transparent flexible pipe (netting) 1", pvc transparent flexible pipe (netting) 2", buffer set complete, for spare for conveyor belt machine worm gear of conveyor gear box, gear box of conveyor, complete set of gear box with suitable motor, conveyor ss belt, conveyor belt (end less), conveyor gear plastic, conveyor housing, eligetor size- 35/55, chain of gear box, chain sprocket 14teeth 1/2" pith with extra long neck, -do- 39 teeth, -do- 36 teeth, -do- 30 teeth, conveyor belt 5mm. x 10"width with both side rubber line, complete bracket set for bottle guide, conveyor bench support rail, for spare for rinsing machine electric motor with pump, water filter, bottle support base, system driven unit, copper nozzle of rinsing machine, complete mechanical seal kit for monoblock pump., gear box for rinsing machine
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai power plant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinion shaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinion shaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinion shaft w.r.t to governor assembly., h) put electronic over speed shaft (pinion shaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring box assembly, 4. remove spring box assembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring box assembly hinges & pins etc., 11.place spring box assembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl
Tender For supply of rana flp coal drill machine spares - drill chuck 8gh , circlip for gear box 7gh , oil seal for gear box 6gh , gear case 1hg gear box body 1gh , internal gear with shaft 50 teeth 2gh , plug socket assy flp 56c , disc insulator 56c2aa , circlip for dc connector circlip 44mm 56c7 , circlip 54mm dia 56c8 , plug and socket 56c2 , housing for plug and socket insulator 56c1 , set of screw for plug and socket 56c6 , rotor pinion 10t 10gh 10gh , rotor shaft 10 teeth 20mh , end cover for rana drill 26mh , bearing cover 29m , circlip for bearing cover 30mh , fan 22mh , key for fan 24mh , nut for shaft fan side 23m , fan cover 48mh , handle left side 36mh 36mh , fibre packing handle upper 45ma , fiber packing handle lower 45mb , handle for pilot switch 39mh , pilot switch assy 47mp , operating lever 40mh , bolt for fan cover 28m , ln screw for pilot handle 37m , screw for left handle 43m , ln screw for operation lever 41m , hinge screw for adjusting lever 42m , diode with bush 47mp1 , head body drill 32 mh 32mh , rotor with shaft 21mh , stator 31mh , gear box assembly 12gh