Get complete information related to latest Gear Case Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gear Case Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gear Case Scrap Tenders.
Tender For strengthening of e/m equipment of various tube wells installed at sarai kale khan area under jangpura constituency ac-41. - supply of double flange gi column pipe 50 mm dia medium class each of 3 mtrs long duly threaded on both ends, welded fitted with gi flange on both ends and welded support l-type ms bracket in both flange with slot of submersible cable.make: tata/ jindal. , supply of out door type 7.5 to 10hp hut type electrical feeder pillar/metal board of weldedconstruction of size 1370mm x 760mm x 460mmfabricated with 16 swg m.s. sheet with horizontal and vertical intermediate chamber of suitable size onsuitable size insulating board to make the panel robust, having double door with 14 swg s.s hinges along with double locking arrangement with arrangement for mounting of switch gear and electrical energy meter i/c powder coating, vermin proof having following items.1. mccb 63 amp, 4 pole-1 no2. rccb/elcb 63 amp, 4 pole with earth fault indicator and positive contact indication protecting a circuit automatically 1no3. fully automatic star delta starter of 10hp, 3phase oil immersed type 1no4. digital ampere meter 96mmx96mm square shape of 0-30 amp range 1no5. digital voltmeter of 96mm x 96 mm square shape of 0-500 volt range with selector switch 1no6. led indicating lamps with fitting (a set of 3 lamps) 1set7. shunt capacitor of 5 kvar with three phase isolator 1no8. motor protection assembly having earth leakage protection, phase sequence corrector, single phasing protection, over load protection, high voltage-low voltage protection. 1no9. programmable time switch (i.e. ryb phase & facility to change over from automatic to manual & vice versa) up to 10 h.p.1no10. complete wiring of panel board & installation of electrical accessories in the panel with required copper conductor wire & thimbling etc.as required. the panel board shall be mounted on the base frame of 600mm height made of 50x50x6mm angle iron frame.make:-all the insert used in panel must be of djb approved makes and should be isi marked where make of that equipment is not approved.djb item code 10.2.1, supply of pvc insulated pvc sheathed copper conductor flat cable size 3 core x 4sq mm,1100 volts, confirming to is 694(each roll 100mtr long). make: granlay / havells./gloster/any djb approved make., supply of nut bolts, washer 1/2 dia 1 long full threaded., supply of rubber packing 50 mm dia. flange., lowering & lifting of sub/sets from bore by taking out double flanged gl pipes, submersible p/set, cable, cutting of rusted nuts and bolts etc and replacement of damaged d/f gi pipes, cable, defective pump set etc as per site requirement and lowering of sub p/set, sub cable, gl pipe etc as required, jointing of cable from sub p/set along with holding of cable with pipes and jointing of d/f pipes etc with nuts bolts and rubber packing etc. the job includes hiring of all t&p, tripod stand, chain pulley block and other material handling equipments, safety gadgets ad required and consumable material will be arranged by the firm as per site requirement. the other material required during execution will be provided by department. djb sor(e&m)-2022 item code 27.1.2
Tender For supply of self assy tata,field coil tc tow four volt,corbon bush plate assy,bush holder,cabin light assy,front indicator asy,combination switch tow point five ton,tail light glass,convoy light assy,wiper motor two point five ton,reserve switch,bty cut off switch,alt assy seven one five tc,temp sending unit,oil sending unit twon point five ton,fog light assy two point five ton,fog light bulb two fourw,guage bulb fow fourw threev,exhaust brake assy,main shaft gear box to tfr case,ge4ar lever repair kit tata,vane pump,air compressor,radiator assy,door regulator,tie rod,steering pump
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pump repair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pump repair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr