Web Analytics Made Easy - StatCounter

Flooring Tile Tenders

Get complete information related to latest Flooring Tile Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Flooring Tile Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Flooring Tile Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40486328 Due date: 03 Jun, 202503 Jun, 2025 9.33 Lacs
Tender For name of work pay and use jsc (revenue) sub head - repair work of jsc ( flooring tile, wall tile, plaster, marble chips, sewer line component like manhole, cleaning of sewer line etc. ) at kamala nehru camp, kirtinagr, in motinagar ac-25,

corporations/Associations/Others

CTN :40468184 Due date: 10 Jun, 202510 Jun, 2025 15.00 Lacs
Tender For providng flooring tiles and painting work at community hall ward no 01 kattuudaikulam in manamadurai municipality

Central Government/Public Sector

CTN :40253670 Due date: 30 May, 202530 May, 2025 NA
Tender For corrigendum : sitc of smart classroom - auto tracking ptz camera , large format professionaldisplay, interective large format professional display,beamframing ceiling microphone, video matrix switcher,usb capture card, audio de-embedder, network &equipment racks, wireless presentation device, networkswitch & wi-fi router, sitc of carpet flooring tiles , sitc of

CTN :40418136 Due date: 28 May, 202528 May, 2025 3.51 Crore
Tender For special repairs to hostel block -3 (ambedkar hall of residence) for national institute of technology ( nit) at warangal, telangana state.sh: repairs to rcc works, brick works, floorings, roofs, toilets, bathrooms, doors, windows, ventilators, internal rooms and staircase floorings, terrace repairs, providing cup boards, internal and external painting, internal electrical wiring / rewiring, supply, installation, testing and commissioning of electrical fittings and fixtures of fans, mcb dbs and mcbs, geysers, water cooler with ro system, cctv, lan network with patch panel etc., including dismantling of doors, windows, partitions, stone slab floorings, tile work, old plaster work, gi lines, sw lines, wcs rain water pipes, electrical tube light fittings, ceiling fans, sockers, modular, wooden boxes, mcb dbs including mcbs , cables, sockers, etc.,

