Web Analytics Made Easy - StatCounter

Gravel Item Tenders

Get complete information related to latest Gravel Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gravel Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gravel Item Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Corporations/Associations/Others

CTN :39748486 Due date: 25 Mar, 202525 Mar, 2025 NA
Tender For to provide jcb and poklen machine on hourly rent basis for pwd works at sangamner municipal council - brooming the w.b.m. surface by wire brushes,coirbrushers,dusting,cleaningetc. for receiving the bituminous treatment complete. brooming the water bound macadam surface by wire., tractor, static road roller 8 mt, extra labour for loading and unloading material from tractor and other machinery mazdoor - unskilled heavy male, excavator (jcb js 80 ), excavator (poclain) (tata hitachi ex120 )

State Government

CTN :39709344 Due date: 25 Mar, 202525 Mar, 2025 74.98 Lacs
Tender For corrigendum : sh formation cutting and p/l g.sb. , w.m.m., bitumen macadam and bituminous concrete in km. 0/000 to 2/500

CTN :39740241 Due date: 07 Apr, 202507 Apr, 2025 1.76 Crore
Tender For strengthening with wbm plus 50mm bm plus 20mm pc and relaying of ccb strengthening with wbm plus 50mm bm plus 20mm pc and relaying of ccb - [10.33.1]providing and laying of brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: 1. 1:4 (1 cement : 4 coarse sand) [through rate], [10.8]providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [through rate], [11.25.2]pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. raised and cut pointing [through rate], [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [through rate], [11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) [through rate], [11.61.1]white washing with lime to give an even shade : 1. new work (three or more coats) [through rate], [14.23.1]cement pointing 1:2 on lining 1. in bed. [through rate], [17.15.1]granular sub-base with coarse graded material - grading-i or ii or iii (table:- 400-2) construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of mortandh specifications 1. grading i material [through rate], [17.22.2]water bound macadam gr i 2. water bound macadam grading i with screening type a providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of mort&h specifications [through rate], [17.23.2]water bound macadam grading - ii 2. water bound macadam (53mm to 22.4 mm)grading ii with screenings type b (11.2 mm aggregates) providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of mort&h specifications [through rate], [17.25.1]prime coat @ 0.85kg per sqm 1. prime coat @ 0.60kg per sqm providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of mort&h specifications [through rate], [17.26.2]tack coat 2. providing and applying tack coat with penetration grade bitumen vg - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of mort&h specifications [through rate], [17.33.1]open - graded premix surfacing 20 mm thickness 1. providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of crushed stone aggregates of specified grading premixed in a continuous type of hot mix plant of appropriate capacity not less not less than 75 tonne per hour, with bituminous binder vg - 10 @ 1.46 kg per sqm, laid with paver finisher mechanical and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades complete as per technical clause 510 of mort&h specifications. [through rate], [17.36.3]seal coat 3. type b with vg - 10 bituminous binder providi

Central Government/Public Sector

CTN :39685994 Due date: 26 Mar, 202526 Mar, 2025 3.68 Crore
Tender For resurfacing of roads inside csl using two layer bitumen overlay consisting of one layer of dense bituminous macadam and one layer of bituminous concrete.

CTN :39512568 Due date: 21 Mar, 202521 Mar, 2025 NA
Tender For construction of synthetic athletics track - synthetic athletic track normal stress area , synthetic athletic track high stress area , sand filling in jumping pits , earth work , cover laying pipes, cables etc , filling available excavated earth , concrete work , steel centering and shuttering , steel work , drainage work , brick work , finishing , finishing neat cement punning , road work , spreading and compacting specified grade granular sub base , wet mix macadam , tack coat , bitumen surface , laying bituminous macadam , llaying dense bituminous concrete , thick cement concrete slab , providing and fixing concrete kerb stones , weedicide over the prepared subgrade , long and triple jump trough casing aluminium , long and triple jump take off board , long and triple jump blanking board , long and triple jump stencils , long and triple jump control strips , long and triple jump plasticine , long and triple jump training strips , water jump hurdles , high jump landing base , high jump pit with uprights and cross bar , hammer cum discuss ring with cage , shot put ring , shot put board , pole vault box with cover, uprights cross bar and landing area , pole vault boxes , cover for pole vault boxes , take off tray , dummy board with synthetic top , aluminum kerbing , sand pit , chain link fencing , centering and shuttering , providing and laying in position cement concrete , reinforced cement concrete , structural steel work riveted , painting with synthetic enamel paint , providing and fixing g.i. chain link , flood lighting
 Loading, Please wait...

Connect us via What's Up