Get complete information related to latest Jcb Loader Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Jcb Loader Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Jcb Loader Repair Tenders.
Tender For supply of load sensing device for bobr/bobrn wagons, conforming to rdso specification no.- 0 2-abr-02 with 4 amendments [last amendment-4 of sept. 2016; ]
Tender For supply of electronic toe load measuring device(etlmd) as per rdso specification no. tm/sm/etlmd/2 18 (fourth revision - 2022) [ warranty period: 30 months after the date of delivery ]
Tender For supply of electronic toe load measuring device as per rdso specification no tm/sm/etlmd/ 218 (fourth revision 2022) [ warranty period: 12 months after the date of delivery ]
Tender For supply of disconnecting and earthing device 8 pole 2 way on - off on load 63a 750 volt ac ( 1000 v ins ulation) 2no + 2nc with heavy handle and pad locking arrangement in earth position mounted in a stainles s steel enclosure suitable for ac 23 duty confirming to is : 13947/ iec 947 suitable for non ac lhb coaches . as per rcf spec .no.edts - 355 rev - 01) make : salzer/ l&t cat no 73342sib32logbss. [ warranty p eriod: 30 months after the date of delivery ]
Tender For supply of disconnecting and earthing device, 8 pole, 2 way, no-off on load, 63a 750v ac (1000v insulation), 2no + 2nc with heavy handle n/a spec:is/iec 60947-3 (1999)
Tender For supply of empty load device ir-eld -10 to r.d.s.o's drg. no. wd - 84074 - s - 01 - rc, alt- 3. mate rial and specification as per drawing [ warranty period: 30 months after the date of delivery ]
Tender For supply of disconnecting and earthing device, 8 pole, 2 way, no off on load 63a, 750 v ac (1000 v- insulation), 2 no+2nc with heavy duty handle & pad locking arrangement in earth position, mounted in a stainless steel enclosure, suitable for ac-23 duty confirming to is 13947/iec 947 as per edts-355, rev-01, amendment-1 to schaltbau cat. no. m137.0827407 and l&t cat. no. 73342slb321 06b only acceptable specn: is 13947/iec 947. [ warranty period: 30 m onths after the date of delivery ]
Tender For supply of disconnecting and earthing device, 8 pole 2 way, without off, on load 125 a at 1000 v a c, 2 no + 2nc and with heavy duty handle and pad locking arrangement in off position, mounted in a s tainless steel enclosure suitable for ac 23 duty conforming to iec 60947. max depth including handle 4 80 mm as per rdso specn. no. rdso/pe/spec/ac/0184-2015 (rev.1). accepted makes as per rdso l etter no. el7.1.108/mssbc dated 17.09.2021. l&t-salzer, schaltbau, techno trendz(25% quantity) or any other make with prior approval of rdso. [ warranty period: 30 months after the date of delive ry ]
Tender For installation, testing, commissioning and supply of lcd solar power plant (roof top) for ong rid system, three phase 17kw power with output voltage 415v, complete with solar spv array, module m ounting structure, power conditioning unit (pcu) consisting of maximum power point tracker (mppt), invert er (200v-800v, max output current- 27a) and controls & protections, inter connect cables and switches. sw itching device-igbt, pure sine wave output, ip-65, electric cable for input (pv module to inverter)- 1x4 sq.m m copper cable, lengh-25 mtr, electric cable for output (inverter to net meter)- 3.5x10 sq.mm copper cable , lengh-30mtr, lightning arrester, earthing, danger board, pv module (as per is: 14286) rating- 250-1000wp , no. of pv module- 51 nos., total load on roof- 60 kg per sq.m (max), minimum clearance of structure from roof level- 300mm, suitable to withstand wind pressure of 180km/hr, area required for installation- 180sq. m. installation & testing of the complete system including civil work, designing, cabling work with suitable c lamps & fasteners etc. make- tata power solar, vikram solar, spj solar or similar warranty of solar power pl ant -warranty & guarantee : warranty of pv modules : >/= 25 years from the date of commissioning warra nty of inverter : 8 years from the date of commissioning minimum guarantee for maintaining of output peak watt capacity : >/= 90% at the end of 10 years and >/= 80% at the end of 25 years ]