Web Analytics Made Easy - StatCounter

Hydraulic Hoist Scrap Tenders

Get complete information related to latest Hydraulic Hoist Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hydraulic Hoist Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hydraulic Hoist Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government And Public Sector

CTN :44804249 Due date: 21 Apr, 202621 Apr, 2026 29.63 Lacs
Tender For for the providing of building materials and execution the work under the work emergency repairs of the structures at the group of monuments, hauz khas, new delhi - material and work, un slacked lime (air tight packing/bass), river coarse sand free from clay, dust, foreign materials, surkhi of 1st class bricks free from clay, dust, foreign materials, belgiri dry, gur/ sheera (air tight packing/bass), gum, san, brick agg. (20 to 25 mm n/s)graded form, brick aggregate (10 to 20mm n/s) graded form, cr stone as per site incharge or site requirement, dq stone as per site incharge or site requirement, brickzira graded form, lakhori brick required size and shape, sun jute, pvc bucket standard size, pvc mug standard size, pvc water tank 500 liters isi marked, pvc pan (tasla), green net, pvc gum boot, pvc pipe 1.5" isi marked, work in progress board with ms angle iron 25x25x5 mm with 1mm ms sheet in both side of writing in hindi & english etc complete, pvc helmet for labour isi marked, safety jacket for labour isi marked, safety belt isi marked, pvc drum 200ltr, tell -tale as per site required, copper dowels (size 6inch), araldite standard epoxy adhesive (resin 1kg + hardener 800g), provision for photo documentation of conservation work before, during & after the execution of work in proper album two set, structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete., providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron y shaped placed 2.4m or 3.00 m apart and with 9 horizontal r.b.t. reinforced barbed wire, stud tied with g.i. staples and g.i. clips to retain horizontal, including necessary bolts or g.i. barbed wire tied to angle iron, all complete as per direction of engineer-in-charge, with reinforced barbed tape(r.b.t.) / spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq. mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of m.s. angle, c.c. blocks shall be paid separately){m}, earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge., demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of engineer- in-charge, dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead dismantling old lime plaster, disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge., "providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia m.s. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with m.s. tubes, m.s. tube challis, m.s. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. the scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety feat

corporations/Associations/Others

CTN :44467320 Due date: 02 Apr, 202602 Apr, 2026 17.21 Lacs
Tender For corrigendum : maint of rota side wagon tippler e e -repl of main rails and raising of rails , tightening, repl. of all bolts, clits , repl,re fixing of bushes , repl of spur gear assembly , repl of rack pinion , oh of reduction gear box , replacement of sector gear , alignment, grouting of tippling base rollers , repl,repairing of hopper grill , alignment of tipplers , repl,repairing of outboard stool , dismantling,repl of top pivot housing , repl of wooden block , matching of teeth of sector gear , re-fixing lock lever , repl of top stop locking gears assly , side beam fixing of tippler , alignment of motors of wagon tippler , servicing of spray line valve size 4 inch , servicing of spray line valve size 3 inch , servicing of spray line valve size 2 inch , oh of overhead spray pumps , servicing of spray nozzles , lifting, proper fixing of vf tray , changing, fixing of side packing , to provide the patches , repl of plates of vf tray, chutes , removal of foreign , fillings oil in gear box , servocoating,tightening, repl of damaged bolts , greasing of all the nipple point , repl of break shoe liner , repl of main rail beam of wagon tippler , provision of backup in main rail beam , work on central platform , repairing of main rail beam , repairing of rollers of coal spill plates , fab, erection of back support of vf mouth chute , fab., installing of vf tray supports , repl of coal spill plate , repairing of pit platform of main rail beam , repl of damaged beam of vf , repairing of counter balance beam , repairing of mdu base structure , repairing of damaged split spur gear , fab., of mouth piece of vf , erection of new fabricated mouth piece of vf , oh of hoisting system , oh of hopper spray pump, line , provision of hopper liners, in coal hopper of vf , fab. erection of coal hopper partition stool , raising and re-fixing of mouth piece of coal liner chute of vf , repl of back,side plate of mouth piece , to attend the coal leakage from top mouth piece , re-fixing,repositioning of side and back supports , repairing,reposition of side guards of mouth piece , repl of buffer block and buffer pads of counter balance beam , repl of brake drum of thruster brake assly , repl of input,output,intermediate pinion of gear box , fab. and erection of counter balance beam , repairing of wagon tippler plate form by cutting and welding , removing the fallen loaded wagon in pit , inserting the side beam pins in bracket , dismantling,removing the broken shafts of wagon tippler , installation of drive and adjacent intermediate shaft , cutting, fabricated and installation of resting outer rail beam bottom plate
 Loading, Please wait...

Connect us via What's Up