Web Analytics Made Easy - StatCounter

Iron Drum Tenders

Get complete information related to latest Iron Drum Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Iron Drum Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Iron Drum Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40277992 Due date: 20 May, 202520 May, 2025 NA
Tender For annual rate: 2025-26 rates of supplying, stacking bituminious materials and labour work on various roads of vyara and dolvan taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accord

State Government

CTN :40277995 Due date: 20 May, 202520 May, 2025 NA
Tender For annual rate : 2025-26 rates of supplying , stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance w

State Government

CTN :40277999 Due date: 20 May, 202520 May, 2025 NA
Tender For annual rate : 2025-26 rates of supplying, stacking bituminous materials and labour work on various roads of valod taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with t

corporations/Associations/Others

CTN :40274983 Due date: 15 May, 202515 May, 2025 NA
Tender For auction sale of uppal_copper arm cable cut pieces,uppal_2*2 light fittings,hi tech, ohris atom_2*2 light fittings,hi tech, ohris atom_iron floor tiles,uppal_eol batteries front covers p.,uppal_iron scrap misc/gi scrap misc/iron drum,uppal_alu arm&non arm- cable cut pieces,warangal msc_iron scrap-dg exhaust,warangal msc_aluminium-dg cladding

corporations/Associations/Others

CTN :40109819 Due date: 12 May, 202512 May, 2025 23.25 Lacs
Tender For supply of hardware items. - woodan handels for pick axe (trikam), woodan handels for spades (pawada), woodan handels for panjeti, iron drum for bakri ieed, black miniyu, tadpatri, galvenais tagara, lokhand ni panjeti, pavda
 Loading, Please wait...

Connect us via What's Up