Get complete information related to latest Firewood Boiler Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Firewood Boiler Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Firewood Boiler Tenders.
Tender For corrigendum : tender for supply of procurement of spares for boiler feed pumps of ubs and hrsgs : : 1st stage impeller p n 18 of hrsg bfp , 2nd stage imp assy p n 58 for hrsg bfp , 3rd stage imp assy p n 59 for hrsg bfp , 4th stage imp assy p n 60 for hrsg bfp , 5th stage imp assy p n 61 for hrsg bfp , last stage impeller p n 28 for hrsg bfp , inter stage diffuser p n 23 hrsg bfp , last stage diffuser p n 29 hrsg bfp , back up seal p n 13 , o ring 0.275 x18.975 id p n 67 , imp wr ring 1st stag u n 1054155 4015555 , pkg ring first stag u n 1054155 4215409 , copper coated gasket p n 68 , balancing drum nut u n 1054155 14873002 , lock washer u n 1054155 90012 03
Tender For corrigendum : tender for supply of procurement of koso valves spares for boiler pressure parts at ntpc khargone : : -as per technical data sheet , as per technical data sheet , as per technical data sheet , as per technical data sheet , as per technical data sheet , as per technical data sheet , as per technical data sheet , as per technical data sheet , as per technical data sheet , as per technical data sheet
Tender For providing of custom bid for services - 200149440 biennial running maintenance contract for orbis make boiler elevators orlifts in stage 1 along with spares supply at ntpc sstps
Tender For procurement of spares of alekton make triple screw pump for hfo system model dh 600 1600 2sj, series d installed in boiler of 1x500 mw unit, sgtps, mppgcl, birsinghpur.
Tender For restoration of bottom ash hopper by mother plate replacement and its allied works along with supply of fire crete (normal) castable refractory & its applications during u#8coh, work of mechanical maintenance / servicing of id fans (ndzv 33 s), fd fans (ap1-18/11) and pa fans (ap2-17/12) during overhaul / shut down / as & when required basis, construction of testing lab near dm plant building, work of fabrication of tube bends for high pressure parts of boiler for 3x660mw units , work of radiography & radiographic interpretation of hp weld joints and ultrasonic thickness survey of boiler tubes during shutdown on as and when required basis, procurement of zero speed switches (zss), supply, erection & commissioning of flow transmitters, work of overhauling and mechanical maintenance of various ash slurry pumps, oil handling pumps, water handling pumps, installed, work of dismantling & removal of decommissioned unit-7 assemblies / spares of ahp area for its use in unit-6, design, manufacturing, supply, replacement of seals for cold air gate and damper during overhaul/shut down of unit-6, one year contract for work of replacement of coal feeder discharge chute of 24" gravimetric coal feeder during overhaul, short shut down & routine maintenance of coal mill xrp-803,unit-6.