Get complete information related to latest Hvac Pump Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hvac Pump Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hvac Pump Repair Tenders.
Tender For auction sale of buffer tank (hvac processed chilled water tank),process chilled water circulation pump 1,process chilled water circulation pump 2,process chilled water circulation pump 3,vam chiller 1
Tender For corrigendum : procurement of soft starters for governor oil motors, drainage, dewatering motors, technical water pumps and chilled water pump motors as spares in the power house, pjhes, revulapally.
Tender For tender for supply of operation of water cooled centralised ac plant of 3x330 tr trane make and all associated ancillary equipments and ventilation fans etc. round the clock in 3 shifts on all days iincluding sundays and holidays by deputing supervisor , shift in-charge or skilled , semi skilled manpower etc. complete as required and as per enclosed detailed specifications. for first year , operation of water cooled centralised ac plant of 3x330 tr trane make and all associated ancillary equipments and ventilation fans etc. round the clock in 3 shifts on all days including sundays and holidays by deputing supervisor , shift in-charge or skilled , semi skilled manpower etc. complete as required and as per enclosed detailed specifications.for second year , comprehensive maintenance contract for the centralized air-conditioning system consists of 330tr water cooled chiller units (trane make)-03 nos. , chilled water pumps primary pumps (kirlosakar make)-3 nos. and secondary pump (grundfoss make)- 3 nos. with vfd drive panel , condenser water pumps (crompton make) - 3 nos. , cooling towers (advance make)-3 nos. , chilled water and condenser water lines , air handling units (floor mounted and ceiling suspended) (zeco make) with starter panels - 27 nos. power and control panels and its associated equipments like bearings , v-belts , canvas , valves (excluding the butterfly valves) , strainers , dampers , diffusers , grills , nozzles , thermostats , switchgears in control panels(excluding the power cables) , ventialation fans of toilets , electrical meters , contactors , timers etc. complete as required for smooth operation of the complete hvac system. the scope of work also includes carrying out the periodical maintenance/checking of the above equipments & maintenance of water softening plants along with supply of salt for operation as per manufacturers recommendations and/or as per the attached technical conditions. for first year , comprehensive maintenance contract for the centralized air-conditioning system consists of 330tr water cooled chiller units (trane make)-03 nos. , chilled water pumps primary pumps (kirlosakar make)-3 nos. and secondary pump (grundfoss make)- 3 nos. with vfd drive panel , condenser water pumps (crompton make) - 3 nos. , cooling towers (advance make)-3 nos. , chilled water and condenser water lines , air handling units (floor mounted and ceiling suspended) (zeco make) with starter panels - 27 nos. power and control panels and its associated equipments like bearings , v-belts , canvas , valves (excluding the butterfly valves) , strainers , dampers , diffusers , grills , nozzles , thermostats , switchgears in control panels(excluding the power cables) , ventialation fans of toilets , electrical meters , contactors , timers etc. complete as required for smooth operation of the complete hvac system. the scope of work also includes carrying out the periodical maintenance/checking of the above equipments & maintenance of water softening plants along with supply of salt for operation as per manufacturers recommendations and/or as per the attached technical conditions. for second year , painting of hvac system such as pumps , cooling tower- motors , pedastal and other equipments by removal of corrosion with sand paper and painting with corrosion resistant paint to match the adjoining areas for maintaining the equipment in good and non rusting condition. for first year , painting of hvac system such as pumps , cooling tower- motors , pedastal and other equipments by removal of corrosion with sand paper and painting with corrosion resistant paint to match the adjoining areas for maintaining the equipment in good and non rusting condition. for second year , repairing damaged insulation of exposed ac ducts by scrapping and cleaning the surface , applying cold bitumin or adhesives , supplying and fixing of 50mm thick thermo coal sheet (eps) and wraped canvas clothes with suitable self adhesive as per the specif