Get complete information related to latest Jcb Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Jcb Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Jcb Repair Tenders.
Tender For tggenco-btps - engaging of 02 no.s back hoe loaders of engine capacity not less than 48 hp for clearing of grid jams at wagon tippler-1 and 2, track hopper-1a and 1b grids at contingency arrangement-1 and 2 on round the clock basis for arranging uninterrupted coal feeding for a period of 01 year from the actual date of commencement of work.
Tender For slip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 92.880 to 121.550 stretch of nh-09 during mansoon season 2025 -26 and upcoming duration.
Tender For slip clearance work by back hoe loader and tracked hydraulic excavator for smooth and safe traffic from km 142.00 to 145.100 stretch (according to old chainage) of nh-09 during mansoon season 2025-26 and upcoming duration.
Tender For slip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 0.00 to 93.00 stretch of nh-309 a during mansoon season 2025 -26 and upcoming duration.
Tender For lip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 163.00 to 194.800 stretch of nh-09 during mansoon season 2025 -26 and upcoming duration.
Tender For slip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 128.310 to 135.075 an km 143.750 to 162.768 (according to design chainage) stretch of nh-09 during mansoon season 2025 -26 and upcoming dura
Tender For btps - chp - engaging of 02no back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler-1 and 2 and on track hopper-1a and 1b grid for facilitating further unloading of coal tipper and also for removal of spilled over coal while unloading of coal trucks pouring back the same into the respective grids and also for clearing the chain conveyor jams at contingency arrangement-1 and 2 on round the clock basis for arraigning uninterrupted coal feeding to the units-1,2,3 and 4 of btps for the period of 45 days from 16.05.2025 or from actual date of commencement of work.