Tender For providing of hiring of consultants - milestone/deliverable based - techno legal service; legal consultant/ advisor, legal/ policy/ regulatory; yes; hybrid(as specified in scope of work)
Tender For corrigendum : providing of hiring of consultants - milestone/deliverable based - techno legal service; legal consultant/advisor, legal/policy/regulatory; yes; hybrid(as specified in scope of work)
Tender For corrigendum : providing of hiring of consultants - milestone/deliverable based - techno legal service; legal consultant/ advisor, legal/ policy/ regulatory; yes; hybrid(as specified in scope of work)
Tender For corrigendum : supply of supply installation testing and commissioning of precision air conditioning system for server room : : -supply installation testing and commissioning of precision air conditioning system for server room : : -indoor unit , remote condenser , start-up service , asset advisor service , accessories , hard drawn copper pipe , outdoor interconnecting flexible cable , sequential cable , hard pvc drain pipe , refrigerant gas , danfoss 320 hv oil , ladder tray , m s stand of indoor unit , m s stand of outdoor unit , unloading, lifting and shifting , installation, positioning and commissioning , additional item 1 , additional item 2
Tender For corrigendum : residual lifeassessmentstudy (rla) of boiler pressure part including 5000 mtr corrosion mapping of boiler water walls tubes by remote electromagnetic technique of boiler 2x250 mw unit no. 10 and 11 stps, sarni - name of work-residual lifeassessmentstudy (rla) of boiler pressure part including 5000-meter corrosion mapping of boiler water wall tubes by remote electromagnetic technique of boiler 2x250mw, unit no. 10 & 11 stps, mppgcl, sarni
Tender For corrigendum : providing of hiring of consultants - milestone/deliverable based - techno legal service; legal consultant/ advisor, legal/ policy/ regulatory; yes; hybrid(as specified in scope of work)
Tender For corrigendum : residual lifeassessmentstudy for chemical recovery boiler no.3 at srp - mechanical in tnpl unit - i - residual lifeassessment (rla) study for chemical recovery boiler no.3 at srp - mechanical in tnpl unit - i