Web Analytics Made Easy - StatCounter

Fire Hydrant Pump Repair Tenders

Get complete information related to latest Fire Hydrant Pump Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Fire Hydrant Pump Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Fire Hydrant Pump Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40361472 Due date: 24 May, 202524 May, 2025 NA
Tender For maintenance of electrical installations & fans i/c repair and maintenance of sub-station equipments, gensets, a/c units, fire alarm & fire hydrant system, water supply pumpsets and street lights at central council for research in siddha at tambaram, chennai-47.subwork/packages:amc of 125 kva diesel generator set

State Government

CTN :40415211 Due date: 03 Jun, 202503 Jun, 2025 8.12 Lacs
Tender For supply installation testing and commissioning of new fire hydrant system and repair of the existing fire protection system for gpsc at edc house panaji

Central Government / Public Sector

CTN :40225486 Due date: 26 May, 202526 May, 2025 NA
Tender For corrigendum : annual maintenance contract for repair and maintenance of fire fighting equipment at erpl, rajbandh - amc for repair and maintenance of f&s eq, carrying out maintenance and inspection of fire extinguishers on monthly basis including pastings/ marking of maintenance date, clea ning, condition of threads of caps, discharge tubes, sharpness of piercing pin and cylinder body, replacement of defective parts ( iocl supplied), measuring weight and charges for labour, including oiling, greasing, testing as per direction of eic inclusive of al l tools &tackles, consumables, transportation, labour charges etc and measuring instruments for the same as directed by the eic/ si te engineer and submitting the reports of the inspection as per hse manual format (payment of spares not supplied by iocl shall be m ade as per respective items), for 10/9 kg. capacity dcp extinguisher, for 75/70/50 kg. capacity dcp extinguisher, for 4.5 kg. capacity co2 extinguisher, for 6.5 kg. capacity co2 extinguisher, for 2 kg capacity clean agent extinguisher, monthly: checking, inspection, maintenance, greasing, cleaning, oiling, replacement of disc washer, blank cap if any including compl ete overhauling etc. of double headed hydrant valves alongwith all tools, tackles, manpower, material etc. payment for disc washer, coupling washer & blank cap shall be made separately., supplying and fitting of hydrant disc washer as per directions of engineer-in-charge, supplying and fitting of fire hydrant/ fire hose coupling washer, supply and fitting of blank cap (as per is 5290 , red colour with gi chain) suitable for 63 mm hydrant outlet as per direction of ei c, supplying & fitting spindle assembly (gunmetal), repair of adaptor lug of hydrant/ hose inclusive of tools tackels & labour etc., monthly maintenance of 750 gpm monitors: oiling & greasing through grease nipple provided on bearing, worm wheel and worm shaft, cle aning, performance checking for complete vertical and horizontal movement, nozzle movement, water throw, foam suction, ensuring prop er tightning of flanges, clearing the debris around the nozzle etc as per approved procedure including tools & tackles, report submi ssion complete as per direction of site engineer / eic. water resistant low friction synthetic grease, grease gun and all other cons umable etc shall be arranged by vendor. after testing, afff jerry-can must be positioned and replinished near monitor including shif ting, transportation etc., cleaning, maintenance and repair of water cum foam monitor nozzle for fog jet operation by opening and dismantling of nozzle cleanin g by rustoline or kerosene of all the components thoroughly, further inspection of internal parts in the presence of the engineer-in -charge, repair/reconditioning by hand facing, machining, grinding, lapping, etc. and greasing,& reassembly in foam monitors as per direction of eic inclusive of necessary tools, tackles and labour., opening of blind flange of water curtain system of control building, sr tank cleaning of water line, dechoking of spray nozzles, ref ixing it with after testing with new gasket.etc of water spray system of all buildings (on monthly basis) including nozzle dechoking , strainer cleaning and all labour, tools & tackles complete as per direction of the site engineer/ eic. (rates per blind opening), valve maintenance : checking, inspection, greasing, cleaning, oiling etc. of all fire water valves, of all sizes upto 14" including grease and all labour, tools & tackles complete as per direction of site engineer / eic and provided by contractor. all such valves shall be fully closed and opened and restored in origional condition as per advise by eic/ site engineer.note: the valve sizes may vary from 3" to 14". rates are per valve., hydrotesting of fire fighting delivery hose of dia 63 mm on half-yearly basis (type a and b ) by making arrangement of hydraulic pum p, blind, shifting from plant area, bui

State Government

CTN :40354062 Due date: 26 May, 202526 May, 2025 1.71 Lacs
Tender For emergent repair of pipe line for fire hydrant system at ground floor of office block of city civil court building during the year 2025_2026

CTN :40291004 Due date: 24 May, 202524 May, 2025 76.39 Lacs
Tender For supply and installation of 1000gpm remote operated hvlr - amc / cmc of fire detection, fire alarm, fire hydrant and sprinkler system operation and maintenance of fire alarm system repair, maintenance, and installation of plant/ systems/equipments (version 2)

CTN :40295812 Due date: 20 May, 202520 May, 2025 5.74 Lacs
Tender For custom bid for services - outside shed maintenance assistance services-1. maintenance & necessary routine repairs for carousel & other on-line equipment & maintaining necessary records of their calibration, 2. maintenance & necessary repairs for smooth operation of chain conveyor system in the plant, 3. maintenance and necessary repairs of other equipment in the filling/storage shed., 4. maintenance of major plant equipment: carrying out `a' check maintenance of major equipment involving visual inspection, checking oil level, checking drive belt tension, greasing of moving components as & when required, checking and correcting of leakages from any joints. it will involve the following equipment: (a) air compressors (04 nos.) (b) lpg pumps (03 nos.) (c) lpg compressors (03 nos.) (d) fire engines (06 nos.) (e) jockey air compressor (02 no.) (f) jockey pumps (02 no.) (g) service water pumps (02 nos.) (h) tt gantry bays (6 nos), 5. maintenance of miscellaneous & special equipment. this involves providing technically suitable carrying out to maintain & repair (if required) of the following equipment: (a) remote operated valves (b) lpg line (vapour and liquid) gate valves, ball valves (of all sizes) (c) solenoid valves (d) frl units (all along the airlines) (e) valve crushing machine (f) valve salvaging setup (g) cylinder hydro testing machine (h) pneumatic valve testing machine. (i) paint booth (j) hydrant points and jet monitors (fixed and movable) (k) compressed air line gate valves, ball valves (all sizes) (l) service water line gate valves, ball valves (all sizes) (m) regulator test bench (n) cylinder crushing machine (o) mechanical parts of equipment related to mounded storage vessel. (p) stationary filling scales for industrial cylinder filling. (q) online degassing machine, 6. up keeping of maintenance store: this involves upkeeping of maintenance store, maintaining all records, proper stacking of material in the maintenance store. inventory log book to be maintained for the movement of items in the maintenance store. all the movements of item should be noted in inventory log book. inventory of items in the maintenance store should be match with quantity of inventory log book. party will be responsible for any variation in the inventory of items. this amount is debited to the party. welding related will also be required from fitter as on when required. 1. fabrication of ms structures like angles, bends, tees, plates, beams, channels of various sizes including scrapping & applying two coats of red oxide primer and paint to the structure. 2. removal / fixing of cast iron gate / plug/ ball valves on the pipeline. the size of the gate valves varies from 1" to 16" dia . the valves & nut bolts required for the job will be supplied by hpcl. the shifting of valve from one site to another site within installation premises shall be in contractor's scope. 3. dismantling / removal and laying of ms (erw as well as seamless) pipeline. the maximum height of the pipe line position may be 20 meters. the size of the pipeline varies from 1/2" dia to 16" dia. the shifting of pipelines from one site to another site within installation premises shall be in contractor's scope. 4. welding in ms pipeline having diameter up to 16". 5. fabrication / casting of ms reducer / enlarger of various sizes up to 10" dia and vice versa. all the material required for the job except welding rod, welding machine shall be supplied by hpcl. 6. fabrication & welding of chain conveyor system. 7. allied welding & fabrication jobs in dg shed, mcc panel, air & lpg compressor shed, pump house, cylinder filling/storage shed, fire pump house & cylinder retesting shed.
 Loading, Please wait...

Connect us via What's Up