Tender For operation and maintenance of rising main (pipe line (hdpe pe-80) of barasukjora water supply scheme within (binpur-ii) block within jhargram sub-division under jhargram division, phe dte. for 12 months.
Tender For operation and maintenance of distribution system (zone-i) pipe line (ci/di/hdpe/upvc) and f.h.t.c. with all related structure i.e. ohr of barasukjora water supply scheme within (binpur-ii) block within jhargram sub-division under jhargram division,
Tender For operation and maintenance of distribution system (zone-ii) pipe line (ci/di/hdpe/upvc) and f.h.t.c. with all related structure i.e. ohr of barasukjora water supply scheme within (binpur-ii) block within jhargram sub-division under jhargram division,
Tender For laying and fitting of pipe line for re-alignment of old water supply line of kusar sankoo (under re-activation of various wss in the district under capex budget).
Tender For repair/restoration of damaged infrastructure of drinking water scheme under ampi rd block, gomati district/sh- renovation of 08 (eight) nos. semi-permanent pump house, pipe line maintenance and other allied work etc. at gandhek molsom para, garjan para,sert
Tender For repair/restoration of damaged infrastructure of drinking water scheme under ampi rd block, gomati district/sh- renovation of 08 (eight) nos. semi-permanent pump house, pipe line maintenance and other allied work etc. at gamaku para, dhalacherra, 3no. sonach
Tender For running maintenance of rws scheme at karbook /s,h-extention of pvc pipe line in/c. construction of temporary pvc hydrant for providing water supply arrangement at various habitation,school, awc etc.at mukhchari v/c and new gomati v/c in/c.tirthamukhmela
Tender For corrigendum : -repair and overhauling service - as per bid document; as per bid document; yes; buyer premises; renovation & repair work of kiln-1 supply and fitting three phase wire connecting the main panel and three phase electric motor. 01 length as per requirement. 2 supply,fitting and wiring of - (i)isolator 01 (ii) mcb s seprate for each electric equipment. as per reqirement (iii) motor starter 01 (iv) pid s for temperature and humidity sensors etc. 01 each (v) switch for changing the direction of three phase motor. 01 contector setup 3 repairing and servicing of there phase 7hp motor. 01 4 supply and fitting with wiring of 2-3 kw electric finned heaters inside the kiln. 10 5 supply and fitting of heat/ humidity proof light in the kiln. 04 6 supply and fitting of heat and humidity sensors in the kiln 02 each 7 repairing of humidifier. 01 8 supply and fitting of wall mounted fans with its wiring. 06 9 supply and fitting of led tube lights with its wiring. 06 10 supply and fitting of doors with door frame 02 11 supply and fitting of water pipe line connecting humidifier to the water tank. 01 length as per requirement.