Get complete information related to latest Inlet Channel Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Inlet Channel Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Inlet Channel Tenders.
Tender For mgnrega re e tender fy 2025-26 - 0295 stone aggregate(single size):20 mm nominal size, 0297 stone aggregate(single size): 10 mm nominal size, 0982 coarse sand (zone iii), 0367 portland cement, 0002 hire charges of concrete mixer 0.25 to 0.40 cum with hopper, 0012 vibrator (needle type 40 mm), 7319 wall form panel 1250x500 mm, 7326 corner angle 45x45x5 mm 1.50 m long, 7327 100 mm channel shoulder 2.5 m long, 7328 double clip (bridge clip), 7329 single clip, 7330 m.s. tube 40 mm dia, 4009 mild steel tubes hot finished welded type, 1215 welding by electric plant, mr113 galvanised wire mesh of average width of aperture 1.4 and nominal dia. of wire 0.63 mm, 1219 wire nails, 1023 galvanised steel j or l hooks 8 mm dia, 1208 bitumen washer, 1209 g.i. plain washer thick, mr186 precoated aluminium trafford sheet 0.450mm thick, 0293 stone aggregate(single size):40 mm nominal size, mr2 solid block masonry of size 30x30x20cm, 1005 twisted steel bars/deformed bars, mr52 pvc pipe 75mm outer dia 6kgf/cm2, mr53 pvc pipe 75mm outer dia 4kgf/cm2, mr70 pvc bend 75mm dia
Tender For execution of contract for supply works and other works in panagudi section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to site
Tender For execution of contract for supply works and other works in ittamozhy section - normal ground- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, normal ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, rocky ground (medium)- excavation of pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, rocky ground- erection of 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles, hard rock requiring blasting and chisseling- erection of 7.32m, 7.5m, 8m, 8.23m poles, normal ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, normal ground- erection of 9m & 9.14m poles, rocky ground- excavation of pole pits (1.25m * 0.6m*1.83m) for 9m & 9.14m poles, rocky ground- erection of 9m & 9.14m poles, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 9m & 9.14m poles, hard rock requiring blasting and chisseling- erection of 9m & 9.14m poles, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, normal ground- erection of above 9.14m poles & 36 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for above 9.14m poles & 36 length rs joists, rocky ground- erection of above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14m poles & 36 length rs joists, hard rock requiring blasting and chisseling- erection of above 9.14m poles & 36 length rs joists, normal ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, normal ground- erection of 42 length rs joists, rocky ground- excavation of pole pits (1.25m * 0.6m*2.19m) for 42 length rs joists, rocky ground- erection of 42 length rs joists, hard rock requiring blasting and chisseling- excavation of pole pit (1.25m * 0.5m*1.5m) for 42 length rs joists, hard rock requiring blasting and chisseling- erection of 42 length rs joists, transporting of poles from road side to pole pit upto 2km - 7.32m, 7.5m, 8m, 8.23m rcc pole, transporting of poles from road side to pole pit upto 2km- 9m, 9.14m rcc/psc pole, transporting of poles from road side to pole pit upto 2km - rsj 36 pole, transporting of poles from road side to pole pit - rsj 42 and above, loading and unloading of poles - 7.32m, 7.5m, 8m, 8.23m rcc pole, loading and unloading of poles - 9m, 9.14m rcc/psc pole, loading and unloading of poles - rs joists, tubular & rail pole (above 9.14m), concreting of poles as per board standards (2*2*5). the materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing transporting of sant,jally,from box and water curing for 14 days etc,.complete), coping of pole (0.6m*0.6m*0.35m), concreting of stay (o.3m * 0.3m * 1.5m) including materials, coil earthing per pole & pole earthing, normal ground- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), normal ground- erection of stay set, rocky ground (medium)- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), rocky ground- erection of stay set, hard rock requires blasting & chisseling- excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for stay set), hard rock requires blasting & chisseling- erection of stay set, loading and unloading charges of oil drums (with oil), loading and unloading charges of oil drums (without oil), loading and unloading charges of conductor drum, cable drum, loading and unloading charges of line materials, loading and unloading charges of metering set, 11kv lines-(pin point) fixing of v & channel cross arm 5.5 including transporting of materials from road side to sit