Central Government/Public Sector

CTN :39809665 Due date: 28 May, 202528 May, 2025 NA
Tender For corrigendum : supply of osaero job work for manufacturing of 238 parts as a package ref semfg573 - channel(sta#1c-#1d) , doubler-lh(sta#1b-1c) , doubler-rh(sta#1b-1c) , zee member-lh , zee member-rh , strip - lh , strip - rh , frame-lh side(sta#1d) , frame -lh (sta#1c) , frame -lh (sta#1b) , frame -rh (sta#1b) , frame -rh (sta#1c) , frame-rh side(sta#1d) , stiffener-unfeathering pump , floor stiffener-aft(oil , accumulator , lh channel (sta#5-#6) , lh channel (sta #5 - #6) , lh doubler (sta #5 - #6) , lh channel (sta #11- #12) , lh channel(sta #11-#12) , lh stiffener-top(sta#8-#10) , lh channel(sta#10-sta#11) , partition floor(baggage , compartment , stringer top-rh(sta#4-#5) , stringer top-rh(sta#5-#6) , stringer top-rh(sta#6a-#8) , stiffner , stiffner , aux.frame(bottom)sta#16 , doubler-lh(longeron)(#18-#19) , doubler-rh(longeron)(#18-#19) , stringer (sta#17-sta#18) , stringer(sta#6-#7) , rh stringer(sta#2-#3) , bottom skin-lh(sta#14-sta#19) , doubler(sta#5-sta#6) , doubler(sta#1-#1a)-lh-ecs cover , doubler(sta#1-#1a)-rh-ecs cover , doubler-top-rh(sta#1-#1a) , shear wall aft-lh , lh-bottom frame(sta#6) , splice strap(sta#7)-lh , shear wall aft-rh , bottom frame(sta#6)-rh , stringer , lh sealing member , support bracket - (sta#1-#2)-lh , support bracket-sta#1-#2)-rh , channel(uplock bracket)-lh , channel(uplock bracket)-rh , zee stiffener(sta#4) , stiffner(sta#1-#2) , stiffener-rh(sta#12) , rh stiffener(sta#11) , lh stiffener(sta#12) , lh crimped doubler(#9-#10) , stiffner- lh (x=2349) , stiffner -rh (x=2603) , stifffner- lh (sta#12) , stiffner-lh(sta#11) , stiffner-rh(sta#x=2123.5) , stiffner-rh(x=2349) , channel-bottom floor , channel-bottom floor , stiffener bottom floor (sta#17) , channel-bottom floor , channel-bottom floor , lh crimped doubler(#9-#10) , stiffner (sta #4-#5) , lh floor sheet(sta #9-#10) , channel bot.-lh (sta #1-#2) , b channel bot.-lh (sta #1-#2) , b channel bot.-rh (sta #1-#2) , lateral channel (sta #1-#2) , channel bot.-rh (sta #1-#2) , cover plate (sta.#8 to #9) , battery shield sheet(sta#2) , channel top (sta#1a-#1) , cover , top frame(sta#10,x=2226) , bottom frame(sta#10,x=2226) , top frame(sta#11) , bottom frame (sta#11) , top frame(sta#12,x=2735) , bottom frame(sta#12,x=2735) , frame-lh(sta#18) , strip(sta#18) , inner plate(stepway) , plate-storage pouch rc , plate-storage pouch , top support , pouch plate rc - lh , pouch plate - lh , top supprt , bot. butt strap-fairing-lh , bot. butt strap-fairing-rh , butt strap(aft fairing)-lh , butt strap(aft fairing)-rh , doubler (fcs) -lh(#22-#23) , doubler (fcs) -rh(#22-#23) , skin-lh(sta#25-sta#26) , skin-rh(sta#25-sta#26) , channel-(iff ant.)(#19-#20) , doubler-lh(longeron)(#19-#20) , doubler-rh(longeron)(#19-#20) , doubler-lh(longeron)(#19-#20) , doubler-rh(longeron)(#19-#20) , splice strip-bottom , (sta#22)(x=5515 , rh-doubler (sta #1-#2) , scoop-oil cooler , rear scoop(oil cooler) , oil cooler duct-extension , hat stiffener-lh(sta#1b) , hat stiffener-rh(sta#1b) , stiffener(cover)-aft , stiffener(cover)-aft , doubler-lh , doubler-rh , stiffener(cover)-rh fwd , generator scoop-flange , generator scoop , rear scoop(generator cooling) , duct-top , duct-bottom , lh cover(hyd. di)(#18-#19) , stiffner-lh(#17-#18) , lh-cover(dcdb)(#17-#18) , vertical stifffener , stiffner(sta#18-sta#19) , ecs cover-rh(sta#1-#1a)) , lh-cover (sta#1a-#1) , lh doubler (sta#1a-#1) , side cover-rh , side doubler-rh , doubler(sta#14-sta#16) , rh-cover(#25 - #26) , lh-cover (gpu)(#19-#20) , outer strip side -lh , outer strip side -rh , channel-center(lh side frame) , channel-center(rh side frame) , nose rib sta#3 , nose rib sta#3 , nose rib sta#4 , nose rib sta#4 , nose rib sta#5 , nose rib sta#5 , nose rib sta#6 , nose rib sta#6 , nose rib sta#9 , nose rib sta#9 , nose rib sta#10 , nose rib sta#10 , nose rib sta#11 , nose rib sta#11 , i/s rib #3 center , i/s rib #3 center , o/b stringer #7 (top) , o/b stringer #7 (top) , shroud skin#3 , shroud skin#3 , shroud skin #4 , shroud skin

