Get complete information related to latest Foot Step Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Foot Step Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Foot Step Tenders.
Tender For supply of points man footstep for 3 phase loco as per drawing no. ngp/trs/4/25.184. [ war ranty period: 30 months after the date of delivery ]
Tender For supply of footstep assly (lh&rh) for wag-9 loco specification :- clwspec no-clw/ms/3/103 alt-2 drg no-1209.01.140.100 (for lh)clw drg no 1209-01-140-101(for rh0 [ warranty period: 30 months after the date of delivery ]
Tender For repair/maint of pumping sets of water supply installation at af station bkt and repair /maint of hanger lights, fire alarm system and other connected work at af stn bkt
Tender For repair/ maintenance of compact sub station of various capacities, hanger lamps, copper earthings alongwith connected works at c-130j complex at 87 sqn at afs panagarh under ge (af) panagarh
Tender For repair/ maintenace of fire alarm system, smoke detectors, flame proof lights, aviation light, hanger light and fittings/fixtures alongwith certain miscellaneous work at various location of 39 wing at af station udhampur
Tender For supply of baby footstep for 3-phase locomotives (with red oxide painted) as per s.c.rly. drg.no.c/els/lgd/b.f/3/27 alt.2. [ warranty perio d: 30 months after the date of delivery ]
Tender For supply of footstep arrangement to drg.no. icf/std-2-4-001,col-i, alt.no.- q/nil item no- 1 & 2 t o be supplied in assembled condition, item no. 3 to be supplied in loose condition, qty= 01no. per 02 nos assembly of item 1 & 2. [ warranty period: 30 months after the date of delivery ]
Tender For shifting reinstallation dismantling furnishing and procurement of press material - shiting and reinstallation of digital production machine pro c9110 pro c7110x and pro 8200s , three phase electric fitting of digital section along with all other accessories required along with shifting and reinstallation of 2 number of split ac 1.5 ton , shifting and reinstallation of ups batteries , dismantling of wooden cabinets of urdu dtp section , repair and renovation of aluminium ply board cabinet for digital production machine pro-8300s , furnishing of aluminium partition in new digital section and camera section for ctcp machine and digital machines , wire o wire double of size 16mm , wire o wire double 08mm , hanger 12.5 inch , paper cloth width of 1m , pre gum sheet 80 gsm size 12 inch x 18 inch