Tender For upgradation augmentation of shot blasting equipment and shot blasting room including replacement of three motor driven screw lp air compressor for upgradation augmentation of production shop floor (ab and ac bay) at ins eksila - upgradation/ augmentation of shot blasting equipment and shot blasting room including replacement lp air compressor as indicated in part-ii of rfp consists of the following:-, dismantling and degutting of lp air compressors along with all associated equipments and shifting work as specifiied in para 1(1.1)(a) part ii of rfp., lp air compressor, lp air compressor as specifiied in para 3 (3.1) part ii of rfp., dryer unit as specifiied in para 3 (3.1) part ii of rfp., air receiver tank (2000 liters) as specifiied in para 3 (3.1) part ii of rfp., air filter as specifiied in para 3 (3.1) part ii of rfp., acoustic canopy as specifiied in para 4 (4.1)(a) & (b) part ii of rfp., electric power distribution board/ control panel as specifiied in para 4 (4.1)(d) part ii of rfp., dismantling and degutting of shot blasting system along with all associated equipments and shifting work as specifiied in para 1.2 of part ii of rfp., shot blasting system, protection liner & rubber lining as specifiied in para 3(3.2) part ii of rfp., recovery unit as specifiied in para 3(3.2) part ii of rfp., dust collector & exhaust system as specifiied in para 3(3.2) part ii of rfp., shot blasting unit as specifiied in para 3(3.2) part ii of rfp., all other items associated with main eqipment which are mentioned in part ii of rfp [ex para 6(a) & 6(b) etc] part ii of rfp)., civil work for (refers to para 8 of part ii of rfp)., standard accessories (refers to para 9 of part ii of rfp), two years operation & maintenance spares (refers to para 10 of part ii of rfp), special maintenance tools and test equipment (refers to para 11 of part ii of rfp), technical literature / certificates / documentation (refers to para 13 of part ii of rfp), acceptance, testing, trials and commissioning charges (refers to para 14 of part ii of rfp), training (refers to para 16 of part ii of rfp), any other item such as transportation, insurance, freight, packing etc, notes:1. cost of item listed at sl 1 to 12 and 13 (if applicable) are to be quoted in the respective rows of the price bid sheet. 2. bidder not permitted to include cost of items listed at sl 6 to 13 with sl 1 to 5 as lumpsum amount 3. bidder required to mandatorily quote for sl 1 to 5 and 12 failing which bid shall be treated as non bonafide and liable for rejection.4. bidders are mandatorily to quote gst/ taxes as applicable against each serials, falling which bid shall be treated as non bonafide and liable for rejection.
Tender For corrigendum : augmentation of power supply system in n-s corridor,up gradation of negative isolators & dc negative cables in tunnel section from kdmi to kmuk, renovation of kmuk car shed,provision of ets and other related works in north south corridor, automatic short circuiting between 3rd rail and running rail, replacement of old isolator by motor operated isolator, replacement of overaged isolators of noapara depot & kkvs depot,unit protection of rectifier at dum dum tss, rabindra sarobar tss & park street tss, augmentation of power supply system at substations from kshy to kcen & provision of cctv in electrical substations of north south corridor in metro railway kolkata
Tender For augmentation of power supply system with replacement of over head lines by abc (ariel bunch conductor) conductors in fazalganj,tejab mill colonies of kanpur area.
Tender For at kyq -augmentation of power supply distribution system at kyq coaching depot. (ii) provision of dedicated diesel generator set at ghy coaching depot.