Web Analytics Made Easy - StatCounter

Gas Duct Tenders

Get complete information related to latest Gas Duct Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gas Duct Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gas Duct Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45063614 Due date: 23 May, 202623 May, 2026 NA
Tender For supply of 25vkoc001 c c - injector connection assly , injector holding flange assly. , pyrometric duct , expansion below , electronic governor-actuator , flex master con for dia 88.9-epdm , compensation sensor for exh.pyrometric duct , disc spring , piston ring , air valve , set of spare gasket & o rings , o ring dia 3 x dia 290 , o ring dia 3 x dia 260 , special seal , set of spares for abb vtc254 turbocharger , spare part kit for fw/sw heat exchanger , pt 100 converter with two threshold , ferquency preamplifier-engine speed , supply board , flash 64k card , communication module , pcmcia card , 16 analog input card , rtd input filed module , filed communication module , fuse 4a gg 10 38 , thermistor protection relay(aux415v ac) , injecting piping assly , set of seal for glacier filter , plug no4 , 25 cts , pyrometric duct bank b , expansion bellow , floating bush(te) , oil seal (190x160x15) , d/row sph rlr brg (100x165x52) , d/row sph rlr brg (120x180x46) , cap screw , portable temperature simulator 0-600 deg celcius , disc spring , release spring , gt2 coalescer filter panel , seal tape roll , barring gear assly - gali , type - gd , loctite 480 , crankcase pressure measurement assly , o ring , drilled cap plug - dn 12 , connecting straub metal grip d42 4 epdm , adjusting screw , injector tappet , gasket , injection pipe , o ring , p2-p4 by pass valve-gachot-dn125 , seal ring chord , expansion bellow , metallic gasket , cartridge , v band clamping , lub oil filling connection , rubber compensator , rubber compensator g0125 x 130 x 016 hks-g nbr gr deb , rubber compensator g0100 x 130 x 016 hks-g nbr gr deb , clamping collar , expansion bellows , metallic joint , o ring an 30 , 21a7 , gasket for lub oilcooler (nopv) , channel plate gasket , engine inlet thermostic valve , o ring , disc spring washer dia.56xdia.28.5x3 , disc spring washer dia.40xdia.21.5x2 , temperature sensor , silencer pads (fx4000) , lid seal for fx4000 , hex bolt , hex bolt , time delay relay(on delay) , elelctrical connnection laptop-engine controller , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , flex hose , repair kit for gali starter , set of seal for gali starter , solenoid valve-24v , main bearing assly , gasket , gasket , o ring , gasket , seal , impeller , 2 lips oil seal , bearing , mechanical seal eagle , o ring , bearing , cap plug , injector sleeve , o rind- ms 29513/238 , v 75 e , o ring - kalrez , inlet valve guide , gasket exhaust manifod , valve seat metallic ring , inlet valve , exhaust valve , rocker arm bush , metallic joint , rocker cover screw , piston ring - top - chrome , ceramique , piston ring - compression-g3-chrome , piston , gasket , set of gasket for hyd. motor , connecting axiflex metal gripd168.3 , epdm , gasket , service tool kit for oil mist detector , exhaust temperature sensor , o ring - ms29513/230 , 60c7 , o ring an26 , 60c7 , nozzle assly -9 x 0.52 x 148 , helicoflex joint hn100 , d17.4 1.8mm , sea water pump , joint type c with limiter , metallic joint , tc speed sensor , gasket rc , o ring d54 , 50x3 v70d , o ring an29 , 21a7 , gasket , hose , metallic joint , set of spares for air valve and actuator , set of spares for p2/p4 bypass valve , actuator service kit , fresh water temp sensor (rtd) , coupling assly cw , connecting cable (unitel way) , analog input field module type 170aaio3000+slave 170fnt11001 , lamp , hooter (electronic) , power switch , fuse 10x38 2a gg , pt 100 converter with two threshold , solenoid valve-safety stop , power fuse , 32a , rsp bearing safety card , icm safety stop card (4 channel) , frequency preamplifier (engine speed) , human machine interface , main bearing temp probe , connecting rod bearing temp probe , washer bsf , ring for casing , bushing

CTN :45057581 Due date: 16 May, 202616 May, 2026 9.50 Lacs
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f

CTN :44445370 Due date: 24 Apr, 202624 Apr, 2026 NA
Tender For bid to ras supply of w10-6675-000124 board night observation mk-1 , w10- 6675-000008 compass drafting beam , z1-misc-1000073- m-0012 battery panasonic 3v , v5-6675-001488 protractor special , z1-5930-001534 switch rotary switch with long shaft , v4-bof-4135 cell electrical socket , z3-lorros mk- iv1440-0626-82 connector 3 , x2-mg19-dynaf-3-32-301-07 cable duct 30 x 15 l equal 270 qty-2 l equal , w8-iwh- acb-9232-1900-51 gas duct valve , z1-5961-006534 transistor type t-304 , z1-5950-040191 coil radio freq point 25uh 100v dc , v4-5310-003079 washer flat sliding , v4-5360-000701 spring helical compression , v4-5315- 001724 key ob-4344 , v4-5330-002378 gasket synthetic rubber ob-6848 , v4-5360-000702 spring helical compression , v4-1240-720251632 mirror manganin gb- 1412 , v4-1240-001014 lens cylinder optical instrument gr-50 , v4-5970-000646 insulator feed through ob-4137 , v4-5310-003081 nut plain hexagonal m5 brass special , v4- 5330-002372 seal rubber round section 6 point 75 dia x 1 7

State Government

CTN :44951516 Due date: 04 May, 202604 May, 2026 NA
Tender For procurement of bracing pipes/ internal supports of various sizes for flue gas ducts for unit # 7 coh at cstps chandrapur

State Government

CTN :44955759 Due date: 30 Apr, 202630 Apr, 2026 NA
Tender For work of repair of flue gas duct from esp inlet & outlet to stack inlet duct during coh of unit # 7 at cstps, chandrapur

State Government

CTN :44946558 Due date: 08 May, 202608 May, 2026 3.78 Lacs
Tender For ktps-v stage -bm-bending, fabrication and erection of the damaged / worn-out portion /replacement of guide vanes for flue gas ducts of unit-x during overhaul of 2026-27.-reg

State Government

CTN :44936153 Due date: 08 May, 202608 May, 2026 4.42 Lacs
Tender For ktps-v stage -bm-patch welding to be done for rectification of damaged flue gas duct from aph a hopper to chimney along the path ab side flue gas duct and its honeycomb structure (a and b) after dismantling the damaged worn-out portion of flue gas ducts for overhaul of unit-x in 2026-27.

State Government

CTN :44936154 Due date: 08 May, 202608 May, 2026 4.21 Lacs
Tender For ktps-v stage -bm-patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimney along the path cd side flue gas duct and its honeycomb structure (c and d)after dismantling the damaged worn-out portion of flue gas ducts for overhaul of unit-x.

CTN :44937999 Due date: 27 Apr, 202627 Apr, 2026 14.29 Lacs
Tender For repairs of flue gas duct (aph outlet and to esp inlet) at the boiler of unit- 1 including t@p and consumables during the running and annual overhaul period 2026-27
 Loading, Please wait...

Connect us via What's Up