Central Government/Public Sector

CTN :39809671 Due date: 28 May, 202528 May, 2025 NA
Tender For corrigendum : supply of osaero job work for manufacturing of 317 parts as a package ref semfg572 - channel(sta#1c-#1d), doubler-lh(sta#1b-1c), doubler-rh(sta#1b-1c), zee member-lh, zee member-rh, strip - lh, strip - rh, frame-lh side(sta#1d), frame -lh (sta#1c), frame -lh (sta#1b), frame -rh (sta#1b), frame -rh (sta#1c), frame-rh side(sta#1d), stiffener-unfeathering pump, floor stiffener-aft(oil, accumulator, lh channel (sta#5-#6), lh channel (sta #5 - #6), lh doubler (sta #5 - #6), lh channel (sta #11- #12), lh channel(sta #11-#12), lh stiffener-top(sta#8-#10), lh channel(sta#10-sta#11), partition floor(baggage, compartment, stringer top-rh(sta#4-#5), stringer top-rh(sta#5-#6), stringer top-rh(sta#6a-#8), stiffner, stiffner, aux.frame(bottom)sta#16, doubler-lh(longeron)(#18-#19), doubler-rh(longeron)(#18-#19), stringer (sta#17-sta#18), stringer(sta#6-#7), rh stringer(sta#2-#3), bottom skin-lh(sta#14-sta#19), doubler(sta#5-sta#6), doubler(sta#1-#1a)-lh-ecs cover, doubler(sta#1-#1a)-rh-ecs cover, doubler-top-rh(sta#1-#1a), shear wall aft-lh, lh-bottom frame(sta#6), splice strap(sta#7)-lh, shear wall aft-rh, bottom frame(sta#6)-rh, stringer, lh sealing member, support bracket - (sta#1-#2)-lh, support bracket-sta#1-#2)-rh, channel(uplock bracket)-lh, channel(uplock bracket)-rh, zee stiffener(sta#4), stiffner(sta#1-#2), stiffener-rh(sta#12), rh stiffener(sta#11), lh stiffener(sta#12), lh crimped doubler(#9-#10), stiffner- lh (x=2349), stiffner -rh (x=2603), stifffner- lh (sta#12), stiffner-lh(sta#11), stiffner-rh(sta#x=2123.5), stiffner-rh(x=2349), channel-bottom floor, channel-bottom floor, stiffener bottom floor (sta#17), channel-bottom floor, channel-bottom floor, lh crimped doubler(#9-#10), stiffner (sta #4-#5), lh floor sheet(sta #9-#10), channel bot.-lh (sta #1-#2), i/b channel bot.-lh (sta #1-#2), i/b channel bot.-rh (sta #1-#2), lateral channel (sta #1-#2), channel bot.-rh (sta #1-#2), cover plate (sta.#8 to #9), battery shield sheet(sta#2), channel top (sta#1a-#1), cover, top frame(sta#10,x=2226), bottom frame(sta#10,x=2226), top frame(sta#11), bottom frame (sta#11), top frame(sta#12,x=2735), bottom frame(sta#12,x=2735), frame-lh(sta#18), strip(sta#18), inner plate(stepway), plate-storage pouch rc, plate-storage pouch, top support, pouch plate rc - lh, pouch plate - lh, top supprt, bot. butt strap-fairing-lh, bot. butt strap-fairing-rh, butt strap(aft fairing)-lh, butt strap(aft fairing)-rh, doubler (fcs) -lh(#22-#23), doubler (fcs) -rh(#22-#23), skin-lh(sta#25-sta#26), skin-rh(sta#25-sta#26), channel-(iff ant.)(#19-#20), doubler-lh(longeron)(#19-#20), doubler-rh(longeron)(#19-#20), doubler-lh(longeron)(#19-#20), doubler-rh(longeron)(#19-#20), splice strip-bottom, (sta#22)(x=5515, rh-doubler (sta #1-#2), scoop-oil cooler, rear scoop(oil cooler), oil cooler duct-extension, hat stiffener-lh(sta#1b), hat stiffener-rh(sta#1b), stiffener(cover)-aft, stiffener(cover)-aft, doubler-lh, doubler-rh, stiffener(cover)-rh fwd, generator scoop-flange, generator scoop, rear scoop(generator cooling), duct-top, duct-bottom, lh cover(hyd. di)(#18-#19), stiffner-lh(#17-#18), lh-cover(dcdb)(#17-#18), vertical stifffener, stiffner(sta#18-sta#19), ecs cover-rh(sta#1-#1a)), lh-cover (sta#1a-#1), lh doubler (sta#1a-#1), side cover-rh, side doubler-rh, doubler(sta#14-sta#16), rh-cover(#25 - #26), lh-cover (gpu)(#19-#20), outer strip side -lh, outer strip side -rh, channel-center(lh side frame), channel-center(rh side frame), nose rib sta#3, nose rib sta#3, nose rib sta#4, nose rib sta#4, nose rib sta#5, nose rib sta#5, nose rib sta#6, nose rib sta#6, nose rib sta#9, nose rib sta#9, nose rib sta#10, nose rib sta#10, nose rib sta#11, nose rib sta#11, i/s rib #3 center, i/s rib #3 center, o/b stringer #7 (top), o/b stringer #7 (top), shroud skin#3, shroud skin#3, shroud skin #4, shroud skin #4, shroud riblet #2, shroud riblet #2, nose skin (top) (sta#1-sta#3a), nose skin (top) (sta#1-sta#3a), nose skin (bot) (sta#1-sta#3a), nose skin (bot) (sta#1-st

State Government

CTN :40408129 Due date: 23 May, 202523 May, 2025 4.59 Lacs
Tender For dbups chankankari in ambalapuzha group- providing flooring tiles and false ceiling to the auditorium reg.

CTN :40343465 Due date: 22 May, 202522 May, 2025 2.54 Crore
Tender For comprehensive renovation of g1 and g2 block at national institute of technology nit at warangal telangana state. sh repairs to brick works floorings roofs toilet bath rooms doors windows ventilators internal rooms and staircase floorings terrace repair providing cup boards internal and external painting iei led fittings and fans including dismantling of doors windows partitions stone slab floorings tile work old plaster work gi lines sw lines wcs rain water pipes etc.

CTN :40329382 Due date: 21 May, 202521 May, 2025 NA
Tender For supply of modified floor stiffener for head stock beam to sk.no.llh -06/10,alt no. 2. [ warranty period: 30 months after the date of delivery ]

CTN :40080621 Due date: 02 Jun, 202502 Jun, 2025 NA
Tender For supply of modified floor stiffener etc.
 Loading, Please wait...

Connect us via What's Up