Get complete information related to latest Industrial Paint Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Industrial Paint Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Industrial Paint Tenders.
Tender For supply of enamel, synthetic, exterior (a) under coating (b) finishing paint (v3) confirming to is 2932 (q3) , paper adhesive, liquid gum and office paste type as per is 2257 (rev) (q3)
Tender For paint synthetic enamel black exterior for finishing as per is:8662/2004 packed in 20 ltrs non returnable steel drum. shelf life minimum 11 months on the date receipt of supply at plw/patiala [ warranty period: 11 months after the date of delivery ]
Tender For supply of enamel, synthetic, exterior (a) under coating (b) finishing paint (v3) confirming to is 2932 (q3) , ready mixed paint, air drying, red oxide - zinc phosphate, priming as per is 12744 (q3)
Tender For supply of enamel, synthetic, exterior (a) under coating (b) finishing paint (v3) confirming to is 2932 (q3) , thinner for epoxy paints (bhel) (q3) , flat brushes for paints and varnishes for heavy duty as per is 384 (part 1) (q3)
Tender For supply of synthetic enamel exterior finishing paint to specn.is:8662-2004, colour : gol den yellow to shade no:isc:356 of is:5-2007.and icf/md/spec-045 issue status-02,rev-03,rds o amd-01,addendum to annexure v and rdso amd-01 as an additional requirements of icf- md-spec-045. [ warranty period: 30 months after the date of delivery ]
Tender For paint enamel synthetic brushing finishing exterior black (packing in 20 ltrs new non retu rnable m.s. drum) "this is shelf life items and should be procured with staggered delivery period . supp lier to mention/print date of manufacturing on the item & item to be supplied within 60 days of manufa cture date." specn: is: 8662/2004 with additional requirement stipulated in icf specification no. icf/m/ d/spec 045 issue status 02 revision 03 except clause c3 of is: 8662/2004 the date of supply of the mat erial should b [ warranty period: 30 months after the date of delivery ]