Web Analytics Made Easy - StatCounter

Framing Machine Tenders

Get complete information related to latest Framing Machine Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Framing Machine Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Framing Machine Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :39123365 Due date: 11 Feb, 202511 Feb, 2025 11.68 Lacs
Tender For supply installation fixing testing and dosing tank repairs to machinery along with repairs to hoist assembly for handling wtp chemicals at 40mld water treatment plant podocem

corporations/Associations/Others

CTN :39110959 Due date: 30 Jan, 202530 Jan, 2025 NA
Tender For auction sale of plant and machinery items

corporations/Associations/Others

CTN :39110970 Due date: 31 Jan, 202531 Jan, 2025 NA
Tender For auction sale of plant and machinery items

corporations/Associations/Others

CTN :39110916 Due date: 19 Feb, 202519 Feb, 2025 NA
Tender For auction sale of miscellaneous iron & steel, gi, ci scrap items,miscellaneous aluminum scrap items,miscellaneous brass scrap items,miscellaneous copper scrap items,miscellaneous alloy steel scrap items,miscellaneous plant & machinery scrap,miscellaneous wood & wooden scrap items,miscellaneous containers/barrels/drums/cans scrap items,miscellaneous rubber scrap items including conveyer belts, tyres, & tubes,miscellaneous battery scrap items,miscellaneous scrap items,miscellaneous stainless steel items,miscellaneous cable scrap items,miscellaneous electrical/electronics scrap items,miscellaneous plastic scrap items,miscellaneous e-waste items

Central Government/Public Sector

CTN :38843166 Due date: 04 Feb, 202504 Feb, 2025 49.00 Lacs
Tender For corrigendum : preventive maint of plant and machinery and miscellaneous works to water installations at sec c under ge utility ambala

Central Government/Public Sector

CTN :38570967 Due date: 03 Feb, 202503 Feb, 2025 NA
Tender For corrigendum : hiring of machinery, hydra trailer with rigger helper for removal ofstructure from old plant area

Co-operative

CTN :39026047 Due date: 28 Jan, 202528 Jan, 2025 NA
Tender For insurance coverage for plant and machinery at mega dairy, chikkaballapura milk union

CTN :39087211 Due date: 04 Feb, 202504 Feb, 2025 NA
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-02 3 nos in oddanchatram block of dindigul district - name of the work : 1. upgradation of the road from veeralapatty - velur bt road km 0/0 - 1/060 (r 102)estimate amount : rs. 35.23 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 -1/060, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 -1/060, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 -1/060, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification., km 0/0 -1/060, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.., km 0/0 -1/060, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t cmp with bitumen boiler, tipper trucks,paver finisher/9m

CTN :39087284 Due date: 04 Feb, 202504 Feb, 2025 NA
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-04 3 nos in oddanchatram block of dindigul district - name of the work : 1. strengthening of the road from vadamadurai - oddanchatram road to thippampatty km 0/0 - 1/550 (r 131)estimate amount : rs. 55.40 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 -1/550, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 -1/550, picking the existing worn - out wbm / bt surface using 5 - 10 cm thick including allcost andconveyance of all materials and all labour charges etc complete, km 0/0 -1/550, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 -1/550, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification., km 0/0 -1/550, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.., km 0/0 -1/550, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roll

CTN :39087310 Due date: 04 Feb, 202504 Feb, 2025 NA
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-06- 2 nos in oddanchatram block of dindigul district - name of the work : 1. upgradation of the road from k.keeranur - kallimandayam road to perumal karadu road. km 0/0 - 0/870 (r 439)estimate amount : rs. 30.37 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 -0/870, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 -0/870, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 -0/870, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification., km 0/0 -0/870, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.., km 0/0 -0/870, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t cmp with bitumen boiler, tipp
 Loading, Please wait...

Connect us via What's Up