Web Analytics Made Easy - StatCounter

Iron Dust Fines Tenders

Get complete information related to latest Iron Dust Fines Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Iron Dust Fines Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Iron Dust Fines Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

corporations/Associations/Others

CTN :40065332 Due date: 28 Apr, 202528 Apr, 2025 NA
Tender For supply of iron dust fines/mill scale 1000 mt 25% by road up to rajban cement factory, distt. sirmour

Central Government/Public Sector

CTN :40026891 Due date: 19 May, 202519 May, 2025 NA
Tender For supply of wear plate, confirming to plasser part no. 62.08.8032. specification: "special designed bi -metal wear resistances plate developed by weld overlay process as per following details:- (1)base materi al:- the base material will be hardox-400 or equivalent material with following chemical composition. car bon=0.14-0.32%, chromium=0.30-1.40%, manganese=1.60% max, molybdenum=0.25- 0.60%, silicon= 0.70% max, nickel=0.25 -1.50%. (2)hardness of base material 370- 420 bhn. (3)weld deposit:- thickness of weld overlay deposit should be at least 5 mm. the weld overlay deposit will be of enrich complex carbi de offering almost 35-45% primary carbides concentration to ensure enhanced life of minimum as specifi ed at performance warranty, with alloy basis of c, cr, mn, v, b, si with hardness of 380- 430bhn. make/br and: - plasser or equivalent. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40026894 Due date: 20 May, 202520 May, 2025 NA
Tender For supply of description :- wear plate, confirming to plasser part no. 64.08.1209. specification: "speci al designed bi-metal wear resistances plate developed by weld overlay process as per following details:- ( 1)base material:- the base material will be hardox-400 or equivalent material with following chemical co mposition. carbon=0.14-0.32%, chromium=0.30-1.40%, manganese=1.60% max, molybdenum=0.25- 0. 60%, silicon= 0.70% max, nickel=0.25 -1.50%. (2)hardness of base material 370- 420 bhn. (3)weld depo sit:- thickness of weld overlay deposit should be at least 5 mm. the weld overlay deposit will be of enrich complex carbide offering almost 35-45% primary carbides concentration to ensure enhanced life of mini mum as specified at performance warranty, with alloy basis of c, cr, mn, v, b, si with hardness of 380- 43 0bhn. rdso drawing: tm/9315/3 rev-1 make/brand: - plasser or equivalent. [ warranty period: 30 m onths after the date of delivery ]

Central Government/Public Sector

CTN :40026898 Due date: 21 May, 202521 May, 2025 NA
Tender For supply of wear plate, confirming to plasser part no. 64.08.10188. specification: "special designed bi-metal wear resistances plate developed by weld overlay process as per following details:- (1)base mate rial:- the base material will be hardox-400 or equivalent material with following chemical composition. ca rbon=0.14-0.32%, chromium=0.30-1.40%, manganese=1.60% max, molybdenum=0.25- 0.60%, silicon= 0.70% max, nickel=0.25 -1.50%.. (2)hardness of base material 370- 420 bhn. (3)weld deposit:- thicknes s of weld overlay deposit should be at least 5 mm. the weld overlay deposit will be of enrich complex car bide offering almost 35-45% primary carbides concentration to ensure enhanced life of minimum as speci fied at performance warranty, with alloy basis of c, cr, mn, v, b, si with hardness of 380- 430bhn. rdso drawing: rdso/tm/16/22 [ warranty period: 30 months after the date of delivery ]

CTN :39966885 Due date: 09 May, 202509 May, 2025 NA
Tender For supply of pig iron with chemical composition as: carbon (c) : 3.50% - 4.70%, manganese (mn ) : 1.00% (max.), silicon (si) : 1.50% (max.), sulphur (s) : 0.05% (max.), phosphorus (p) : 0.05% (max.) and is: 13502 / 2023 or latest to be followed for size and mass, sampling plan, test method and criteri a for conformity. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up