Get complete information related to latest Lc Gate Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Lc Gate Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Lc Gate Repair Tenders.
Tender For carrying out of geotechnical investigation work in connection with construction of rob in lieu of level crossings at different locations under the jurisdiction of sealdah division of eastern railway total 14 numbers level crossings
Tender For (i) trr (p) of 7.661 km over aged rail renewal over major bridges and its approaches under the jurisdiction of sse/p.way-ii/bndm (ii) rajkhasawan-bondamunda - through ballast renewal of points and crossings under the jurisdiction of aden/west/ckp
Tender For zonal work in zone no. 3 for period ending 30.06.2026, jurisdiction: aishbagh colony, polyclinic & service building, aishbagh railway station, station/service building , lucknow city and daliganj rly. station/service building & colony. (except level crossings & bridges.)
Tender For manufacture and supply of 1 in 16 cms crossing bg (1673mm) for 60kg(uic)/60e1 on psc sleepers conforming to rdso drg. no. t-5693, alt.3 complete with fittings as listed in the drawin g excluding grooved rubber sole plates, check rails, insulating liners, fish plates, fish bolts with nu ts, elastic rail clips etc. specification: as per irs specification for cast manganese steel (cms) crossi ngs and weldable cast manganese steel (wcms) crossings, serial no. irs: t-29 (revised 2024). this is a safety item. [ warranty period: 30 months after the date of delivery ]
Tender For supply of dual gauge 1 in 12 turn out t/d variant rh/lh turn-outs of uic 60 kg rails (for laying on dual gauge psc sleepers) with thick web switches and weldable cms crossings including rai ls, all components, fittings and fastenings complete in all respect (except psc sleeper, erc mk-v) by t he rdso certified venders (for supply of 1 in 12 turn outs) with documentary proof of having supplied this material anywhere globally and working satisfactorily. [ warranty period: 36 months after the d ate of delivery ]