Tender For corrigendum : repairing by pressure grouting of track hopper to arrest water seepage and grouting of two nos. clariffloculator rail new water treatment plant including repair of rcc periphery drain including development of its surrounding area inside power house.
Tender For btps - chp - engaging of 02no back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler-1,2 and on track hopper-1a,1b grid for facilitating further unloading of coal tipper and also for removal of spilled over coal while unloading of coal trucks pouring back the same into the respective grids and also for clearing the chain conveyor jams at contingency arrangement-1,2 on round the clock basis for arraigning uninterrupted coal feeding to the units-1,2,3,4 of btps for the period of 45 days from 01.04.2025 or from actual date of commencement of work
Tender For corrigendum : at bihara: supply of machine crushed track ballast (by direct loading into wagons) conforming to rdso specification (irs-ge-1) with latest correction slips at bihara (bhz) railway depot including loading into hopper/wagon/truck and unloading & spreading in the section of cne-bpb-scl (18.30 km), arcl-jrbm (41.40 km) & ktx-bhrb (50.20 km) (total=109.90 km) in connection with balance work of through ballast recoupment (tbr) under the jurisdiction of aden/bpg.
Tender For corrigendum : btps - chp - checking of all chute and flap gates from track hopper complex to crusher house in operation and electrical maintenance division of chp/btps for the period from 01.04.2025 or actual date of commencement of work to 31.03.2026