Tender For corrigendum : supply, installation and commissioning of rake test rig (rtr), make-escort or equivalent as per attached drawing and specification annexure-a. [ warranty period: 30 months after the date of delivery ]
Tender For supply and commissioning of rake test rig complete along with trolley & flexible hoses each 3 mtrs. long with coupling to connect. compressed air line, fp & bp pipe of coach to rig (suitable for twin pipe graduated released air brake testing of bg coaches as per testing procedure in indian railway) as per attached technical specification and drawing. [ warranty period: 30 months after the date of delivery ]
Tender For supply, installation & commissioning of automatic computerized scada based rake test rig (rtr) for alltypes of wagon/coach along with test bench as per attached specification. [ warranty period: 30 months after the date of delivery ]
Tender For supply, installation and commissioning of automatic computerized rake test rig (scada based) as per attached specification at annexure-a. [ warranty period: 24 months after the date of delivery ]
Tender For supply of provision, fixing ,testing and commissioning of air pipe line ( working pressure 8 to 10 kg /sq cm) between rake test rig andcoach as per attached annexure [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply, installation and commissioning of automated computerization of scada based rake test rig suitable for testing all type of ir coaches/ wagons (both twin pipe and single pipe system) as per the specification attached. [ warranty period: 24 months after the date of delivery ]
Tender For corrigendum : supply, installation, testing and commissioning and training of staff of computerized rake test rig technical specification as per annexure-a. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply, installation & commissioning of fully automated computerized rake test rig (rtr) for icf & lhb coaches, specification as per annexure attached. [ warranty period: 30 months after the date of delivery ]