Tender For bid to ras corrigendum : supply of fabrication and supply of complete structure of svl tower 12 mtr including all necessary fittings fixtures alongwith foundation bolt base plate as per ts , portable inverter generator with 5.5 kva rated output and 7 kva , lifting beam alongwith lifting hook for minimum lifting capacity 300kg , toughened glass16mm to protect the camera , ms plate for landing at the top of the tower 10mm thick , galvalume sheet of size 6 ft x 1 mtr , pvc conduit pipe 40mm dia , cement opc 43 grade packed in hdpe bag each 50 kg wt conforming to is 8112 1989 , sand coarse confirming to is-383-9702 as per ts , crushed stone aggregate 20 mm graded , crushed stone aggregate 40 mm graded , crushed stone aggregate 40 to 63 mm graded , mild steel bar of size 10mm dia and above conforming to is 432 , mild steel bar of size 6 to 8mm dia conforming to is 432 , quick setting compound , ms binding wire , wooden planks for shuttering iine class wood of size 3.00 x 0.30 x 0.026m , connected store as per final design
Tender For corrigendum : complete machining of stator lifting beam centre assy 1 nos as per pqr hgg01/2025 and drg 12515112712 rev-00 and lifting beam arm assy-12 nos as per drg 12515112714 rev00. total f/m wt 109939 kg/set, repair and maintenance wt 112930 kg/set.scrap generated 2991 kg/s
Tender For enquiry for work contract for servicing, leveling and alignment of rope drums with respect to lifting beam of 20 ton gantry crane at sirmour.
Tender For corrigendum : supply of section formats and trolleys - section-1 format , section-2 front format , section-2 rear format , section-3 format , section-4 format , section-5 format , section-5 rear format , formats for article handling , rocket motor wooden format , section-1 lifting tilting fixture , section-1 assembly fixture , j beam , equipment trolley for section 1 , equipment trolley for section 2 , equipemnt trolly for section 3 , equipment trolly for section 5 , front pulling fixture , rear pulling fixture
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu
Tender For corrigendum : supply of prototype telescopic boom crane complete with match truck/wagon and all accessories such as lifting beam of 120 t capacity and light weight polyester slings, steel wire ropes, chains & tools (scope as per clause 1.2.3 of rdso specification, as detailed at clause 3.1. 1, 3.2 & 3.5 respectively of rdso specification) inclusive of any other accessory/ equipment, which the manufacturer considers essential to ma ke the crane fully operational. (list of items with their individual costs to be enclosed in the price bid) [ warranty period: 78 months after the date of delivery ]