Web Analytics Made Easy - StatCounter

Grill Frame Tenders

Get complete information related to latest Grill Frame Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Grill Frame Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Grill Frame Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :42960498 Due date: 26 Dec, 202526 Dec, 2025 NA
Tender For corrigendum : a)csmt-repairs to damaged panels, flse ceiling, flooring, door & window grill at 5th floor of new annex building at csmt mumbai. b)bp- officers quarter safety related work in 5 cuffe parade in badhwar park. c)csmt-renovation of dy.cmm/etl,amm/sales and provision of recreation center & staff seating areanin pcmm office, nab building at csmt,mumbai.

Central Government/Public Sector

CTN :43119755 Due date: 26 Dec, 202526 Dec, 2025 NA
Tender For a)csmt-repairs to damaged panels, flse ceiling, flooring, door & window grill at 5th floor of new annex building at csmt mumbai. b)bp- officers quarter safety related work in 5 cuffe parade in badhwar park. c)csmt-renovation of dy.cmm/etl,amm/sales and provision of recreation center & staff seating areanin pcmm office, nab building at csmt,mumbai.

CTN :43109226 Due date: 18 Dec, 202518 Dec, 2025 8.07 Lacs
Tender For comprehensive development like waterproofing of roof, painting, repairs to all the toilets, painting, plumbing works, grill work and other civil alled works for bbmp building at 8th main, mathikere in ward no-54 (old-36), mathikere

CTN :43118111 Due date: 18 Dec, 202518 Dec, 2025 26.59 Lacs
Tender For a/r & m/o to residential quarters at narkeldanga during 2025-26. sh: providing & fixing grill gate, nylon mess & day to day complaints from carpentry work etc.subwork/packages:providing & fixing grill gate, nylon mess & day to day complaints from carpentry work etc.

CTN :43118182 Due date: 23 Dec, 202523 Dec, 2025 1.85 Crore
Tender For consultancy services for preparation of detailed project report including designing for construction of 3 nos. bridge including grill/drop gate at different locations (gin-87, gin-88, gin-90) and construction of 13 nos. grill/drop gate at different locations (gin-83-a, gin-101-b, gin-101-d, gin-101-f, gin-101-g, gin-101-h, gin-101-j, gin-101-k, bp. no. 203/3-s to 203/4-5, bp. no. 203/6-r to 203/5-s, bp. no. 218/1-s to 218/1-s, bp. no. 219/mp to 219/mp & bp. no. 219/10-r to 219/12-r) in malda & murshidabad district and construction of 1 no. grill/ drop gate at gin-44-a in nadia district of west bengal sector along indo-bangladesh border roads (ibb).subwork/packages:same as name of work

CTN :43118200 Due date: 16 Dec, 202516 Dec, 2025 5.69 Lacs
Tender For repair and painting work of backside of ertl main building including fixing of window grill, leveling and development of backside surface etc. of ertl, sector-v, salt lake, kolkata during 2024-2025. sh balance work.subwork/packages:sh balance work.

corporations/Associations/Others

CTN :43072725 Due date: 20 Dec, 202520 Dec, 2025 NA
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pump repair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr

corporations/Associations/Others

CTN :43072764 Due date: 20 Dec, 202520 Dec, 2025 NA
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pump repair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr

State Government

CTN :42729178 Due date: 07 Jan, 202607 Jan, 2026 1.00 Lacs
Tender For corrigendum : repairing work (toilet window grill and door lock,handwash platform,kitchen required) at santra east -1 awc under ramnagar - i dev. block

State Government

CTN :42729291 Due date: 07 Jan, 202607 Jan, 2026 2.00 Lacs
Tender For corrigendum : repairing work (toilet floor and door ,window grill, handwash platform) hinari awc under ramnagar - i dev. block - repairing work (toilet floor and door ,window grill, handwash platform) hinari awc under ramnagar - i dev. block.
 Loading, Please wait...

Connect us via What's Up